Udine - April 19th Data Check for MAGIC Raquel de los Reyes Universidad Complutense de Madrid (U.C.M.)
Udine - April 19th Contents The program Central control data check DAQ data check Conclusions
Udine - April 19th Program Group of scripts and Root macros to check the subsystems and the data taken at the end of each night shift. Two scripts: CCDataChecking & DAQDataChecking Two macros: CCDataCheck.C & DAQDataCheck.C Thanks to F. Goebel and R. Wagner
Udine - April 19th Central control data check Drive system General camera status Camera HV Camera DC Camera LV Cooling system Trigger system Trigger macro cells Weather station
Udine - April 19th Drive system (CC_2004_02_15.ps) CrabNebula OffMrk421-1 Mrk421 OffCrab4 21:58 & 03:22 :Cosy crashed no reported Thanks to T. Bretz and D. Dorner
Udine - April 19th General camera status (CC_2004_02_15.ps) 21:35: Guagua crashed Change source: OffCrab4 – Mrk421Move to CrabNebula End shift
Udine - April 19th Camera High Voltages (HV) (CC_2004_02_15.ps) Failure of master voltage regulator boards and the six adc boards monitoring HV y DC in sectors 3-5 no reported 21:35: Guagua crashed Thanks to J.Flix
Udine - April 19th Camera Direct Currents (DC) (CC_2004_02_15.ps) 21:35: Guagua crashed no reported
Udine - April 19th Camera Low Voltages (LV) (CC_2004_02_15.ps) 21:35: Guagua crashed no reported
Udine - April 19th Cooling system (CC_2004_02_15.ps) Thanks to E. Domingo and R. Firpo
Udine - April 19th Trigger system (CC_2004_02_15.ps) 21:26: ZetaTauri Pedestal runs(PED)/calibration runs(L1_5NN:L2_DEFAULT) Thanks to R. Paoletti and A. Stamerra Calibration runs Firing macrocells 2 and 7 Low threshold pixels 3, 9 and 21
Udine - April 19th Trigger macro cells (CC_2004_02_15.ps) UMa51 in pixels 3, 9 and 21: Macrocells 2 and 7 Fire not reported: Pixels(HW) 88, 89, 123, 124, 125, 165, 166
Udine - April 19th Weather station (CC_2004_02_15.ps) Thanks to A. Torres
Udine - April 19th DAQ data check Pedestal Calibration Conversion factor Defect pixels Fitted charges Reduced sigma per charge Absolute arrival times Timing
Udine - April 19th Pedestals (IFAE sample C (on): 15/ )
Udine - April 19th Calibration (I): Conversion factor (IFAE sample C (on): 15/ ) Thanks to J. Cortina and M. Gaug
Udine - April 19th Calibration (II): Defect pixels (IFAE sample C (on): 15/ )
Udine - April 19th Calibration (III): Fitted charges (IFAE sample C (on): 15/ )
Udine - April 19th Calibration (IV): Reduced sigma per charge (IFAE sample C (on): 15/ )
Udine - April 19th Calibration (V): Absolute arrival times (IFAE sample C (on): 15/ )
Udine - April 19th Timing ( CrabOn: 17/ – ) Thanks to M. López
Udine - April 19th Conclusions The CC check plots will allow us to take a look to night conditions and hardware problems. The DAQ check plots will make a preliminar analysis of night data. In the future these scripts could interact with the DataBase to collect the hardware problems. STATUS: CC data check running DAQ data check in tests.