Udine - April 19th 20041 Data Check for MAGIC Raquel de los Reyes Universidad Complutense de Madrid (U.C.M.)

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

Max-Planck-Institut für Gravitationsphysik - Albert-Einstein-Institut DC Meeting Golm - Karsten Kötter1 Current status of DAQ System
20 Abr 2004Udine bootcamp1 First Analysis Results of the Crab Nebula and Mrk421 M. López Moya U.C.M. 1.Analysis chain 2.Mrk421 Camera rotation study Light.
Active Mirror1 Control (PC) Active Mirror1 Control (PC) Central Control (PC) Central Control (PC) Telescope Drive1 Control (PC) Telescope Drive1 Control.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 24, 2007.
GLAST LAT Project IA weekly meeting, February 3, 2006 ACD subsystem Alex Moiseev 1 ACD Pedestals ACD Team at Goddard: Alex Moiseev Dave Thomspon Bob Hartman.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
ACD calibrations Pedestals Measured from online script Measure PHA w/ HV off, no charge injection Use cyclic triggers ~ ADC counts, very narrow.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
Misspointing corections using DCs from stars. Javier López IFAE Software Udine 19th-20th April 2004.
1 TPC online  offline calibration November 2002.
Leroy Nicolas, HESS Calibration results, 28 th ICRC Tsukuba Japan, August Calibration results of the first two H·E·S·S· telescopes Nicolas Leroy.
Online & Offline software at H.E.S.S.  The H.E.S.S. Experiment  Data storage & Off-line software  Acquisition software  ROOT Problems/Wishlist ROOT.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
1 SSD status report – 16 July 2004 Jerome Baudot, Strasbourg STAR Collaboration Meeting BNL, 16 July 2004 Silicon Strip Detector status report  Report.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Friday, April 23, 2004University Udine, Italy Razmick Mirzoyan MPI Munich Where do we stay after having seen the first signals from Crab and Mrk-421 ?
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Data Acquisition System of SVD2.0 This series of slides explains how we take normal, calibration and system test data of the SVD 2.0 and monitor the environment.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
1 N. BrunerUniv. of New Mexico MuTr Software  Online  Calibration  Offline.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
Ckov status David Lange, Doug Wright LLNL May 4, 2004.
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
1 Checks on SDD Data Piergiorgio Cerello, Francesco Prino, Melinda Siciliano.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
Test of Single Crystal Diamond Pixel Detector at Fermilab MTEST Simon Kwan Fermilab April 28, 2010.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Optical Astronomy with Cerenkov telescopes E. Oña-Wilhelmi 1,2, O.C. de Jager 1, J. Cortina 3, V. Fonseca 2 1 NWU, Potchefstroom, South Africa. 2 UCM,
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Towards new Graphical User Interfaces for nTOF experiment Collaboration meeting, Bologna 28 th Nov 2013 Towards new Graphical User Interfaces for nTOF.
Tuning of trigger simulation parameters (Bossi, Moulson, Palutan, Sciascia) Calorimeter trigger thresholds calibration using prompt photons from K S 
Summary of IFAE analysis of Crab and Mrk421 for February & March 2004Udine bootcamp, 19th-22nd April STATUS OF DATA ANALYSIS Javier Rico for the IFAE group.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
ECAL Shift Duty: A Beginners Guide By Pourus Mehta.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
P. Paolucci G. Pugliese M.Tytgat
LKr status R. Fantechi.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Weekly PDL report (Jul 7-14)
DAQ for ATLAS SCT macro-assembly
The Standard Analysis chain
Large CMS GEM with APV & SRS electronics
BTeV Pixel Silicon Detector
Test Beam Measurements october – november, 2016
Equipment Tests for DHC Tower
The Online Detector Control at the BaBar experiment at SLAC
RPC Detector Control System
Signal studies OUTLINE 1- Signal extraction
Pierluigi Paolucci & Giovanni Polese
Status of the Calibration
Presentation transcript:

Udine - April 19th Data Check for MAGIC Raquel de los Reyes Universidad Complutense de Madrid (U.C.M.)

Udine - April 19th Contents The program Central control data check DAQ data check Conclusions

Udine - April 19th Program Group of scripts and Root macros to check the subsystems and the data taken at the end of each night shift. Two scripts: CCDataChecking & DAQDataChecking Two macros: CCDataCheck.C & DAQDataCheck.C Thanks to F. Goebel and R. Wagner

Udine - April 19th Central control data check Drive system General camera status Camera HV Camera DC Camera LV Cooling system Trigger system Trigger macro cells Weather station

Udine - April 19th Drive system (CC_2004_02_15.ps) CrabNebula OffMrk421-1 Mrk421 OffCrab4 21:58 & 03:22 :Cosy crashed no reported Thanks to T. Bretz and D. Dorner

Udine - April 19th General camera status (CC_2004_02_15.ps) 21:35: Guagua crashed Change source: OffCrab4 – Mrk421Move to CrabNebula End shift

Udine - April 19th Camera High Voltages (HV) (CC_2004_02_15.ps) Failure of master voltage regulator boards and the six adc boards monitoring HV y DC in sectors 3-5 no reported 21:35: Guagua crashed Thanks to J.Flix

Udine - April 19th Camera Direct Currents (DC) (CC_2004_02_15.ps) 21:35: Guagua crashed no reported

Udine - April 19th Camera Low Voltages (LV) (CC_2004_02_15.ps) 21:35: Guagua crashed no reported

Udine - April 19th Cooling system (CC_2004_02_15.ps) Thanks to E. Domingo and R. Firpo

Udine - April 19th Trigger system (CC_2004_02_15.ps) 21:26: ZetaTauri Pedestal runs(PED)/calibration runs(L1_5NN:L2_DEFAULT) Thanks to R. Paoletti and A. Stamerra Calibration runs Firing macrocells 2 and 7 Low threshold pixels 3, 9 and 21

Udine - April 19th Trigger macro cells (CC_2004_02_15.ps) UMa51 in pixels 3, 9 and 21: Macrocells 2 and 7 Fire not reported: Pixels(HW) 88, 89, 123, 124, 125, 165, 166

Udine - April 19th Weather station (CC_2004_02_15.ps) Thanks to A. Torres

Udine - April 19th DAQ data check Pedestal Calibration Conversion factor Defect pixels Fitted charges Reduced sigma per charge Absolute arrival times Timing

Udine - April 19th Pedestals (IFAE sample C (on): 15/ )

Udine - April 19th Calibration (I): Conversion factor (IFAE sample C (on): 15/ ) Thanks to J. Cortina and M. Gaug

Udine - April 19th Calibration (II): Defect pixels (IFAE sample C (on): 15/ )

Udine - April 19th Calibration (III): Fitted charges (IFAE sample C (on): 15/ )

Udine - April 19th Calibration (IV): Reduced sigma per charge (IFAE sample C (on): 15/ )

Udine - April 19th Calibration (V): Absolute arrival times (IFAE sample C (on): 15/ )

Udine - April 19th Timing ( CrabOn: 17/ – ) Thanks to M. López

Udine - April 19th Conclusions The CC check plots will allow us to take a look to night conditions and hardware problems. The DAQ check plots will make a preliminar analysis of night data. In the future these scripts could interact with the DataBase to collect the hardware problems. STATUS: CC data check running DAQ data check in tests.