1 Colombia Firm Energy Auction Peter Cramton (joint with Steven Stoft) 18 December 2006.

Slides:



Advertisements
Similar presentations
The Single Electricity Market in Ireland
Advertisements

© 2013 Day Pitney LLP Overview and Update on the Ever-Evolving New England Wholesale Capacity Market presentation to Boston Bar Association May 23, 2013.
Brookfield Renewable Energy Group. Focusing on Renewable Power Generation and Transmission Conceptual discussion how to integrate renewable resources under.
Winter 2013/2014 Reliability Solution Including LNG MWHs N. Jonathan Peress Conservation Law Foundation Greg Lander Skipping Stone NEPOOL Markets & Reliability.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Pablo Serra Universidad de Chile Forward Contracts, Auctions and Efficiency in Electricity Markets.
Technical Conference Avoided Cost Modeling January 6, 2015.
Enhancing Capacity Markets to Improve Resource Performance and Investment Pay For Performance: New England’s Capacity Market OPSI 10 TH ANNUAL MEETING.
Taking into Account Regulatory Risk Professor Joshua Gans University of Melbourne.
Resource Adequacy in PJM
More Insurance How much insurance We started talking about insurance. Question now is “how much?” Recall that John’s expected utility involves his wealth.
1 Resource Adequacy and Market Power Mitigation via Option Contracts Hung-po Chao and Robert Wilson EPRI and Stanford University Presentation at POWER.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
Solutions to California’s Energy Crisis: Real-Time Pricing by Frank Wolak Chairman, Market Surveillance Committee March 17, 2001.
Equilibrium and Efficiency
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
The Convergence of Market Designs for Adequate Generating Capacity Peter Cramton and Steven Stoft 24 March 2006.
A Capacity Market that Makes Sense Peter Cramton & Steven Stoft 18 March 2005.
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
Reliability Pricing Model (RPM) Overview Andrew Ott PJM Senior Vice President, Markets.
Economic Demand Response Sheldon Fulton Executive Director, IPCAA November 4, 2008.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
RISK & CAPACITY INVESTMENT INCENTIVES IN ELECTRICITY MARKETS Peter Jackson Department Of Management University Of Canterbury.
Reliability Charge Colombia, an investment oportunity Paris, Octuber 15-16th, 2007.
Perfect Competition *MADE BY RACHEL STAND* :). I. Perfect Competition: A Model A. Basic Definitions 1. Perfect Competition: a model of the market based.
1 Quiz next Thursday (March 15) Problem Set given next Tuesday (March 13) –Due March 29 Writing Assignment given next Tuesday (March 13) –Due April 3.
THE PJM INTERCONNECTION STATE OF THE MARKET REPORT 2001 Joseph E. Bowring Manager PJM Market Monitoring Unit Federal Energy Regulatory Commission June.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
Overview of the Capacity Markets in the United States 2008 APEX Conference in Sydney, Australia October 13-14, 2008 Hung-po Chao Director, Market Strategy.
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
1 Capacity Markets Investment in Generation Capacity Payments October 31, 2005 J. W. Charlton.
Colombian Firm Energy Market: Discussion and Simulation Peter Cramton (joint with Steven Stoft and Jeffrey West) 9 August 2006.
MAY 17, 2001 ENERGY MARKETS IN TURMOIL PRESENTED TO THE INSTITUTE FOR REGULATORY POLICY STUDIES
1 Colombia Capacity Auction Peter Cramton (with many ideas from Steven Stoft) 9 June 2006.
Colombia’s Forward Energy Market Peter Cramton University of Maryland 5 November 2007.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
CHAPTER 12 Competition.  What is perfect competition?  How are price and output determined in a competitive industry?  Why do firms enter and leave.
New Regulatory Scheme to Guarantee Power Reliability Colombia, an investment oportunity Santo Domingo, March 14-15, 2007.
ACC 424 Financial Reporting II Lecture 13 Accounting for Derivative financial instruments.
Chapter 14 Equilibrium and Efficiency. What Makes a Market Competitive? Buyers and sellers have absolutely no effect on price Three characteristics: Absence.
Leader-Follower Framework For Control of Energy Services Ali Keyhani Professor of Electrical and Computer Engineering The Ohio State University
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
Contribution. Definition of contribution Contribution is the difference between sales revenue and variable cost Contribution is the difference between.
An update on the Market Development Program Phil Bishop New Zealand Electricity Commission Presentation to the EPOC Winter Workshop 3 September 2009.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
What Was Learned From the 2015 Transition and Base Residual Auction Results? October 13, 2015 OPSI Annual Meeting CP Auction results – A DR perspective.
S PIEGEL & M C D IARMID New England’s Forward Capacity Market: How Did We Get Here and Where Are We Going? Scott H. Strauss APPA Legal Seminar Cambridge,
I2 U Intelligent Supply Chain Management Course Module Twelve: Inventory Deployment.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
Introduction to Economics of Water Resources. Public or private Excludability (E): the degree to which users can be excluded Subtractability (S): the.
Electric Capacity Market Performance with Generation Investment and Renewables Cynthia Bothwell Benjamin Hobbs Johns Hopkins University Work Supported.
18 – Monetary Policy Chapter 18. Monetary Policy Tools Policy tools – Target federal funds rate – Discount rate – Reserve requirement Effective policy.
Announcements Homework 8 is 11.19, 11.21, 11.26, 11.27, due now
Todos los derechos reservados para XM S.A E.S.P. October, 2006 Luis Alejandro Camargo S. Wholesale Market Manager XM S.A. E.S.P. THE NEW COLOMBIA FIRM.
Linnfall Consulting Market design: the energy-only market model Linnfall Consulting September 2015.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
NYISO Capacity Markets: Function, Performance, and Future Presented to: Joint Technical Conference on New York Markets & Infrastructure Docket No. AD
California Independent System Operator 1 Department of Market Analysis California Independent System Operator California ISO Creation Time: July,
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
Resource Adequacy and Market Power Mitigation via Option Contracts
Electricity Wholesale Markets: Designs for a low-carbon future
Benefits of New England’s Proposed Capacity Market
Generation Expansion Daniel Kirschen
Market Design in New England
Summary Issue Modification Aim Effect of the mod Impacts
Wholesale Electricity Costs
Presentation transcript:

1 Colombia Firm Energy Auction Peter Cramton (joint with Steven Stoft) 18 December 2006

2 Outline Purpose of market Why forward procurement? Key features –Product –Planning period –Commitment period –Cost of new entry (CONE) –Demand curve –Descending clock auction –Price formation –Performance incentives –Fail-safe mechanism –Secondary market Transition Supplier concerns

3 Purpose of Market

4 Purpose of market Induce just enough investment to maintain adequate resources Induce efficient mix of resources Reduce market risk Avoid market power in firm energy market Reduce market power in energy market Pay no more than necessary

5 Why forward procurement?

6 New projects compete in advance of entry –Coordinated entry Less uncertainty in achieving target Avoid boom/bust New resources set price directly Less reliance on demand curve for price setting Long-term commitment for new resources –Reduced investor risk –Better price signal for new investment

7 Key features

8 Key Features Product Planning period Commitment period Cost of new entry (CONE) Demand curve Descending clock auction Price formation Performance incentives Fail-safe mechanism Secondary market

9 Product

10 Product Firm energy ― availability of energy during scarcity events –Dry year (seasonal scarcity) –Outages (spot scarcity) Scarcity event defined by high energy price –Energy price is a transparent trigger –Energy price is a reliable trigger

11 Product Physically-backed energy option Firm energy defined by delivery capability in worst-case benchmark ― a very dry year –Nameplate capacity (maximum output rate) –Firm energy (average energy output rate in worst-case benchmark) Thermal example: 92% of nameplate due to outages Hydro example: 35% of nameplate due to limited water Strike price = Gas index  high heat rate + other VC –Gas index = New York Harbor residual fuel oil –High heat rate = MBTU/MWh –Other variable cost = $15.20/MWh This is less than the heat rate of all existing gas units New thermal peakers have heat rates of 9-10

target 2005 actual 0%50%100% Duration Load (GW) Firm Energy Target Load Duration Curve and Firm Energy Target growth Target peak load

13 Single product; single price In a hydro-dominated system, there is a single reliability constraint: firm energy to cover dry year Single constraint implies single product and single price Each new resource is rated for its incremental contribution to the firm energy constraint

14 Product is: Firm energy + mandatory hedge Firm energy = –Expected annual drought-year energy contribution to system (if unit disappeared, how much less energy would the system have—same for hydro and fossil) Mandatory hedge = –Obligation follows load in aggregate Unit’s daily obligation based on its firm energy Obligation over day tied to dispatch Matching obligations with dispatch improves the performance of the spot energy market –Rewarded by spot price if produce more than obligation in scarcity hours

15 Obligation Purchase by load is translated into an obligation for each supplier –If 98% of target is purchased, then aggregate supplier obligation is 98% of load in each hour Load is unhedged for 2% of load that is not purchased –True-up at end of each month to adjust for deviation between monthly target and actual monthly load If actual load is 102% of month’s target, then obligations are scaled down by 100/102. Penalties/rewards are calculated on this basis. –Risk from unanticipated load growth is born by load, not suppliers

16 Settlement Settlement is just like settling a conditional contract for differences in each hour If spot price < strike price, then no obligation If spot price > strike price, then settle differences: reward or penalty = (Q supplied – Q obligation)  (P spot - P strike) Same as supplier buying from spot market to satisfy obligation. Same outcome if done on unit basis or portfolio basis Supplier optimizes portfolio just as without option

17 Planning period

18 Planning period Time between auction date and start of commitment 4 years ― long enough for new entry to occur (except large hydro projects) Makes firm energy market contestable and allows new entry to set the price –Existing resources would set the wrong price because of sunk costs and market power

19 Long lead-time projects 4-year planning period may be too short for large hydro projects (6-8 years to build) Allow large hydro projects to lock in auction price from 4- year ahead auction seven years (or less) ahead Large hydro project is price taker Decides after auction a fraction of its firm energy to lock in at 4-year ahead auction price Total quantity of firm energy in years > 4 that load purchases is limited by a percent of new firm energy required in that year based on planning projections

20 Planning period First auction Nov 2007 (2011): 3 year Second auction Jun 2008 (2012): 3.5 year Third auction Nov 2008 (2013): 4 year All later auctions (2014…): 4 year

21 Commitment period

22 Commitment period New resources ― up to 20 years –Supplier selected at qualification –Long commitment lets new resources lock-in firm energy price, reducing risk and encouraging investment –Price is in constant $ (adjusted for inflation) Existing resources ― one year –Does not need long commitment, since costs are already sunk –Short commitment reduces risk (more draws from price distribution)

23 Demand curve

24 Demand curve Price of firm energy Firm energy Target CONE 2 CONE CONE = Cost of New Entry (marginal unit) 0 Curve reflects marginal value of firm energy Able to withstand scarcity events worse than worst- case benchmark ½ CONE Price ceiling Price floor  4% Load not fully hedged

25 Descending clock auction

26 Descending clock auction Auctioneer announces high starting price Suppliers name quantities Excess supply is determined Auctioneer announces a lower price Process continues until supply equals demand

27 Starting price Starting price must be set sufficiently high to create significant excess supply Setting too high a starting price causes little harm –Competition among potential projects determines clearing price; high start quickly bid down Setting too low a starting price destroys auction –Inadequate supply or insufficient competition Price of 2 times Cost of New Entry is recommended Note that clearing price will exceed CONE in some years to the extent it is below CONE in other years (of surplus)

28 CONE updates If auction in year t is successful, CONE in year t+1 =.7 CONE in year t +.3 clearing price in year t If auction in year t fails, CONE in year t+1 = CONE in year t

29 Mechanics Clock auction done in discrete rounds In each round, –Auctioneer announces Excess supply at end of prior round Start of round price (higher price) End of round price (lower price) –Each bidder submits a supply curve at all prices between start of round price and end of round price –Auctioneer determines excess supply at end of round price If no excess supply, clearing price determined

30 Price $7.00 $6.63 $6.17 $6.00 Quantity (MW) start-of-round price end-of-round price Individual Supply Bid, Round 6 Activity rule –Bidders can only maintain or reduce quantity as price falls (upward sloping supply curve) “Intraround bids” –More accuracy without too many rounds –Better control of pace of auction –Ties are reduced

31 Price $12.00 = P0 P1 P2 P3 QuantityDemand Round 5 Round 4 starting price clearing price Aggregate supply curve P4 P5 $6.17 = P6 Round 3 Round 2 Round 1 excess supply $6.00 = P6’ Descending clock auction

32 P Q D PCPC S 1. P Q D PCPC S 2.(a) P Q D PCPC S 2.(b) Unit accepted Unit rejected Clearing rule: maximize net value

33 Information policy Demand curve and starting price announced before auction After every round, auctioneer reports –Aggregate supply by hydro, baseload, peaker –Excess supply at end of round price –End of round price for next round (determined from extent of excess supply)

34 New projects are all or nothing Lumpy investment respected; investor does not fear partial acceptance If multiple bidders drop at the clearing price, the group of bids are accepted that minimizes excess supply

35 Price formation

36 Market power Addressing market power in firm energy market is essential Strong incentive to exercise market power –Existing resources have substantial sunk costs –New resources are only a tiny fraction of total –Market is concentrated Any of top-4 suppliers could unilaterally set price Long-term price signals are more stable and efficient if determined from competitive forces, rather than market power

37 Market power solution New resources –Bids are not mitigated in any way –Assumes competition for new resources Existing resources –Resources can opt out of market with either an opt-out bid or retirement bid –Opt-out bid Not revealed during auction Cannot impact the price for existing supply May be rejected for reliability reasons; gets reliability must run payment if rejected –Retirement bid ― permanent opt out of firm energy market Submitted four weeks before start of auction Accepted retirements excluded from any future firm energy payments Retirements may be rejected for reliability reasons, but only if the reliability problem cannot be resolved during the planning period with alternative actions, such as transmission upgrades or new resources Retirements are posted as soon as they are accepted Retirements are replaced with new resources in the auction (represented as a shift to right in the demand curve for all prices below the retirement bid) Repower bids –Replacement of generating unit(s) at existing plant –Replacement unit is bid as new resources –Existing unit is a conditional-retirement

38 Repowering bids Easily accommodated in auction Two types: –Quick switchovers (down time less than 1 year) Repower bid is a new entry bid and a conditional retirement –Extended down time (more than 1 year) Retirement followed by new entry bid 1 or more years later

39 Market power solution New resources almost always set the price Demand curve sets the price in surplus years in which new entry is not needed Retirements occasionally set the price Other than retirements, existing resources never impact the price

40 Replacing accepted opt-outs Opt-outs are replaced by new resources –March up the supply curve revealed in the clock auction But not more than a 30% increase in price Any additional replacements occur in reconfiguration –All new resources receives this higher price Existing resources receive the original clearing price

41 Performance incentives

42 Incentives and hedge Performance incentive comes primarily from energy spot price; this is not changed by hedge Hedge assures that normal performance will receive normal reward in wet and dry years alike Every extra MWh of energy is rewarded the same with or without hedge

43 Energy price motivates performance Hedged resources still face the energy spot price at all times –Those that perform better receive more –Those that perform worse receive less An additional incentive to perform is impact on firm energy qualified for sale in auctions in future years Under performing units are downgraded Over performing units are upgraded

44 Fail-safe mechanism

45 Inadequate supply If, at the starting price, there is insufficient supply of firm energy –New resources are paid starting price –Existing resources are paid 1.1 CONE Rule does not discourage new projects

46 Insufficient competition Existing resources, less retirements, are less than demand at the starting price, At the starting price, the firm energy bid exceeds demand but less than 4% excess, or a supplier’s new resources are pivotal, and At qualification, quantity of new projects from small players (those with less than 15% maximum firm-energy market share) > 50% of required new firm energy Otherwise insufficient competition: –Auction held –New entry paid clearing price –Existing capacity paid 1.1 CONE (or clearing price if less) Rule does not discourage new projects

47 Secondary market

48 Reconfiguration auction Takes place at same time as primary auction –Primary: 4 years ahead –Reconfiguration: 3, 2, 1, 0 years ahead Reconfiguration includes –Adjustment of firm energy target for current forecast –Supplier’s buy/sell to balance position (including dispatchable load)

49 Reconfiguration auction Standard sealed-bid clearing-price auction Same demand curve as in primary auction, netting out resources already purchased No bid mitigation

50 Monthly spot exchange Monthly simultaneous clearing –Standard sealed-bid clearing-price auction –Suppliers buy/sell to balance positions –Demand curve same as in primary auction

51 Transition

52 Transition and timing Transition period –Administrative firm energy price includes a premium for cost of energy option –Existing contracts are modified to subtract the same premium since prices above the strike price are now covered by the firm energy payment, not the contract

53 Reducing risk in early years Early years of auction –Ceiling and floor on firm energy payment to existing suppliers –Spread between ceiling and floor expands after each competitive auction –Spread starts at 0 (transition years) –Increases to Ceiling = 2 CONE Floor =.5 CONE

54 MW Demand Transition Auction date Firm energy to be auctioned Existing supply New supply Nov Jun Nov Nov Nov

55 Supplier concerns

56 Supplier concerns Please note that these concerns were as expressed to CREG on Monday, 5 June 2006, in response to the original CREG proposal. These concerns may not apply to proposal presented here, which is significantly different from the original proposal.

57 1. Approach not used elsewhere Similar approach was adopted in New England (32 GW peak load) in March 2006 –Approach currently being implemented –Approach endorsed by FERC All elements of proposal are commonly used in markets around the world –Options are used everywhere –Clock auctions used for many years in US, UK, France, Germany, Belgium, Hungary, Denmark, …

58 2. Call option increases risk Price Coverage Forward Energy Contract US$100 US$250 US$0 US$250 Forward Energy Contract Energy Option 

59 3. Consumers will pay more Minimizing risk while addressing market power and performance incentives means that consumers will pay less

60 4. Price not a reliable measure of scarcity High prices come from two sources –Scarcity –Market power Option fully addresses market power in spot market; thus, high prices can only come from scarcity If spot prices are still unreliable, then market must have another flaw. Fix it!

61 5. Strike price is too high Why not have a very high strike price? (US$250 or more) –Benefits of call option are largely lost Load hedge Mitigation of market power in spot energy market Mitigation of market power in contract market Risk reduction –No reason to set strike price higher than marginal cost of an expensive thermal unit

62 6. Approach is complex Effective firm energy markets are necessarily complex because the economic challenges are great, especially market power Proposal uses clear and simple market- based methods

63 Questions