Scintillating Fiber, Ribbon Production, Cryo Update Alan Bross MICE Tracker Meeting IC November 8, 2006.

Slides:



Advertisements
Similar presentations
Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status.
Advertisements

MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
Test readiness review ESA ’s prototype BLANC P-E LAMLyon October 2003 Mechanical test plan.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
Russ Rucinski, PPD/MD/DZero Ops DZero Solenoid status November 29, 2004.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Cryo and AFE IIt Update MICE Collaboration Meeting October 22, 2005 RAL A. Bross.
Takashi Matsushita Imperial College T. Matsushita 1 Station 5.
Russ Rucinski, FNAL, Oct. 8, MICE Cryostat Status 1.Prototype cryostat A. Status & Plans B. Parts C. Operating data (supplemental) 2.Four final cryostats.
Scintillating Fiber and Ribbon Production Update Alan Bross MICE Tracker Phone Meeting September 8, 2006.
Russ Rucinski, Fermilab, March 29, Commissioning is underway! –2 Cassettes installed on 3/18. –Sensors and control heater mounted. –Multi-layer.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
1 Start at Estimating Cable Labor Howard Budd University of Rochester Rochester Meeting Nov
Russ Rucinski, FNAL VLPC Cryocooler cryostat Status – June 7, 2006.
Tracker 2 Cryo &Electronics Update Linda Coney, UC Riverside Terry Hart, U Mississippi Ben Freemire, IIT Malcolm Ellis, Brunel University ADB MICE Collaboration.
Scintillating Fiber and Ribbon Production Update Alan Bross MICE CM 16 October 8, 2006.
Status of the preparation for KEK test beam M. Yoshida (Osaka Univ.) MICE VC 2005/9/14.
Fiber, Ribbon Production and Cryo Update Alan Bross Tracker Phone October 26, 2006.
MICE Tracker Update Alan Bross NFMCC Friday Meeting November 10, 2006.
1 Alan Bross MUTAC April 9, 2008 Lithium Hydride Absorber Program A. Bross for C. M. Lei.
R. Rucinski, Fermilab Feb. 9, 2005 Project Status 2 cassette VLPC Cryostat Russ Rucinski - Fermilab This presentation will probably involve audience discussion,
Tracker Summary Makoto Yoshida Osaka Univ. MICE Frascati June 28 th, 2005.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Cryo Update Alan Bross MICE Tracker Phone Meeting September 8, 2006.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Cryo and AFE IIt Update Fiber Tracker Meeting April 6, 2006 Imperial College A. Bross.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
MICE Phase 1 Koji Yoshimura KEK June
Takashi Matsushita Imperial College T. Matsushita 1 Quality Control of Station Assembly.
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference September 5, 2007.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
Lithium Hydride Absorber Program Update Alan Bross MICE CM Sofia – October 5 th, 2010.
Lithium Hydride Absorber Program Update Alan Bross.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
X LCLS SCU NbTi Prototype Schedule Version: February 12, 2015 Update 23JUN2015 X X System complete and ready for test X System complete & tested w/Hall.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
CLOSING REMARKS. Following the Review Charge Cryo-Design  Review and comment on the overall cooling circuit and overall cryo-design. u Temperature Margin.
Status of the cryogenic payload system for baseline KAGRA Rahul Kumar 1, K. Craig 2, K. Yamamoto 2, H. Tanaka 2, T. Miyamoto 2,T. Kajita 2, T. Suzuki 1,
US Construction Project: SSs, PRY, Cavities and test program 1.
S A Griffiths CM42 June 2015 Electrical & Control.
Toward a Reasoned Design.
Completion of the MICE-US construction project
Service channels between Tracker and PP1
MICE VLPC Cryo Update Alan Bross MICE CM18 June 13, 2007.
Status of Prototype Preparation and SiPM Characterization
Scintillating Fiber/Clear Fiber QA and Ribbon Production
MICE Coupling Coil Update
Presentation transcript:

Scintillating Fiber, Ribbon Production, Cryo Update Alan Bross MICE Tracker Meeting IC November 8, 2006

Status  Ribbon Mirroring continues. 54 runs have been mirrored u Mean R = 76% RMS=4%

Mirroring Status  From Eileen u All fiber prep work is complete s Cutting s Inspection s Polishing u Approximately 55k fibers sputtered (mirrored) (about 2/3) u The expected rate from now is about 6000/week s Finish 3 rd week of November u A second sputtering system has been put together, but we are waiting for new sputtering gun (est. delivery 10/31) s Could speed things up a bit  Note: u The lock-in amplifier used for the reflective measurements died last week and a new setup was assembled. The RMS on the measurements is not as good as before and for some reason, the R measurement seems to be about 1% lower systematically (??)

Waveguide Fiber QC  Measurements continue on the waveguide fiber u So far so good u Will try to get measurements done before WG production starts = 8.8 m LOT 1

= 8.5 m LOT 2

= 8.8 m LOT 3

New Ribbons  Roger Hare was at Fermilab for about two weeks and helped a great deal u Prep’d fibers u Measured molds and confirmed number of grooves and pitch u Ribbon Layup  Production Ribbons u 10 are ready for shipment u Schedule s Have added some additional tech help s Still need one more person for fiber prep in order to keep up with ribbon layup s Goal is to finish by end of year

Cryogenic system status Prototype – conclusion Production cryostats Russ Rucinski

Prototype - Conclusion  Design iterations are concluded.  Improvements will be incorporated into the production cryostats. u Stronger clamping bars with ball bearing point contact. u Indium tape at thermal interface to envelope. u Invar washers and torque specifications for thermal connections of thermal links. u Reflective tape on all surfaces to reduce radiation heat load.

Prototype – Conclusion II  Total heat load on the cryocooler is about 60 Watts & 4 Watts at the upper and lower stages.  Cassette temps with no heaters are 7.0 K and 7.5 K for cassette #105 and #112.  Cassette heat load estimated 0.74 watts & 1.2 watts for cassette #105 and #112.  Expect to run about 0.3 K warmer at 50 Hz in UK.  The operating margin at 50 Hz will be about 1 Kelvin in temperature, or 2 Watts in heat load at the lower stage.

Production Cryostats I  All eight invar envelopes have been received from Ability Engineering. Initial warp problems on three envelopes were corrected. Five envelopes shown, three are in a different box. All parts from Ability have been received.

Production Cryostats II  The lid heater has been epoxied into the first lid.  The gas plumbing is in place.  The first lid heater controls box is almost built. The controls box also contains the low pressure alarm and condensate alarm. We can test the function of the box in a magnetic field in the future.

Production Cryostats III  We will continue to construct the first production cryostat. It should be done before the end of the year.  New parts for the additional two /DAQ controls racks have been ordered.  Everything looks optimistic and on schedule.!