Sites for the NuMI Off-Axis Far Detector Marvin L. Marshak University of Minnesota 12 January 2004.

Slides:



Advertisements
Similar presentations
Aspen Falls Park Development Land Acquisition for Parks One Minute to Start.
Advertisements

Lenape Lenape Energy sources: Geothermal- 4,000 MW Hydroelectric- 10,000 MW Nuclear- 6,000 MW Wind- 3,000 MW Tidal – 2,000 - MW (Import from Paradise)
Minnesota’s Lake Superior Coastal Program Applying Coastal Zone Management Act Funding to Local GIS Needs.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
A LOOK BACK AT WETLAND REPLACEMENT, IN WASHINGTON COUNTY, MINNESOTA Jyneen Thatcher 6 th Annual Minnesota Wetlands Conference January 30, 2013.
Environmental Aesthetics. Natural Environment Add a New Component to the Environment A Building! Can we make this addition a POSITIVE one ?
Indiana 6217 Coastal Nonpoint Source Pollution Control Program – What it is, and What it Means!
The Provo River Watershed What’s Downstream?
Mobile GIS at the DNR GIS Day – UMD November 17, 2011.
F Axis Off Axis Physics Potential Cambridge Off-Axis Meeting 12 January 2004 Gary Feldman.
An accelerator beam of muon neutrinos is manufactured at the Fermi Laboratory in Illinois, USA. The neutrino beam spectrum is sampled by two detectors:
F Axis Off Axis Introduction Off-Axis Cambridge Meeting 12 January 2004 Gary Feldman.
S. UC Irvine August U.S. LArTPC Detector Activities Scott Menary The International Scoping Study Meeting of Neutrino Factory and Super-beam.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
Africa Geospatial Forum Geospatial Empowering Utilities.
1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.
St. Johns River Water Management District Surplus Property Proposal Jones Avenue Parcel March 12, 2013 Community, Environmental, Development Services Department.
AGENDA Prayer Prayer Introduction – TLB Chairman Introduction – TLB Chairman Proposed Approach in Ngamiland – BDC Proposed Approach in Ngamiland – BDC.
Community owned forests conference Missoula, June 2005.
The NOvA Experiment At Fermilab Mark Messier Indiana University 34th International Conference on High Energy Physics (ICHEP’08) Philadelphia, PA July 30,
Progress with the Off-axis Experiment LoI and PAC Response Ongoing detectors R&D Simulation efforts Sites UCL meeting Next steps.
Minnesota Geospatial Information Office A Program Area of MN.IT Services Mike Dolbow (edited by Jim Krumrie) Minnesota Geospatial Information Office (MnGeo)
CURRENT ISSUES Study Presentation Created for you by Mrs.Kraushaar 2008.
Select High Quality Natural Communities MLCCS Slope & Aspect Restoration Prioritization and Prediction Model (RePP) SUMMARY: In 2008, Ecological Strategies.
Monitoring of FHEP Teacher Research Internship Fermilab – Summer 2011.
Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 The NO A Experiment Gary Feldman Harvard University Survey.
Izok Corridor Project: Kitikmeot Community Visit
Site development issues, focusing on site acquisition Douglas Bock See also: Stephen’s “Visual Tour of the OVRO site” FASR Planning Meeting, AUI, August.
Greater MN Regional Parks and Trails Coalition Strategic Planning Process Greater MN Regional Parks & Trails Coalition & Schoenbauer Consulting, LLC 1.
Cost and Engineering Working Group Introduction Jim Strait Fermilab LBNE Project Manager Deputy Chair, Cost and Engineering Working Group LBNE Reconfiguration.
Proposed Amendment to Project Certificate (Condition 32) Meadowbank Private Access Road INAC's Comments to NIRB Baker Lake, Nunavut [ April 28-30, 2009.
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
Michigan Natural Resources Trust Fund Recreation Grants Program
Camp Ripley Army Compatible Use Buffer …a learning experience (April 2008) Marty Skoglund Camp Ripley Environmental Supervisor.
Gary Feldman MINOS in Cambridge 24 March NO A Update MINOS Collaboration Meeting Cambridge, England 24 March 2009 Gary Feldman.
Whistler Nordic Center: A systems perspective of the Callaghan Valley EIA Process Dan Kellar Wilfrid Laurier University October 20 th 2007.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
Board of County Commissioners FPL Natural Gas Transmission Pipeline Siting Act Application January 12, 2010.
NOvA Project Status February 6, 2007 John Cooper Ron Ray Nancy Grossman.
Low Background Studies at the Soudan Underground Laboratory-9/20/ Low Background Studies at the Soudan Underground Laboratory The Soudan Underground.
LBNE Environmental Assessment NEPA Informational Meeting May 23, 2013 Rod Walton, LBNE NEPA Manager.
BY RHIANNON AND RACHAEL. An eruption of hot volcanic ash rose 80,000 feet (24,400m) into the sky. At the same time, ice, snow and several glaciers which.
Agenda  Opening Remarks - NIRB  NIRB Presentation: NLCA Reconsideration of the Meadowbank Gold Mine Project Certificate  General questions on.
Eagle Creek USA Expansion The Request: 85 acres of land 254 homes Proposed 50’ Rural FLU strip Existing 50’ Rural FLU strip The Commitments: All access.
December 2002 Section 6c Canadian Impacts of Climate Change (3)
EXT 10 Mr. Jean January 11 th, The plan: Video clips of the day Gold Rush vs. Nature.
Conventional Facilities for the Far Detector Options Assumptions and Cost Estimates T. Lundin April 25, 2012 LBNE Reconfiguration Workshop - 25, 26 - April-2012.
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
Delivering Service Standards Environment Service.
The NOnA Experiment Survey of the NOvA Far Detector Gary Feldman
What does a Civil Engineer do?
Rocky Mountain National Park By Grace Werthman November 21, 2015.
Event Display The DAQ system architecture The NOA Data Acquisition system with the full 14 kt far detector P.F. Ding, D. Kalra, A. Norman and J. Tripathi.
CONSERVATION AND RESOURSE PROTECTION GRANT PROGRAM NEVADA DIVISION OF STATE LANDS Question 1.
Chagrin River Watershed Partners, Inc. January 19, 2008
Jemtegaard Trail Project was originally funded by a Safe Routes to School (SRTS) which is a federal grant administered by WSDOT Total funding for design,
Oil Pipeline Optimal Route
The City of Tampere Cultural Trails
St. Croix County Land Acquisition Eckert Family, LLLP
Land Preservation and Public Access Projects
Metropolitan Council Environmental Services Minnesota Forum on Trenchless Technology Bloomington, MN April 20, 2011.
UCLA High Energy & Astro-Particle (HEAP) Seminar
Reclaimed Water Funding
ENVIRONMENTAL ASPECT Element of an organization’s activities or products or services that can interact with the environment A significant environmental.
Map Types Study Guide Physical Map
Department of Environmental Quality
Annex VI, Criterion 3: Immediate damage to the environment
Fermilab – SURF, NOvA, & SnoLab
Environmental Protection Division
Presentation transcript:

Sites for the NuMI Off-Axis Far Detector Marvin L. Marshak University of Minnesota 12 January 2004

Kjostad Lake Mine Centre Ash River

Focus on 3 Sites Ash River Trail is furthest road from Fermilab that is still in the United States Ash River Trail sites are ~811 km from Fermilab and range from 11 to 15 km off-axis Mine Centre is ~845 km from Fermilab Kjostad Lake is ~775 km from Fermilab

15 km14 km13 km12 km A B C D E F

Next Steps Formal request to DNR for land acquisition and road easement Formal request to Boise Cascade for road easement Begin environmental review process with goal of achieving “Finding of No Significant Impact (FONSI)”