Minutes from Sector 1 Relocation Meeting, May 22 nd 9:15 LCR D. Gassner K Mernick suggest moving the BBQ kicker and triple purpose pick-up assemblies to.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Electron Cooling in the Accumulator McGinnis Electron Cooling in the Accumulator Dave McGinnis.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
2 February 2005Ken Moffeit Spin Rotation scheme for two IRs Ken Moffeit SLAC.
RHIC shut-down work 2011 Wolfram Fischer 18 October 2011 RHIC Planning Meeting.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
APEX Report: March 31 – April 1, 2009 Fulvia Pilat Time Meeting, April 7, 2009.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
Sector 1 Instrument Relocation for LEReC Systems in the LEReC Region (39m - 64m) to be Relocated 7 separate assembliesNew LocationChampionsApproved ARTUS.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
APEX Cameron BBQ 3Nov06 BBQ and Other Developments Peter Cameron.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Magnet Motion Produces Luminosity Loss. NLC Feedback Operation Kicker Gain Bunch Charge Measure deflected bunches with BPM and kick other beam to eliminate.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
October 4-5, Overview of ARRA funded AIPs at C-AD Wolfram Fischer October 4, 2010.
APEX Report March 3, 2010 Fulvia Pilat Time Meeting, March 9, 2010.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.Funding is available to purchase magnets. 2.Comment during presentation of attached slides: 180.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Vladimir Litvinenko, APEX Workshop 11/02/20006 IBS suppression lattice Mei Bai, Joanne Beebe-Wang, Peter Cameron, Roger Connolly, Angelika Drees, Alexei.
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
APEX RUN-12 APEX Schedule Feb 22, 2012 Injection 8am 11pm IP transfer matrix Tepikian, Ptitsyn If needed: Beam Scrubbing Blaskiewicz, Montag, Huang Injection.
RHIC 250 GeV Polarized Proton Run 2009 Mei Bai RUN website: 12/16/2008RHIC Spin Collaboration Meeting.
RHIC Status and E-lens 101 Spin Collaboration Meeting V. Schoefer 2/6/2015.
Beam Line Layout – Cooling Section (to be installed by 1 Dec ember 2015) J. Kewisch wants to move the 20 dipole, yellow (to the right) toward the triplet.
APEX RUN-11 APEX Schedule May 11, 2011 Injection 12am8am BBA Minty, Jordan, Liu, Rob, Rob, Kevin, … Spin Flipper Bai, Pablo, Oddo, Craig, Kevin IPM calibration.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
LEReC Electron beam requirement for cooling Kinetic energy, MeV 1.6
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Low Energy RHIC e - Cooling Meeting Minutes – 12/17/ For the matching energy of electron and ion beams methods for electron energy measurement were.
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
Minutes meeting Mapes, Miller, Kayran, Fedotov, Gassner, Hamdi, Bruno, Mahler, Weiss, Hammons, Arno, Nayak, Fite, Bellavia The layout shown in.
LEReC System 1. LEReC Injection section 2016 CeC Beam Dump 45°dipole (CeC) Profile Monitor (ERL HE) No SRF Cavity DC e - Gun ERL Solenoid ERL Halo Monitors.
Jaak Lippmaa HIP, Helsinki University
Test of Optical Stochastic Cooling in CESR
AD consolidation activities in LS2
The Interaction Region
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Alignment Diagnostic System Status
Electron Collider Ring Magnets Preliminary Summary
Status of the BI Work Package in the LIU-PSB frame
Presentation transcript:

Minutes from Sector 1 Relocation Meeting, May 22 nd 9:15 LCR D. Gassner K Mernick suggest moving the BBQ kicker and triple purpose pick-up assemblies to sector 2, yellow (it appears that there is room). This allows shorter cable lengths, moving towards YO1 Q4 would have meant (undesirable) longer cables than the existing. K Mernick recommends that we don’t need the moveable X-Y capability on the triple purpose pick-up, this can simplify the relocation effort and beam line assembly. K Mernick requests that the Quad PU (0.25m) from YO1 (40m) be relocated (instead of removed), a suggestion is closer to Q4 in YO1, get confirmation from Kevin on new location. Can remove the stochastic cooling ceramic pick-ups [6-9 GHz] in sector 2 yellow (62-66m from IP2) since these are no longer used, this makes more room for the first note mentioned above. The preference is for the IPMs to be installed as close to Q3 as possible in sector 12. Since they need to be offset because the beam pipes are close together, the horizontal should be closer to Q3. Jesse will layout new IPM locations (plan view) with longitudinal offset and separate stands for review. George suggests prioritizing the order of the installations and a bake-out schedule, see next comment. Need to get Mike Mapes & Dan Weiss involved as soon as possible for vacuum, mechanical and bake- out planning. Rob M is following up with Angelika regarding beta function considerations of the new proposed locations of the ARTUS kickers adjacent to the existing ones in sector 2. Confirmation that GOF magnets will stay in sector 1 (near Q3), need to check with Gary W’s latest LEReC layout. Joe T says we can have designer Vito committed for this priority and need dedicated mechanical engineers. System Champions need to approve the relocation plan for their respective systems. Warm Space Committee needs to approve the relocation plan. Note: the following slides from the meeting have not been updated to include the above comments made during the meeting.

Courtesy A. Fedotov About 25m of RHIC transport (from 39-64m from IP2) needs to be cleared out soon after Run15 ends so the LEReC beam lines can be installed. 39m 64m Sector 1 Instrument Relocation for LEReC

Systems in the LEReC Region (39m - 64m) to be Relocated 7 separate beam line mechanical assembliesNew LocationChampions ARTUS Kickers - Blue V, Yellow HSector 2Drees IPMs (Ionization Profile Monitors)- Blue H, Yellow VSector 12Tepikian Moveable BPM & LF Schottky, X-Y stage BI1 41mSector 1 (closer to Q4)Brown/Blaskiewicz BBQ Kicker stripline (1m) YO1Sector 1 (closer to Q4)Marusic Triple Purpose Pick-Up on Moveable X-Y Stage YO1 ~42mSector 1 (closer to Q4)Minty/Marusic/Blaskiewicz Cable Tray Waterfall Systems to be Removed (no longer needed) Electron Detectors (8)Zhang/Blaskiewicz Quad Pick-up (0.25m) YO1 40.1mMinty Luminescence Monitor Cross at B m Minty Stochastic Cooling Ceramic Pick-Ups[6-9 GHz] at BI1 67.8mMernick/Brennan/Blaskiewicz May 22, 2015

ARTUS Kickers Multi-use Striplines: Tune Meter Kickers Longitudinal Damper Injection Damper Gap Cleaning - 1 Horizontal kicker and 1 Vertical kicker Assembly - Each Assembly consists of two sets of 2 meter long strip lines - 7/8” and 3/8” Heliax cables - Move to Sector 2, adjacent to existing ARTUS kickers Champion: Drees

Ionization Profile Monitors Horizontal IPM Vertical IPM Each IPM has ~30 cables A common stand for both IPMs in sector 12 was considered until Jesse found a conflict. Present plan is for separate stands with the IPMs offset enough for clearance. Electronics will be moved from 1002 to 1012 Michiko evaluated options for the IPMs: Relocation of BH and YV IPMs: to sector 2 ok for LEReC and 100 GeV p+p. to sector 12 required to resolve profiles for 250 GeV p+p. After consultation with Wolfram (03/16/15), IPMs will be relocated to sector 12. Champion: Tepikian

Moveable BPM & LF Schottky ¼” heliax and motion control cables Move from BI1 41m (from IP2) to 65m (closer to Q4) Champions: Brown/Blaskiewicz

Triple Pick-up Assembly Move from YO1 42m to 66m (closer to Q4) ¼” heliax and motion control cables BBQ stripline pick-up (1m) Quad pick-up (0.25m) Head-Tail pick-up (1m) Champions: Minty/Marusic/Blaskiewicz

BBQ Kicker (1m strip line) Base-Band Tune Stripline Kicker 3/8” heliax cables Move from YO1 40m to 64m (closer to Q4) Champion: Marusic

Cable Tray Waterfall (near Q3) Cables will be rerouted in new tray - Power supply - Vacuum - Instrumentation - Cryo Q3 Dave Phillips working on placing two trays: one against the triplet on the inside of the ring and one against the DX inside of the ring.

Allotment Drawings – Sector 1 Before Relocation – Sector 1 After Relocation – Sector 2 Before Relocation – Sector 2 After Relocation – Sector 12 Before Relocation – Sector 12 After Relocation courtesy Vito De Monte

Sector 1 Before Relocation Moveable Pick-ups & BBQ Kicker, all moved towards Q4 Remove Stochastic Cooling Ceramic pick-ups Area Clear Moveable BPM & LF Schottky Moved towards Q4 LEReC Region Remove Electron Detector Q3

Sector 1 After Moveable BPM & LF Schottky Moved towards Q4 Moveable Pick-ups & BBQ Kicker Moved towards Q4

Sector 2 Before Relocation ARTUS Kickers - Proposed new locations adjacent to existing ARTUS Kickers in Sector 2 Remove Electron Detector For ARTUS H Kicker Remove Unused Luminescence monitor cross for ARTUS V Kicker Existing ARTUS V Kicker Existing ARTUS H Kicker

Sector 2 After ARTUS Kickers moved from Sector 1

Sector 12 Before Relocation IPM Proposed locations Area Clear Area Clear Horiz IPM Vert IPM Q3

Sector 12 After IPMs moved from Sector 1

Sector 1 Instrument Relocation for LEReC Systems in the LEReC Region (40m - 63m) to be Relocated 7 separate mechanical assembliesNew LocationChampion ARTUS Kickers - Blue V, Yellow HSector 2Drees IPMs (Ionization Profile Monitors)- Blue H, Yellow VSector 12Tepikian Moveable BPM & LF Schottky, X-Y stage BI1 41mSector 1 (closer to Q4)Brown/Blaskiewicz BBQ PLL Kicker stripline (1m) YO1Sector 1 (closer to Q4)Marusic Triple Purpose Pick-Up on Moveable X-Y Stage YO1 ~42mSector 1 (closer to Q4)Minty/Marusic/Blaskiewicz Cable Tray Waterfall Systems to be Removed Electron Detectors (8)Zhang/Blaskiewicz Quad Pick-up (0.25m) YO1 40.1mMinty Luminescence Monitor Cross at B m Minty Stochastic Cooling Ceramic Pick-Ups[6-9 GHz] at BI1 67.8mMernick/Brennan/Blaskiewicz Beam Loss Monitor Detector Reconfiguration, Sector 1 1 BLM per IPM will move with the IPMs to sector 12Drees Summary Champions need to confirm the relocation plan so the mechanical design work can proceed. More details can be found here:

Sector 1 Before Relocation

Sector 1 After Relocation

Sector 2 Before Relocation

Sector 2 After Relocation