Scanning status in Salerno Chiara Sirignano Chorus Collaboration Meeting Ishigaki, 7-8 April 2003.

Slides:



Advertisements
Similar presentations
New results from the CHORUS Neutrino Oscillation Experiment Pasquale Migliozzi CERN XXIX International Conference on High Energy Physics UBC, Vancouver,
Advertisements

H eavy F lavor T racker : a silicon inner tracking upgrade for STAR Jonathan Bouchet (Kent State University) for the STAR collaboration Poster 907, April.
Emulsion scanning: present status and plans for the coming run Giovanni De Lellis.
Vertex location status of Japan Nagoya vertex hunting team Y.Nonoyama, K.Hamada, S.Takahashi, H.Kubota, R.Komatani 2009 Jan 22 OPERA Japan Meeting.
Jaap Panman 2003 Papers in pipeline Papers, in near future Lambda_c (#2), QE cross-section (and BR into Sigma) - DRAFT exists Rare decays of D (Nicola's.
Status of Multiplicity Studies at Primary Vertex Umut Kose.
CHORUS Collaboration Meeting, Ishigaki, Japan/ April 2003 MC productions and data/MC JETTA and specific generators Eficass and CHANT Data/MC comparison.
24 May 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz.
Status and activities in Salerno Cristiano Bozza Salerno Emulsion Group Nagoya Dec 2006.
Chant tracks for Analysis O.Sato.
1 Tracking Tests of DHC Tower Update - 10/01/2003 Kurt Francis - Northern Illinois University.
 Financial summary; UK Common Fund K. Long, Friday, 24 th April 2009.
Summary of the event location in Europe Giovanni De Lellis.
Emulsion scanning in Napoli Status of net-scan data taking Overview and perspectives Giovanni De Lellis.
Vertex localization in Lyon Emulsion Workshop 7th-9th Dec. 2006, Nagoya Luisa Arrabito – IPN Lyon.
Virtual Cell Support Software: User Interface Worldwide Web Instructional Committee, North Dakota State University, Fargo, ND.
Evaluation of SySal efficiencies for 1  sample Chorus Collaboration Meeting Ishigaki,7-8 April 2003 Emiliano Barbuto, Chiara Sirignano, Salvatore Sorrentino.
1 Initial Tracking Tests of DHC Tower Update - 09/24/2003 Kurt Francis, Donna Kubik - Northern Illinois University.
Received bricks: 94 ( ) (5 black CS) Extracted by mistake 1 ( 1 + 0) 93 ( ) Located in ECC: 72 ( ) (2 black CS) Located in dead material.
Phase Difference = Phase Difference = 0.05.
Rome scanning report After training ( Brick # , ev. # from Salerno: relocated ), 4 bricks assigned - 3 in this report [1 more assigned.
Umut Kose Neutrino interaction location in the OPERA Experiment New Development of Flavor Physics, , Tennomaru, Gamagori Nagoya University.
PEANUT exposure summary and brick distribution and Situation of PEANUT analysis Fermilab.
Charm search in Napoli Purpose: evaluate the charm production cross-section Means: “golden” selection Starting data sample: Naples modules MC simulation.
Coronal waves: hot structure and footprint of CME.
Scanning status in Europe Giovanni De Lellis University of Naples.
4th Phase : 4th Phase : CONTROL Why is control necessary? Because:  People make mistakes  External factors can have impact on the project  Requirements,
7 things to boost productivity of your small business team.
1 RUN 2008 OPERA events: Status Report M. Ieva on behalf of Bari Emulsion Lab OPERA Collaboration Meeting, April 1st - 5th, 2009.
British Literature May 26, 2009 Ms. Cares. AGENDA: 1.Literary criticism review: provide a brief summary of the three main types of literary criticism.
STAR Ready to move on to 7.7 GeV Bill Christie For The STAR Collaboration April 13, Please N.B. All data plots shown in this presentation are online.
The Fit Stop Human Performance Lab, Since 1998 Welcome Plans for a Half Marathon.
Development of the European Scanning System Progress Report Development of the European Scanning System Cristiano Bozza – European Emulsion Group - LNF,
1 L.Didenko Joint ALICE/STAR meeting HPSS and Production Management 9 April, 2000.
Project Plan Tracking – Fundamentals Lesson 8. Skills Matrix SkillsMatrix Skill Establish a project baseline Track a project as scheduled.
European Scanning System: status report. DRY Fill factor 92.4 ± 1.6 % DB-driven Scan-back and Total Scan in Bari OIL Fill factor 93.1 ± 1.2 % Brick #8,
Creating a Task List. Task Tasks are the most basic building blocks of any project Task represent the work to be done to accomplish the goals of the project.
Event Location Rehearsal in PEANUT Bricks OPERA collaboration meeting Gran Sasso, May 2006 Kodama, Sato, Fukuda, Komatsu, Narita, Nonoyama NAGOYA.
3:00. 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52.
Case Study ITER-like Wall Project WBS
Background Research Group and Advisor Group’s overall research goals Technology to: –Build On –Integrate –Advance.
Staff development for technology- enhanced learning and assessment an institutional overview Carol Russell.
Using MS-Project INFS MS-Project: 3 Major Parts 1. Project Planning 2. Project Execution & Tracking 3. Project Reporting.
A Kinematic and Dynamic Analysis of Shoveling Snow José A. DeFaria First Progress Report February 29, 2016.
Area Covered. Work Done Quantity Financial Progress of work.
Introduction to the Microscope
Top Fire Protection Services Ottawa available on Dubinskyconstruction
Tips Need to Consider When Organizing a College Event
قراءة القوائم المالية وفـاء شـريف علي. محلل مالي
Basic Factoring Review
Simplify Numerator Or Denominator Adding Fractions What is the Whole
ماجستير إدارة المعارض من بريطانيا
Tracking Circuit Boards
Collaborative Research Network
High Demand Scan--Summary
Bridge through Ten Addition
Soap film illuminated by bright white light
Konnichiwa!.
4.4 – relations, domain, & range
Genocide Case Studies.
NHS Meeting 1/8/18 MLK Day of Service WILL BE a NHS service event. If you would like to participate you must sign up following the link below:
Types of Smart Art.
Project Management 101.
If you could rewrite it If you could rewrite anything you have ever done and change an event what event would that be? Would changing that one event really.
2018 Work plan - Overview Phase 2: assisting other countries replicating best practices identified in the first phase. Draft an extended note on practical.
Determinants Get out your notes and be ready to complete a warm-up on your new purple sheet.
This is my sheet And this is my sheet.

Building pattern  Complete the following tables and write the rule 
Tracking resistance to TRKA inhibition in ctDNA of a patient with colorectal cancer. Tracking resistance to TRKA inhibition in ctDNA of a patient with.
Presentation transcript:

Scanning status in Salerno Chiara Sirignano Chorus Collaboration Meeting Ishigaki, 7-8 April 2003

Scan-back phase summary 233 Top 233 Bottom Completed = 1701 events Completed = 1133 events 263 Bottom 263 Top Completed = 2440 events 1039 events found by Choral scanning Chant scanning in progress: Thin sheets completed.(600 new events ?) 7k events in total

Total Scan 233 Top 233 Bottom Completed = 1701 events + stopping tracks Now in progress (Sheet #18) = 1133 events + stopping tracks 263 Bottom 263 Top Choral evts completed 914 Chant evts to be done Choral evts completed (600 ?) Chant evts to be done