Commissioning TileCal with Cosmic Ray Muons J. Pilcher University of Chicago.

Slides:



Advertisements
Similar presentations
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Advertisements

Measuring Cosmic Ray Flux with a trigger and CAMAC readout - Page 1 Connect the Fluke 415 HV supply output to the input of the voltage distribution box.
Introduction This project used cosmic rays to test a prototype Minimum Bias Trigger Scintillator (MBTS) that will be used in the ATLAS experiment at CERN.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
An Online Calorimeter Trigger for Removing Outsiders from Particle Beam CalibrationTests Denis O. Damazio José Manoel de Seixas Signal Processing Lab –
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
In order to acquire the full physics potential of the LHC, the ATLAS electromagnetic calorimeter must be able to efficiently identify photons and electrons.
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
The Design of Barrel Electromagnetic Calorimeter (BEMC) October Lu Jun-guang.
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
SoLID EC Update Zhiwen Zhao 2012/05/22. Beam test update Coverage for PVDIS Road map.
The ATLAS Tile Calorimeter: Commissioning and Preparation for Collisions Presented by Oleg Solovyanov On behalf of the Tile Calorimeter Collaboration of.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 A ROOT Tool for 3D Event Visualization in ATLAS Calorimeters Luciano Andrade José de Seixas Federal University of Rio de Janeiro/COPPE.
Energy Distribution of Cosmic Ray Muons Paul Hinrichs With David Lee Advised by Phil Dudero.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
Early Commissioning of ATLAS First North American ATLAS Physics Workshop Tucson J. Pilcher University of Chicago.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
Cosmic Rays for ATLAS Commissioning Commissioning Meeting ATLAS Physics Workshop Athens May 2003 Halo+Cosmics group: M.Boonekamp, F.Gianotti, R.McPherson,
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
Adders in drawer Test of TileCal Level 1 Interface drawer patch panel trigger cable ca 70 m receiver pre-processor TileCal patch panel RP patch panel TileCal.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Results from particle beam tests of the ATLAS liquid argon endcap calorimeters Beam test setup Signal reconstruction Response to electrons  Electromagnetic.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖.
ATLAS Tile Hadronic Calorimeter:
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
1 Plans for first beams - - triggers from the BRM group (BSC, BPTX) Gábor Veres for the BRM group CMS Trigger Technical Coordination Meeting 8 October,
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
US TileCal Meeting at UTA Possible Electronics Evolution J. Pilcher University of Chicago.
The ATLAS Tiles Hadronic Calorimeter
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
Nov. 2005Calorimeter Commissioning R. Teuscher 1 Calorimeter Commissioning in : Testbeam 2: Installation, Cosmic Ray Commissioning.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
MobiDAQ progress Paulo Vitor da Silva, Gerolf Schlager.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
R&D status of the very front end ASIC Tilecal week (7 October 2011) François Vazeille Jacques Lecoq, Nicolas Pillet, Laurent Royer and Irakli Minashvili.
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Matteo Volpi, Luca Fiorini Timing study with Muons at 90º from first beam PRELIMINARY STUDY (Barcelona) 1 Tile Timing Group meeting 17 September 2008.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
US TileCal Meeting at UT Arlington
LKr status R. Fantechi.
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
Project definition and organization milestones & work-plan
An Automated calibration method from shower data
2018/6/15 The Fast Tracker Real Time Processor and Its Impact on the Muon Isolation, Tau & b-Jet Online Selections at ATLAS Francesco Crescioli1 1University.
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
A First Look J. Pilcher 12-Mar-2004
Pierluigi Paolucci - I.N.F.N. Naples
RPC Detector Control System
ATLAS Tile Calorimeter Interface The 8th Workshop on Electronics for LHC Experiments, Colmar, 9-13 September 2002 K. Anderson, A. Gupta, J. Pilcher, H.Sanders,
Trigger issues for the CALICE beam test
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
RPC Detector Control System
Presentation transcript:

Commissioning TileCal with Cosmic Ray Muons J. Pilcher University of Chicago

6/24/03J. Pilcher2 TileCal Assembly Schedule Surface preassembly of barrel  Complete preassembly December ’03  Start disassembly late February ’04  ~2 months possible for commissioning studies  Cs studies over full height of barrel  Cosmic ray muons through full readout system Underground assembly of barrel  Begin 11 May ’04  Module assembly complete 10 Sept. ’04  Services complete 26 Nov. ’04  Tests and commissioning 29 Nov. ’ Dec. ’04  Short time (4 weeks)  Unpopular time for working  We must be efficient and well prepared

6/24/03J. Pilcher3 Commissioning Preassembly Goals  System tests with more modules  Largest system run to date is 6 superdrawers –In test beam  Full barrel contains 128 superdrawers  Intermediate step is essential  System tests with hardware not yet used  LV power supply sets in fingers  Bulk LV power source 80m away  LVL1 trigger hardware interfacing to TileCal –Patch panels to remap tower and muon signals –Receiver boards  Hardware RODs

6/24/03J. Pilcher4 Commissioning in Pit Check that all systems are alive in Dec. ’04  Cs and CIS runs  Thorough check-out with “physics” signals will take longer Attractive to run system on cosmics periodically from Dec. ’04 - Dec. ’06  Monitor stability  Get all bugs ironed out  Provide trigger to other parts of ATLAS  Likely very little access to pit during this time  Most work in USA15

6/24/03J. Pilcher5 Estimate Trigger Rates Consider rate in back-to-back trigger towers ( equipped modules)

6/24/03J. Pilcher6 Estimate Trigger Rates These triggers are the most useful  Muon fully traverses single towers  Could also select these muons with bottom section of cal. and scintillator in “beam” region Rate is lower than trigger using larger towers (eg. 0.4 x 0.4)  Return to this case later Do simple calculation with Excel

6/24/03J. Pilcher7 Cosmic Ray Flux Use numbers from Particle Data Group  Tabulate in Excel

6/24/03J. Pilcher8 Cosmic Ray Flux Integrate over muon energy above a threshold  Must impose range cut-off, depending on  (or  )  Set up table for linear interpolation  Gives muons / sec / m**2 / steradian

6/24/03J. Pilcher9 Cosmic Ray Flux Range information  Use PDG, Sec. 26, Ref. 1 for range-energy & dE/dx  Article by D.E. Groom et al., Nucl. Data Tables 78, for muons in iron  Set up table for linear interpolation  Use module geometry from CDD drawings  Solid steel at inner and outer radii (including girder, etc.)  Steel and scintillator mixture between

6/24/03J. Pilcher10 Rate Calculation Consider back-to-back cells  Area from plane mid-way through A-cell on bottom  Solid angle from corresponding plane on top  Scale rate by cos 2  (zenith angle)  Integrate over wedges in 

6/24/03J. Pilcher11 Rate Variation with  and  Plot fraction of total rate versus  and   Easy to scale rate to smaller configurations

6/24/03J. Pilcher12 Rate Estimate in UX15 Pit PX16 (10 m Inner Dia.) PX14 (14 m Inner Dia.)

6/24/03J. Pilcher13 Rate Estimate in UX15 Pit Overburden corresponds to 55 m of rock with density 2.4 gm/cm**3 Range cut-off now 34 GeV instead of 4 GeV  Based on CERN Yellow Report  SPS study of range-energy and dE/dx of high energy muons Expected rate reduction is factor of ~22  Zenith angle dependence of overburden not included  Would give ~10% reduction  Vertical access shafts not included  Would increase rates for certain  and  Expected rate ~90/hr  Rob McPherson has been asked for a more detailed GEANT-based estimate

6/24/03J. Pilcher14 Rate with Alternative Trigger Consider trigger on towers of (0.4 x 0.4)  Same area as before but solid angle increased by 16  Rate increased by ~16  32K events/hr on surface (was 1.9K/hr)  1.5K events/hr in pit (was 0.09K/hr)  Energy spread over several towers  Trigger less clean  Events less useful for calorimeter diagnostics  Much less trigger hardware needed  Could filter events at LVL2

6/24/03J. Pilcher15 Comments on Rates There is a very useful trigger rate both on the surface and in the pit Actual rate on surface next winter will depend on how much electronics is available

6/24/03J. Pilcher16 Hardware Needed Electronics drawers (64) - probably OK LV power in fingers Bulk LV power (200V for USA15) Cabling and fibers TTC hardware LVL1 trigger interface hardware  Patch panels to separate tower and muon signals  Receiver boards (64 towers each)  Trigger logic for cosmic ray running LVL2 hardware  ROD modules  ROD crate and controller  Output hardware from ROD crate (Ethernet?)

6/24/03J. Pilcher17 LV System 200V Power Monitoring Control LV supplies to Patch Panel Set of 8 DC to DC converters With monitoring and control in each finger

6/24/03J. Pilcher18 LV System Need full scale prototype for 2 fingers with 200V bulk supply, cables, splitter boxes  This summer? Need preproduction units  Use in preassembly commissioning next winter  64 of 256 fingers?  32 of 256?  looks reasonable  Feasibility????

6/24/03J. Pilcher19 LVL1 Interface Hardware Cable from barrel drawer delivers 9 tower signals and 7 muon signals  Splitter box needed to collect tower and muon signals on separate cables  Group tower signals as needed for LVL1 receiver boards  Whose responsibility??? Drawing shows required organization for drawers

6/24/03J. Pilcher20 LVL1 Interface Hardware Receiver boards produced a single-ended, conditioned, analog signal for each tower  Will go to flash ADC boards in ATLAS  Could be used for cosmic trigger instead  Trigger on towers of 0.4 x 0.4 for 8+8 modules requires the following –add analog signals in groups of 16 towers (0.1x0.1 to 0.4x0.4) –Require energy threshold on sum (discriminate) –Take 8 2-fold coincidences between back-to-back towers –Take OR of the 8 coincidence outputs

6/24/03J. Pilcher21 LVL2 Hardware Data from drawer goes to ROD modules  1 module handles 8 drawers  8+8 modules  32 drawers or 4 RODs  Needs ROD crate and ROD Crate Controller  Might log data from RCC over Ethernet –Done for other systems in test beam ROD schedule?  2 prototype modules planned for September  Can we get 4?  Production not until next spring

6/24/03J. Pilcher22 Conclusions Commissioning with muons is attractive and necessary  The trigger rates look fine Try this week to agree on target configuration for next winter  Confirm responsibilities and explore timetable with TDAQ groups Over next few weeks make more precise list of items needed and identify items requiring more help People willing to help might meet in July to agree on division of tasks (phone + video + face-to- face)