IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.

Slides:



Advertisements
Similar presentations
S. N. HOM Impedance in Vacuum … 1 of 40 Sasha Novokhatski SLAC, Stanford University Machine-Detector Interface Joint Session April 22, 2005 HOM Impedance.
Advertisements

Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.
Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
PillBox Cavity Update (Button Tests) Bob Rimmer NFMCC CM University of Mississippi Jan 13, 2009.
M. Sullivan Mini-workshop on the MEIC design Nov 2, 2012.
1 PEP Status M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 6 Summary.
2E34 Meeting and MCC News IR2 Vacuum Studies (Mike Sullivan) Plans for Lattice and Optics Work (Yunhai Cai)
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
Slides from Mike Sullivan’s Presentation at the 2E34 Meeting.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
IR2 Vacuum Status M. Sullivan for S. Ecklund, A Fisher, S. Novokhatski, F-J Decker, A. Kulikov, S. DeBarger, U. Wienands, S. Gierman, M. Petree, many BaBarians.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Topics from this weeks 2E34 meeting M. Weaver Jan 6, 2006.
PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 1 PEP-II Overview and MMS Status Michael Sullivan SLAC National Accelerator Laboratory.
IR 2 Vacuum Update M. Sullivan for PEP-II team For the 2e34 meeting of Feb. 15, 2006.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
IR vacuum M. Sullivan PEP-II meeting Feb. 22, 2007.
13 Dec MAC Review – Future IR Heating Issues 1 Future IR Heating Issues 13 December 2004 Stan Ecklund.
Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components.
Proton Source Repairs Dan Bollinger 2/1/10. Cockcroft-Walton accelerators FNAL has 2 Cockcroft-Walton Pre-accelerators (Pre-acc) that provide beam to.
Griner Drilling Service
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
10 October 2003S. DeBarger PEP-II Vacuum Failures PEP-II Machine Advisory Committee.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
Interaction Region Vacuum Chamber Upgrades Presented by: Scott DeBarger Contributors: D. Arnett, B. Bigornia, C. Carr, J. Langton, S. Metcalfe, D. Kharahk,
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
1 IR Vacuum M. Sullivan MAC Review Oct , 2006 M. Sullivan for the PEP-II team Machine Advisory Committee Review October 25-27, 2006 IR Vacuum Update.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
Program Risks Risk Analysis Fallback Plans for the PEP-II B-Factory John T. Seeman DOE PEP-II Operations Review April 26, 2006.
IR Heating Issues Stan Ecklund 4 August PEP-II Run 4 Post Mortem IR Heating Issues2 Overview of IR Heating Issues Vertex Bellows –Cooling added.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
1 M. Sullivan IR update IR Update M. Sullivan for the 3 rd SuperB workshop SLAC June14-16, 2006.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
What’s Going on Inside My Engine? An Overview of Engine Assessment and Leakdown Testing By Scott Andrews and Bob Szilasie.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
Mini MAC II PEP-II hardware M. Sullivan Apr 23-24, 2009Page 1 PEP-II Hardware Status M. Sullivan SLAC National Accelerator Laboratory Mini-MAC II Frascati,
SuperB Gen meeting Oct 5-9, 2009 IR Interface 1 IR Interface Issues M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni, P. Raimondi, et al.
M Sullivan SuperB Workshop Elba, Italy May 31 - Jun 3, 2008
M. Sullivan Apr 27, 2017 MDI meeting
M. Sullivan SuperB General Meeting Perugia, Italy June 15-20, 2009
KEK news ( ) S.Tanaka.
M. Sullivan for the SLAC SuperB Workshop Jan , 2009
Long Shutdown for the LHC: Vacuum Beam Pipes
M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
Vacuum System Failures at HERA
Run coordinator report March 23 – 30, 2011
E. Paloni, S. Bettoni, R. Pantaleo, M Biagini, et al.
The IR beam pipe M. Sullivan For
The PEP-II Interaction e+e- Factories Workshop
PEP-II Status and Plans e+e- Factories Workshop
Interaction Region Design Options e+e- Factories Workshop
Accelerator R&D Results from the B-factory
Orbit Bumps in PEP-II to Maximize Luminosity
Some of the Points Raised During my JLAB Visit
Presentation transcript:

IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan

Tues of last week we opened up the vacuum in regions 4 and 2 to look for sources of arcing Region 4 had a very clear source of arcing from an RF gap ring that had partially fallen into the beam aperture –We found 2 cases where the gap ring was not properly positioned –After making sure about the gap and gap ring dimensions the system was put back together Friday –Discovered a vacuum leak in a water tube joint that was repaired with welding but then we uncovered another leak on the other water tube joint –Ended up replacing the pump tee with another unit Sunday day shift

Region 2 was searched initially on the forward side of the detector and no obvious trouble was found –First looked from outside the LER frangible link all the way down to the IP Be beam pipe (20 cm from the IP) –The IP bellows and what we could see of the Q1/Q2 bellows looked fine –Upon coming back out from the IP bellows we noticed an RF seal that didn’t look the same as the other seals at the Q2/Q4 pipe junction (picture) – In the borescope the surface looked like it might be pitted –We took apart the beam line up to this joint and after removing the seal found no obvious problem (no signs of discoloration or of arcing)

Interaction Region Layout LER HER 7039 gauge SIG11 LER sensitive 2187 gauge 3044 pump LER frangible link Detector 7043 pump 8020 pump 3027 gauge Support tube end bellows 3027 pump NEG pump Backward Q2 NEG Forward Q2 NEG

With the beam line apart up to this joint we able to completely look at the Q1/Q2 bellows and still found nothing wrong We did find that the vacuum gasket had been pinched in the Q2/Q4 junction Decided to put the beam line back together but also borescope the forward side HER chamber as far as we can and to borescope the backward LER chamber In the forward side HER beam line, we actually managed to get the borescope all the way down to the Q2/Q4 seal on the HER beam pipe in order to make sure that that seal was ok as well as all the seals from there on out including the frangible link We also borescoped in from the backward side LER beam line and found something we don’t like but that we decided to try to run with as is and not fix the problem right now The RF seal around one of the flange pairs in the Q1/Q2 bellows has 5 fingers that are not properly seated (picture) This bellows section is very hard to get to. It is inside the DIRC tunnel and many SVT cables as well as water, air lines and power cables have to be removed in order to get to this bellows.

We have regenerated the NEG pumps in region 2 and the pressure is coming down nicely (pictures) We have replaced the LER frangible link on the forward side with new spare bellows (some fingers were displaced and/or not engaged in the old unit) We have moved the RGA that was at 3056 to the 3027 location in the incoming LER We will need to scrub for at least a couple of days but perhaps we can start delivering luminosity in the near future

Pressure at the 3054 pump

Pressure at the 3044 pump

Pressure at the 3027 pump. At this time, the TSP in this location had not yet been flashed.