Multidisciplinary Engineering Senior Design Project xxxxx Project Name Preliminary Design Review mm/dd/yy Project Sponsor: Team Members: Team Mentor: Acknowledgements:

Slides:



Advertisements
Similar presentations
Instructions. Each presenter can have upto a maximum of 7 slides. Each presenter has 5 mins to explain : The Background The Customer The Problem The Solution.
Advertisements

Widget Project Update Team member1 Team member2 Team member3 Team member4 October 8, 2011.
R. I. T Mechanical Engineering Engineering Design Brief Case Study: What is the Engineering Design Process and Why is it Critical? Rochester Institute.
EPICS Design Review Template Notes:  Use the template as a guide to preparing your presentation….you may add, subtract, or rearrange as needed to tell.
MSD 11209: WOCCS: Long-Range RF Module Meet the Team Danelle Grabski- Electrical Engineering Jacky Ng- Electrical Engineering Josh Doolin- Electrical.
1. P09203 – 1kg Robotic Motor Module Gen 2 Platform This project is Sponsored by the Kate Gleason Foundation.  Team Members:  Lauren Farnsworth → Team.
Multidisciplinary Engineering Senior Design Project 06010: Unmanned Surveillance Vehicle Preliminary Design Review Team Members: Randy Cicale,
Multidisciplinary Engineering Senior Design Project 05xxx Project Name 2005 Critical Design Review May 13, 2001 Project Sponsor: Team Members: Team Mentor:
Multidisciplinary Engineering Senior Design Project 6508 Controls Lab Interface Improvement Preliminary Design Review 11/11/05 Team Members: Michael Abbott,
Project Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T MSD I Project Review Objectives of the Project Review Proposed Review Structure.
Multidisciplinary Engineering Senior Design Automated Plasma Generator Test System Preliminary Design Review 11/11/05 Project Sponsor: MKS, ENI Incorporated.
Multidisciplinary Engineering Senior Design Project Project Card Guide Redesign and Manufacture Preliminary Design Review November 11, 2005 Project.
EDGE™ A P D C Copyright © 2004 Dr. Edward Hensel P.E. and P.H. Stiebitz. All rights reserved. Technical Data Package & Team Notebook …what is it anyway?
Critical Design Review 05/12/2006 Team Members: Andrew Shabashevich, Greg Penoyer, Jessica Pierce, Tony Kukla, Bill Dugan, Gaurav Sanghi, Piyush Aggarwala.
P09713 – FRESH BREAD AND ROLL SCALING ROOM Senior Design Winter
Multidisciplinary Engineering Senior Design Project 6218 Soft Tissue “Tensile” Tester Preliminary Design Review 2/24/2006 Project Sponsor: Bausch & Lomb.
Multidisciplinary Engineering Senior Design Project 6218 Soft Tissue “Tensile” Tester Preliminary Design Review 2/24/2006 Project Sponsor: Bausch & Lomb.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
Engineering Senior Design Project Campus Model Preliminary Design Review 11/11/2005 Ed Bondgren Eric Bandemer Folusho Erogbogbo Mentor: Professor.
Multidisciplinary Engineering Senior Design Project Self-Triggered Tempo Meter Preliminary Design Review 02/24/06 Team Members: John Gifford (EE)
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Multidisciplinary Engineering Senior Design Project RFID Garage Door Entry System Preliminary Design Review Team Members: Kenneth Williams,
Multidisciplinary Engineering Senior Design Project 6508 Controls Lab Interface Improvement Critical Design Review 2/24/05 Project Sponsor: EE Department.
Project Organization Chart Roles & Responsibilities Matrix
Rochester Institute of Technology Kate Gleason College of Engineering Presents …
Proposed MITHI Concept Paper
Project Planning for New Model Home Pre-construction Rey Ross GBA 573 July 10, 2003.
CIS 499 Senior Seminar IT project management. Exercise. Write a testable problem statement in subject verb format. Who? Are the people going to use this.
Senior Design I: Preliminary Design Review RENEWABLE ENERGY USING HIGH-EFFICIENCY TURBINES J. Smith, J. Doe, T. Smith and M. Smith Advisor(s): J. Jones,
Senior Design I: Preliminary Design Review RENEWABLE ENERGY USING HIGH-EFFICIENCY TURBINES J. Smith, J. Doe, T. Smith and M. Smith Advisor(s): J. Jones,
EDGE™ Preparing a Poster for a Publication and Display Prepared by Edward Hensel (ME) Elizabeth DeBartolo (ME) Copyright © 2005 Rochester Institute of.
Multidisciplinary Engineering Senior Design Hardinge Universal Turret Project Critical Design Review May 13, 2005 Project Sponsor: Hardinge.
Opto-Electric Guitar Pickup Multidisciplinary Senior Design I RIT Spring/Fall
Project Plan. Project Plan Components Project Overview – Description and Strategy Business Case Summary Key Deliverables and Scope Critical Success Factors.
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Manager Core Competencies The core competency.
Test Plan and Execution Multidisciplinary Senior Design Speaker: Mike Zona
Managing Multiple Projects, Objectives and Deadlines Presenters: Laurel Cummings & Rose Pruneda Moderator: April Watson.
Senior Design II proposal A step-by-Step review. What is Senior Design?  Senior Design is a sequence of two courses during two consecutive semesters.
Widget Project Update Team member1 Team member2 Team member3 Team member4 October 2015.
THE FUTURE OF MAKING THINGS BIM Design Submission Team Details Team Name - Member 1 - Member 2 - Institution - General Floor Plan Project Name:
P16221 – FSAE Shock Dynamometer Preliminary Detailed Design Review November 13, 2015.
Critical Design Review 05/12/2006 Team Members: Andrew Shabashevich, Greg Penoyer, Jessica Pierce, Tony Kukla, Bill Dugan, Gaurav Sanghi, Piyush Aggarwala.
Design Report – Fall Semester. Title Page List name of project and team number List date List team members, advisor, sponsor Team logos.
Effective Communications - Group Project How to do your best for the Critical Design Review and for the Group Project!
THE FUTURE IS NOW Mechanical Design Submission Team Details Team Name - Member 1 - Member 2 - Institution - About the Innovative Project & Applicability.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
The Software Engineering Process Discussion Slides.
Positioning Sensor for Electric Motor Drive ENGR 498 Senior Design College of Optical Sciences Industrial Affiliates.
3/21/20161 Project Title Team Name Team membership Customer (if you have a customer) EEL3923C Junior Design (S11) Date: Project #
Information Flow Between Tools Early in the Engineering Design Process Kate E. Nordland Advisor: Dr. Edward Hensel M.S. Thesis Presentation July 23, 2007.
Project Management & Project Management Software
Systems Analysis and Design in a Changing World, 4th Edition
Business System Development
EPICS Design Review Template Notes:
Multidisciplinary Engineering Senior Design Project P06441 See Through Fog Imaging Preliminary Design Review 05/19/06 Project Sponsor: Dr. Rao Team Members:
Request for Proposal (RFP)
Team members: Project Manager: Facilitator: Customer Liason:
<PROJECT NAME> THEME STAKEHOLDERS BACKGROUND CURRENT CONDITION
SE Tasks for a Concept Development Project
E190Q – Final Project Presenation
CIS 210 Systems Analysis and Development
Project Name Group Members.
R·I·T Engineering DesignPlannerTM Academic Year
1. Define 4. Implement 2. Measure 3. Analyse 5. Control YOUR LOGO
CIC BIM Competition Presentation Template & Content Guide
Kate Gleason College of Engineering Multidisciplinary Senior Design
Information Flow Between Tools Early in the Engineering Design Process
Wednesday, February 16, 4:00-6:00PM
1. Define 4. Implement 2. Measure 3. Analyse 5. Control YOUR LOGO
Progress Reports.
Presentation transcript:

Multidisciplinary Engineering Senior Design Project xxxxx Project Name Preliminary Design Review mm/dd/yy Project Sponsor: Team Members: Team Mentor: Acknowledgements: Kate Gleason College of Engineering Rochester Institute of Technology

Project Overview project background major needs of the sponsor

the process the team followed –needs assessment –concept development –feasibility assessment, etc. –project schedule (in gantt chart form)

Needs Assessment

Key Requirements & Critical Parameters

Overall System Diagram/Block Diagram

Analysis & Synthesis of Design Concepts Feasibility considerations Closed loop to Customer’s Specifications Feasible Design

Detailed Design

BOM & Costs

Anticipated Design Challenges/Risk

SD II Project Plan

Questions

Backup Slides and References