1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Ops. AGENDA 14.00 - 14.50 Operations status and.

Slides:



Advertisements
Similar presentations
XMM-Newton 1 Matthias Ehle - SCI-OAX EPIC BGWG Meeting#6 November 5 th, 2007 BGWG Report from the June XMM-Newton User Group Meeting Matthias Ehle.
Advertisements

XMM EPIC MOS Jenny Carter 5 th EPIC BG WG Meeting Palermo,11/04/07 BGWG blank sky updates and pn soft proton analysis Jenny Carter,
WORK PLAN FOR THE EPIC CALIBRATION TEAM (AND BEYOND)
Epic-Cal 4 Feb 2003 Flux check Richard Saxton XMM-SOC/SSC Flux Comparisons.
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal April ACIS Calibration: Recent Updates, Planned Updates, & Future Issues 2.E0102: Joint.
Bruno Altieri EPIC Calibration meeting, Feb. 1-3, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting MPE
Chandra Calibration Status ACIS 1.Gain correction files for epochs 30, 31 and 32 were released in CALDB (Sept 2007), (Dec. 2007) and
Chandra Calibration Status ACIS 1.Gain corrections for epochs 28 and 29 (Nov – April 2007) were released in CALDB 3.4 on May 16, Gain corrections.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring MPE, May 2006.
Chandra Calibration Status ACIS 1.Gain correction files for epochs 33 and 34 were released in CALDB (June 2008) and (Sep. 2008). HETG 1. An.
XMM EPIC MOS Steve Sembay ESAC 04/10/05 Implementation of the MOS spatial/temporal DRM: Does it work ? Zeta Puppis: Checking the line.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting November 6, 2007, Mallorca María Santos-Lleó (XMM-Newton Science Support.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC The XMM-Newton cross-calibration.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Palermo, April 2007.
XMM-Newton 1 M.Stuhlinger/M.Smith, ESAC PN Monitoring Mallorca, November 2007.
European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 Calibration of.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Marcus G. F. Kirsch Mallorca, Summary status of the EPIC calibration.
XMM-Newton 1 M.Stuhlinger, March 2010 Status of XMM-Newton cross-calibration using SASv10.0 Madrid, 24. March 2010.
6 November 2007Cal-Ops Meeting Mallorca Recent Results from EPIC MOS Life Test Facility Tony Abbey and Craig Brown University of Leicester Space Research.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton MOS Timing Mode calibration Marcus.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Calibration of the EPIC MOS Timing.
XMM-Newton 1SCI-SA Populating the CCF Immediate needs are driven by the requirement to test the SAS over the summer before public release. (A release called.
Chandra Calibration Status  Recent releases  Current Calibration projects  Cross-Calibration between Chandra and other X-ray telescopes  Revisions.
XMM-Newton 1 M.Stuhlinger/P.Calderon, ESAC Re-appearance of the MOS1 CCD1 meteorite column during revs Madrid, 23. March 2010.
XMM EPIC MOS Andy Read 5 th EPIC BG WG Meeting Palermo, Sicily 11/04/07 EPIC BG working group: 5th meeting 11/04/07 - Palermo =================================================================
XMM-Newton 1SCI-SA Status of MOS and PN Realtime Operations 1) Current Operations Status 2) Eclipse preparation improvements 3) Slew Exposures 4) Offset.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Results from the EPIC- Calibration-Workshop.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting April 8, 2008, Mallorca María Santos-Lleó (XMM-Newton Science Support Manager)
I. de la Calle Astronomy Science Operations Division Science Operations Department Background Working Group Meeting, Mallorca – 30/03/2009 XMM-Newton ESAC.
EPIC TTD#14 SCIENCE OPERATIONS Mallorca, 01 February 2005 L. Metcalfe SCI-SDX Science Support Manager 1 Science Operations & Data Systems Division Research.
Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Pedro Calderón Riaño Guillermo Buenadicha.
EPIC TTD#16 SCIENCE OPERATIONS MPE, 04 May 2006 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager 1 Science Operations & Data Systems Division Research.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Cross calibration PKS
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, October 2006.
Martin Stuhlinger Mallorca, European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with SASv7.1 CAL Meeting.
Tony Abbey XMM Cal/Ops meeting – MPE, Garching – 5 May 2006 Tony Abbey – University of Leicester Reducing MOS data rate.
Mallorca, 1st of February 2005 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 1st of February 2005.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC XMM-Newton Instrument Anomaly Tool & Cross-Calibration Tool Marcus G. F. Kirsch.
XMM 1Michael Smith, ESAC EPIC PN Monitoring Provided by Michael Smith.
XMM EPIC MOS Jenny Carter 8 th EPIC BGWG Meeting Mallorca, March 09 Jenny Carter, University of Leicester Andy Read, University.
Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.
Page 1 ACTIONS EPIC_10/1 on Munoz. EPIC_10/1 on Munoz. –Closed: MS delivered Slew Data Files  EPIC_10/2 on Smith: to verify whether PHS_tools checks for.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting Mallorca
Martin Stuhlinger X-Ray Universe 2005, Sep.26-30, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha PALERMO 11/04/07.
XMM 1 EPIC MOS Monitoring. XMM-Newton 2 Martin Stuhlinger, ESAC MOS Bad Pixel Monitoring.
Guillermo Buenadicha / Neil Cheek SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha Neil Cheek MALLORCA 26/10/2006.
XMM EPIC MOS Andy Read EPIC CAL/OPS Meeting MPE, Germany 04-05/05/06 EPIC BGWG XMM-Newton EPIC BackGround Working Group founded (~1.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Long term EPIC in-orbit calibration plan Marcus G. F. Kirsch.
XMM EPIC MOS Andy Read 4 th EPIC BG WG Meeting Mallorca, Spain 25/10/06 Agenda: EPIC BG working group: 4th meeting 25/10/06 – Mallorca.
Science Operations Status Maria Santos-Lleo EPIC cal & ops meeting, Madrid March, 2010.
RGS/MOS-cooling Results February 03, 2003 L. Metcalfe 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton.
XMM EPIC MOS Steve Sembay Mallorca 06/11/07 Report on three NRCO calibration observations On axis observation of absorbed Seyfert.
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal Update on ACIS Calibration 1) Update to the ACIS contamination model 2) Temperature-dependent.
XMM EPIC MOS Andy Read OPS/CAL/BG (OCB) Meeting Mallorca, Spain 05-07/11/07 Report from the BGWG (05/11/07) Andy Read, on behalf.
SAG+SASWG Meeting Potsdam /15 PN Tasks – Status Report (update since Leicester) Hermann Brunner - MPE  epframes:  The dark quadrant problem.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
XMM 1Norbert Schartel Report From The Project Scientist Presentation for the XMM-Newton Users Group Meeting VI 19 th / 20 th May 2005 Norbert Schartel.
2014 Aquarius / SACD Science Team Meeting Agenda and Objectives Summarize the completion of NASA’s Aquarius 3-year prime salinity measurement mission (November.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Status of the EPIC calibration Presentation for XMM Newton UG 18 May 2006 Marcus.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, April 2008.
Date of download: 6/2/2016 Copyright © 2016 SPIE. All rights reserved. View of the XMM-Newton spacecraft subsystems, with external shrouds and structure.
FGM Report 21 st Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox Imperial College London 24 March 2015.
XMM-Newton Users Group Meeting #6 Science Support ESAC, 19 th. / 20 th. May 2005 L. Metcalfe SCI-SDX 1 Science Operations & Data Systems Division Research.
EPIC Calibration & Operations Meeting

Presentation transcript:

1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Ops. AGENDA Operations status and Matters arisingL. Metcalfe G. Buenadicha EPIC instrument health/monitoringM. Smith Future instrument operations at ESAL. Metcalfe DISCUSSION with Coffee: Operations interface between ESA and the PI teams

2 Science Operations & Data Systems Division Research & Scientific Support Department Page 2 XMM-Newton Meeting/action Status SubjectActioneeDue EPIC TTD-0014/3 Open Explain increases in pn offset variance in the 840M. Smith to 870 plus revolution range EPIC TTD-0014/9 Open Make MOS2 CCD5 effect public M.Stuhlinger EPIC TTD-0015/3 Open Subsequently to evaluate and decide which of the A.Abbey items resulting from action 15/2 can be delivered EPIC TTD-0016/1 Open Investigate the possibility of MOS Small Window A. Abbey, mode in peripheral CCDs M.Casale ACTIONS

3 Science Operations & Data Systems Division Research & Scientific Support Department Page 3 XMM-Newton SCIENCE OPERATIONS STATUS for EPIC TTD MEETING PALERMO April 2007 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager

4 Science Operations & Data Systems Division Research & Scientific Support Department Page 4 XMM-Newton CONTENTS Significant meetings and dates Operations: Status & Modes General Calibration Points Data Processing - SSC Miscellaneous

5 Science Operations & Data Systems Division Research & Scientific Support Department Page 5 XMM-Newton SIGNIFICANT MEETINGS & DATES

6 Science Operations & Data Systems Division Research & Scientific Support Department Page 6 XMM-Newton OM Cal.& TTD MSSL Next 17Apr.2007 Intnl. Working Group on cross-calibration and the 08-11May2007 definition of X-ray standards no.II. (IACHEC) MEOR Review Team presentations at ESTEC 09-10May 2007 MEOR Review Board meets at ESTEC22 May2007 Users Group meeting #8 (UG#8) Dry Run#1 Thursday 24May2007 UG#8 Dry Run#2 Thursday31May2007 ESAC Science Workshop 2007 (3 days from...) 04-06June2007 XMM-Newton Users Group meeting # June2007 SAS Workshop June2007 "X-rays from nearby ESAC (Faculty) Sep.2007 EPIC Consortium Leicester 11-13Sep.2007 EPIC Cal./Ops. Mallorca29-30Oct.2007 Calibration: Background Working Group (BGWG) 31 Oct.2007 ESAC Faculty Wk. Shop on Hot Stars~Oct.2007 SIGNIFICANT MEETINGS

7 Science Operations & Data Systems Division Research & Scientific Support Department Page 7 XMM-Newton SIGNIFICANT DATES I Proceedings of 2006 Conference (“ Variable and Broad Iron Lines around Black Holes ”) distributed as Astronomische Nachrichten/Astronomical News Volume 327, Issue 10, Pages (December 2006) SAS SAS 7.1 to be released mid-July (linked to reprocessing and 2XMM)

8 Science Operations & Data Systems Division Research & Scientific Support Department Page 8 XMM-Newton SIGNIFICANT DATES II AO6 Call Closeed XRPS09 Feb.2007 Begin AO6 observations May2007 AO7 Call Announcement of Opportunity 28 Aug.2007 Due date for proposals 12:00UT 05 Oct.2007 Final OTAC approved programme late Dec.2007 For approved proposals only:==> Start of phase II proposal submission 14 Jan Closure of phase II proposal submission 09 Feb.2008 Start of AO-7 observations May2008 Page 8

9 Science Operations & Data Systems Division Research & Scientific Support Department Page 9 XMM-Newton OPERATIONS

10 Science Operations & Data Systems Division Research & Scientific Support Department Page 10 XMM-Newton STATUS and MODES  All instruments essentially stable  Slow Slew Mode implementation for general users in analysis  Slewing / re-pointing ‘mode’ for RGS implementation for general users in analysis.

11 Science Operations & Data Systems Division Research & Scientific Support Department Page 11 XMM-Newton

12 Science Operations & Data Systems Division Research & Scientific Support Department Page 12 XMM-Newton

13 Science Operations & Data Systems Division Research & Scientific Support Department Page 13 XMM-Newton

14 Science Operations & Data Systems Division Research & Scientific Support Department Page 14 XMM-Newton

15 Science Operations & Data Systems Division Research & Scientific Support Department Page 15 XMM-Newton

16 Science Operations & Data Systems Division Research & Scientific Support Department Page 16 XMM-Newton

17 Science Operations & Data Systems Division Research & Scientific Support Department Page 17 XMM-Newton

18 Science Operations & Data Systems Division Research & Scientific Support Department Page 18 XMM-Newton

19 Science Operations & Data Systems Division Research & Scientific Support Department Page 19 XMM-Newton GENERAL CALIBRATION POINTS

20 Science Operations & Data Systems Division Research & Scientific Support Department Page 20 XMM-Newton CCF RELEASE NOTES IN PERIOD XMM-CCF-REL-222 Update of EPIC MOS2 gain epoch revs Oct-2006 XMM-CCF-REL-221 Update of EPIC MOS2 CTI epoch revs Oct-2006 XMM-CCF-REL-201 EPIC pn Frame Times and Clock Sequences02-Nov-2006 XMM-CCF-REL-224New MOS CTI CCFs public15-Mar-2007 XMM-CCF-REL-225Update of EPIC MOS Gain15-Mar-2007 XMM-CCF-REL-226RGS Bad Pixels22-Mar-2007 XMM-CCF-REL-205 PN telescope effective area modification at high E 07-Apr-2007

21 Science Operations & Data Systems Division Research & Scientific Support Department Page 21 XMM-Newton NRCOs & EORs NRCOs 64 Investigation of EPIC soft flux discrepancies MK Approved OM photometric calibration AT RGS-Procyon: The RGS wavelength scale APo and line-spread function 67 MOS redistribution off axis and QE check MK MOS redistribution off-axis and QE check-2 MK Calibration of pn temperature effects MK EORs 01 MOS 3x3 mode QE and pattern Uncom. MK Cal. Of RGS single-node readout Uncom. APo

22 Science Operations & Data Systems Division Research & Scientific Support Department Page 22 XMM-Newton DATA PROCESSING - SSC

23 Science Operations & Data Systems Division Research & Scientific Support Department Page 23 XMM-Newton Turn-around time between data acquisition and GO (PIPE) delivery as of 31-December-2006

24 Science Operations & Data Systems Division Research & Scientific Support Department Page 24 XMM-Newton MISCELLANEOUS PUBLICATIONS OTHER …

25 Science Operations & Data Systems Division Research & Scientific Support Department Page 25 XMM-Newton Dec  1341

26 Science Operations & Data Systems Division Research & Scientific Support Department Page 26 XMM-Newton