Allowances INSY 3021 Auburn University Spring 2007.

Slides:



Advertisements
Similar presentations
© 2008 Prentice Hall, Inc.S10 – 1 Operations Management Supplement 10 – Work Measurement PowerPoint presentation to accompany Heizer/Render Principles.
Advertisements

PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J S10-1 Operations.
Ozcan: Chapter 6 Reengineering (Overview)
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
VIDEO DISPLAY TERMINAL SAFETY The applications of computer technology and the accompanying use of video display terminals (VDT’s) is revolutionizing the.
Manual Handling. What is manual handling? Manual Handling is….. Any activity requiring the use of force exerted by a person to: Lift Lower Push Pull Or.
WORK SAMPLING Lecturer: S.U.Seçkiner Source: Motion and Time Study Design and Measurement of Work.
INSY 3021 Time Study Auburn University Spring 2005.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 8 Human Resources in Operations Management.
Maintenance Work Measurement
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
Work Design and Measurement
Presented by Student Name Workplace Issues – Lecture 4.
Work Measurement Time is important in work systems because of its economic significance. Most workers are paid for the time they are on the job. For any.
© 2008 by Prentice Hall4-1 Human Resource Management Chapter 4 JOB ANALYSIS, STRATEGIC PLANNING, AND HUMAN RESOURCE PLANNING.
Section 4-2 Sasha Keefer 1 st Per Kinds of Mental Disorders.
Chapter 11 Work System Design.
Work Design and Measurement Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
INSY 3021 Auburn University Spring 2008 Performance Rating.
7 Design of Work Systems.
Operations and Supply Chain Management, 8th Edition
Work Study Process Analysis Operation Analysis (Micro) Motion Study
4. Time Study The major objective of this chapter is to learn how to calculate a time standard based on stopwatch time study procedures.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
© 2006 Prentice Hall, Inc.S10 – 1 Operations Management Supplement 10 – Work Measurement © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
TI 2111 Work System Design and Ergonomics 13. Workplace Design.
Work Measurement and Standard Setting
Work Design and Measurement McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
- For 6 th Semester Job Design, Production and Operations Standards, and Work Measurement.
Company LOGO Work Measurements Lab # 5. Outline 1. Work Study 2. Method Study 3. Work Measurement 4. Time Study 3. Standard Time June 4, 20162Lab # 5:
Research in Communicative Disorders1 Research Design & Measurement Considerations (chap 3) Group Research Design Single Subject Design External Validity.
Section 6-5 The Central Limit Theorem. THE CENTRAL LIMIT THEOREM Given: 1.The random variable x has a distribution (which may or may not be normal) with.
Job Design Job design involves specifying the content and methods of job What will be done Who will do the job How the job will be done Where the job.
Ozcan: Chapter 6 Reengineering Dr. Joan Burtner, Certified Quality Engineer Associate Professor of Industrial Engineering and Industrial Management.
Work Study Work Measurement.
Allowances Practice Problems. Example 1 Suppose you have a fine assembly task –Standing –Requires approximately 300 kCal / hr (based on HR measurement)
Methods, Standards and Work Design: An Introduction INSY 3021 Auburn University Spring 2008.
SECTION 2 STRATEGIC DESIGN
UNIVERSITY OF COLORADO COLORADO SPRINGS Office Ergonomics University of Colorado Colorado Springs Environmental Health and Safety.
IENG 301 FUNDAMENTALS OF WORK STUDY AND ERGONOMICS
Work Measurement Vital inputs for: Standard Time
ENG M 501 Production and Operations Management Chapter 6A Job Design and Work Measurement Lecture 04a: 27 January 2009 John Doucette Dept. of Mechanical.
Company LOGO Work Measurements Lab # 5. Outline 1. Work Study 2. Method Study 3. Work Measurement 4. Time Study 3. Standard Time February 17, 20162Lab.
Ch 10 Job Design & Work Measurement Heizer and Render
1 ISE Chapter 24: Determining Time/Job Uses for time/unit information  Cost allocation  Production and inventory control  Evaluation of alternatives.
1 Time Study and Work Measurement Chapters: 12.Introduction to Work Measurement 13.Direct Time Study 14.Predetermined Motion Time Systems 15.Standard Data.
10 - 1© 2011 Pearson Education Time Studies  Involves timing a sample of a worker’s performance and using it to set a standard  Requires trained and.
Predetermined Time Systems
IE 366 Chapter 24 Time/Job. IE 366 Work Measurement ● Goal: determine standard time for a task. ● Techniques – Direct Time Study – Predetermined Time.
7 Design of Work Systems.
7 Design of Work Systems.
Human Resource Management (HRM)
Operations Management Work Measurement Supplement 10
Chapter 25 Time Study Supplementary Material from:
Predetermined Time Systems
JOB DESIGN Work Measurement.
Chapter 7 Design of Work Systems McGraw-Hill/Irwin
Ozcan: Chapter 6 Reengineering
Human Resource Management (HRM)
Office Ergonomics University of Colorado Colorado Springs
JUS 510 Education for Service/tutorialrank.com
Process and Capacity Analysis Capacity Requirements Analysis
الأستاذ المساعد بقسم المناهج وطرق التدريس
Allowances Practice Problems.
Introduction to Work Measurement
Time Studies Involves timing a sample of a worker’s performance and using it to set a standard Requires trained and experienced observers Cannot be set.
(Lecturer in Mech. Deptt.)
Work Measurements Lab # 5.
Production and Operations Management
Summer Training Industrial Engineering Department
Presentation transcript:

Allowances INSY 3021 Auburn University Spring 2007

Uses Accounts for interruptions, delays, and slowdown in the workplace Must be both accurate and correct Can be calculated by Production Study or Work Sampling

Production Study Requires complete observation over a long period of time Record specific instances of Non- Value Added Activity Data must be adjusted to the normal performance level Long, tedious (technician & operator), results may be biased

Work Sampling Requires a large # of random observations Frees the technician to perform other duties No use of a stopwatch is necessary Technician simply records what each operator is doing Yields an approximation

Work Sampling Shortfalls Analyst should not anticipate observations Confine observations to predetermined subjects Study accuracy depends on both the number of observations and the sample scheduling

Personal Needs Those interruptions necessary to the general well-being of the employee Trips to water fountain, restroom, etc… Can be a function of the working environment Typically 5%

Basic Fatigue Accounts for the energy expenditure to perform the given work Typically 4% under Normal Conditions

Variable Fatigue Lessening of the will to work Can be mental or physical, or a combined effect Factors include: Noise, heat, humidity, posture, muscular exertion, tediousness, general health of the worker Can be directly measured by declining output production over the course of the day

Primary Considerations Abnormal posture: sitting Vs..standing Vs. bending Vs Muscular force: time Vs. exertion level; recovery Atmospheric conditions Noise and Illumination levels Visual & mental strain Monotony and Tediousness

Unavoidable Delays Interruptions from: supervisor, dispatcher, time study technician, material faults, interference from servicing multiple machines

Avoidable Delays Social visits Day-dreaming Idleness Unnecessary work interruptions

Policy Allowances Different performance under exceptional circumstances ADA, new-employees, light duty, elderly, etc…

Allowances Typically about 15% Personal interruptions Fatigue Unavoidable delay Standard Time (ST) ST = NT (1 + allowances)

Questions & Comments