March 22, 20051 Prototype Fabrication Economic & Test Plan QDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew.

Slides:



Advertisements
Similar presentations
February 17, Aerodynamics 2 PDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew Rodenbeck Jason Tang.
Advertisements

College of Engineering and Computer Science Department of Mechanical and Materials Engineering Wright State University Regular Class Aircraft SAE Aero.
Propulsion PDR 1 Team 1 September 21, 2006.
The Black Pearl Design Team: Ryan Cobb Jacob Conger Christopher Cottingham Travis Douville Josh Johnson Adam Loverro Tony Maloney.
SAE AERO Chase Beatty (Team Leader) Brian Martinez (Organizer) Mohammed Ramadan (Financial Officer) Noe Caro (Historian) Brian Martinez.
Chase Beatty (Team Leader) Brian Martinez (Organizer) Mohammed Ramadan (Financial Officer) Noe Caro (Historian) SAE AERO Chase Beatty.
Team BIOHAZARD Presents: Project CRUENTO. CRUENTO: Latin – to make bloody; stain with blood.
1 Design Group 2 Kat Donovan - Team Leader Andrew DeBerry Mike Kinder John Mack Jeff Newcamp Andrew Prisbell Nick Schumacher Conceptual Design for AME.
Project Presentation Boiler Xpress December 5, 2000 Team Members Oneeb Bhutta Matthew Basiletti Ryan Beech Micheal Van Meter AAE 451 Aircraft Design.
Completed Design Review Team Airblade Timothy Davenport Brian Guerrero Mark Kastantin Oscar Kataura William Peters Robert Taylor.
DR2 Presented by: Mark Blanton Loren Garrison Chris Peters Jeff Rodrian September 26, 2000 Chris Curtis.
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Critical Design Review Team 1.
Vehicle Sizing PDR Presented by: Mark Blanton Chris Curtis Loren Garrison September 21, 2000 Chris Peters Jeff Rodrian DR2.
The Barn Owls Chris “Mo” Baughman Kate Brennan Christine Izuo Dan Masse Joe “Sal” Salerno Paul Slaboch Michelle Smith.
March 3, Structures and Weights 2 PDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew Rodenbeck Jason.
October 30, 2001A&AE Fall, Critical Design Review Brian Barnett Rob Benner Alex Fleck Ryan Srogi John Keune.
March 8, Propulsion 3 QDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew Rodenbeck Jason Tang Joe Taylor.
Final Design review December 5, 2000
Group 3 Heavy Lift Cargo Plane
Design Review Three Micro Air Vehicle Project: P Sponsored by Impact Technologies The Boeing Company Mark Baybutt Electrical Engineering.
Team 5 Prototype Fabrication, Economic and Test Plan QDR Presented By: Maria Mullins Charles Stangle.
Prototype Fabrication, Economic, & Test Plan QDR Tung Tran Matt Drodofsky Haris Md Ishak Matt Lossmann Purdue University AAE 451 Fall 2006 Team 4 Mark.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
March 1, Aerodynamics 3 QDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew Rodenbeck Jason Tang Joe.
March 10, Dynamics & Controls 2 PDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew Rodenbeck Jason.
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Team 1: Propulsion QDR 2 Team 1 October 3, 2006.
Team 5 Structures PDR Presented By: Ross May James Roesch Charles Stangle.
Flight Performance, Stability and Control PDR Brian Barnett Rob Benner Ryan Srogi John Keune Alex Fleck.
(Tentative) Plan for Last Days of School. Friday 5/8 / Monday 5/11 Work on empathy final project Tuesday 5/12 / Wednesday 5/13 (MIN.) Work on empathy.
Team 5 Critical Design Review Trent Lobdell Ross May Maria Mullins Christian Naylor Eamonn Needler Charles Reyzer James Roesch Charles Stangle Nick White.
SAE AERO Chase Beatty (Team Leader) Brian Martinez (Organizer) Mohammed Ramadan (Financial Officer) Noe Caro (Historian) Chase Beatty.
Team 6: “Soldier Portable UAV” David Neira TJ Worden Matthew Martin Joshua Mellen Ona Okonkwo Josiah Shearon A IR HERCULES 1.
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok Preliminary Sizing PDR 26 September, 2000.
The Lumberjacks Team /16/12 Brian Martinez.
Order of Presentation David – Intro and Fall Review Matt – Testing and Summary of Changes Josiah – Details on New Design Josh – Electrical Hardware Ona.
DESIGN OF THE 1903 WRIGHT FLYER REPLICA MADRAS INSTITUE OF TECHNOLOGY CHENNAI - 44.
March 24, Critical Design Review Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew Rodenbeck Jason Tang.
Ashley Brawner Neelam Datta Xing Huang Jesse Jones
AAE 451 Aircraft Design First Flight Boiler Xpress November 21, 2000
Final Design Team 6 December 2 nd, UAV Team Specializations David Neira – Power & Propulsion Josiah Shearon – Materials Selection & Fabrication.
ES 100 Micro Air Vehicle Project Montgomery College Professor: Dr. Charles Kung Summer I 2012 Team Members: Andrew Joe Laura Mohammed Nathelie Noella Stephanie.
February 24, Dynamics & Controls 1 PDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew Rodenbeck Jason.
April 28, Summary Project Presentation Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew Rodenbeck Jason.
DR1 PF, E, & FTP PDR Prototype Fabrication, Economic and Flight Test Plan Preliminary Design Review October 26, 2000 Presented By: Mark Blanton & Chris.
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Team 1: Prototype Fabrication, Economic, & Test Plan.
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Team 1: Propulsion QDR 3 Team 1 October 17, 2006.
Yaqoub Almounes John Cowan Josh Gomez Michael Medulla Mohammad Qasem
Vehicle Sizing AAE 451: Team 2 Michael Caldwell Jeff Haddin
Team 3 Structures and Weights PDR 2
VEHICLE SIZING PDR AAE 451 TEAM 4
Team 5 Final Design Review
Structures and Weights 1 QDR
Project Plan Review Team “Canard” September 14th, 2006 Team 1:
Team 5 Final Design Review
Propulsion 2 QDR AAE 451: Team 2 Michael Caldwell Jeff Haddin
Aerodynamics QDR 1 AAE 451: Team 2 Michael Caldwell Jeff Haddin
Structures Overview Material Properties Structures Construction
Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis
Team 5 Vehicle Propulsion PDR 1
Team 5 Vehicle Propulsion PDR 1
Fabrication, Economics and Test Plan QDR
Presented by Melissa Doan and Jason Hargraves
Propulsion PDR AAE 451: Team 2 Michael Caldwell Jeff Haddin
Vehicle Sizing PDR Team “Canard” September 14th, 2006 Team 1:
Prototype Fabrication, Economic, & Test Plan QDR
Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis
Prototype Fabrication, Economic, & Test Plan QDR
Prototype Fabrication, Economic and Flight Test Plan PDR
STRUCTURES & WEIGHTS QDR 1
Vehicle Sizing PDR AAE451: Balsa to the Wall
Presentation transcript:

March 22, Prototype Fabrication Economic & Test Plan QDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew Rodenbeck Jason Tang Joe Taylor Tyler Wilhelm AAE 451: Team 2

[ 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 ] March 22, Overview Aircraft 3-View Overall Schedule Economic Plan Flight Test Plan

[ 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 ] March 22, Aircraft 3-View Mission Requirements 15 min. endurance Take-off distance ≤ 60 ft. V stall ≤ 15 ft/s V loiter ≤ 25 ft/s 35 ft. turn radius

[ 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 ] March 22, Overall Schedule Thursday, March 10 Thursday, March 24 Monday, March 28 Thursday, April 14 Tuesday, April 19 Tuesday, April 26 Thursday, April 28 Parts Ordering Thiokol Draft Report Due Critical Design Review Prototype Fabrication Component Testing Flight Testing Flight Readiness Review First Official Flight at Mollenkopf Athletic Center Thiokol Final Report Due Summary Project Presentation

[ 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 ] March 22, Overall Schedule Thursday, March 24 to Saturday, April 2 Monday, March 28 to Saturday, April 2 Saturday, April 2 to Saturday, April 9 Saturday, April 2 to Saturday, April 9 Saturday, April 9 to Sunday, April 10 Sunday, April 10 to Tuesday, April 19 Prototype Wing Fabrication and Testing Component Testing Wing Fabrication Fuselage Fabrication Install Components Flight Testing / Modifications

[ 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 ] March 22, Economic Plan Total Person-Hours (as of Week 9 - 3/21/05):1700 hours Estimated Total Person-Hours at Project Completion:3500 hours

[ 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 ] March 22, Economic Plan Component Testing Motor and Controller$ Rate Gyro $ Receiver $ Servos $ Battery$ Propellers$ Total$ Prototype Fabrication and Testing EPP Foam$ Balsa$ Ultrakote$ Landing Gear$ Epoxy$ Total$ Cost Estimation

[ 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 ] March 22, Economic Plan

[ 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 ] March 22, Flight Test Plan Schedule / Location of Flight Testing  April 14 – 19  Possible Locations (depending on availability) Outside  Airport Intramural Fields  West Lafayette High School  McAllister Park Inside  Mollenkopf Athletic Center  Lambert Fieldhouse  Armory

[ 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 ] March 22, Flight Test Plan Objectives  Unpowered Glide Stability Lifting Capabilities  Straight Line / Turning Flight Include Take Off and Landing Endurance Flying Qualities

[ 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 ] March 22, Summary Aircraft 3-View Overall Schedule Economic Plan Flight Test Plan Questions?