CMS Tracker Week – L3 Meeting – April 2003 – Patrick Gartung 1 UC Riverside Testing Facilities Patrick Gartung University of California, Riverside.

Slides:



Advertisements
Similar presentations
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Advertisements

Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
E122 E123 E124 E125 E126 E127 E128 E129 E130 E131 E135 E136 E137 E138 E136 Solar Support Centre Desks for 4 people + connection to Bruce’s Workbenches.
US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 1 CMS Si Tracker: Breakout Session Dept.
L2 L3 CMS tracker manager meeting June W. Beaumont Universiteit Antwerpen 6/10/01 l2l3UAjune2001b.sdd Module Long term test activities University.
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
Thermal Testing of TEC/TOB Hybrids at UCSB 1/20/04 Slide 1 Thermal Testing of TOB/TEC Hybrids at UCSB.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 25 August 2003 Sam Burke UCSB HEP Group.
US CMS Silicon Tracker : Schedule J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
DOE/NSF Review, BNL, May 20, Incandela1 CMS Tracker: Cost, Schedule, Planning and M&O Joe Incandela, University of California Santa Barbara US CMS.
Finding ST Sensors that cause CMN: A Follow up to TSC Meeting N. 215 Prof. J. Incandela UC Santa Barbara US CMS Tracker Project Leader Tracker Steering.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
Anthony AffolderUS CMS Meeting 12/3/2002Proposal of UCSB Short-term Testing Program Assumptions Electrical and optical hybrids not burnt-in prior to arrival.
CMS Tracker Week – Module Test Meeting – July 2003 – Patrick Gartung 1 Long term rod testing software Patrick Gartung University of California, Riverside.
US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder1 US CMS Silicon Electronics Testing US CMS Lehman Review BNL 5/21/03 A.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Slide 1 Electrical Testing at UCSB -Anthony AffolderDOE review, January 18, 2005 Electrical Testing at UCSB: Hybrids & Modules Anthony Affolder On behalf.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 1 Quality Assurance Test Stand University of Rochester oQTC at Rochester,
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 18 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Institute of Physics ASCR, Prague Strip Sensors R&D for SCT and ITk Marcela Mikeštíková.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
US CMS Silicon Tracker Project Regina Demina KSU Florida State University May 11, 2002.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
R+D for future accelerators at Santiago Pablo Vázquez IGFAE-USC Instituto Galego de Gísica de Altas Enerxías Universidade de Santiago de Compostela.
Status report of test procedures for the readout pixel chips in Catania F.Riggi ITS Meeting, June 2002.
User Feedback Lesson 10. Modules 10.1Begin filming demo video 10.2Continue working on pitch video 10.3Continue working on prototype.
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Organization, Proposal and Funding We hope to finish the revised proposal this week Need some cleanup I added a section on simulation needs – should be.
An Overview of the FPIX Detector Upgrade – CMS Experiment
9/6/2017 2:01 PM9/6/2017 2:01 PM9/6/2017 2:01 PM1 Restaurant Service A student in.
Santiago in DEPFET for SUPERBELLE
Advanced hybrid detectors in Oxford: Facilities, experience, and interests Arndt, Bortoletto, Placket, Shipsey.
CMS Module Testing & Quality Assurance
ROD assembly and test in US
UCSB Testing Status Anthony Affolder
Update of US Testing Status
UCSB Testing Status Anthony Affolder
UCSB Short-term Testing Plan
CMS Module Testing Issues
Results from module testing
UCSB Testing Status Anthony Affolder
On behalf of the US TOB testing group
First Assembled Rod in US
US Testing Mailing List
UCSB Short-term Testing Plan
Hybrid & Module Testing Status
The Microscope.
Electrical Testing at UCSB: Hybrids & Modules
US Module Testing Progress Report
Hybrid & Module Testing Status
Electrical Testing at UCSB: Hybrids, Modules, & Rods
TOB Module Production Overview and Plan
Current Necessary for CMN Problem
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
US Module Testing Progress Report
Hybrid & Module Testing Status
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

CMS Tracker Week – L3 Meeting – April 2003 – Patrick Gartung 1 UC Riverside Testing Facilities Patrick Gartung University of California, Riverside

CMS Tracker Week – L3 Meeting – April 2003 – Patrick Gartung 2 Testing Readiness UC Riverside will investigate hybrids and modules failing production tests at UCSB Well equipped cleanroom available Used for testing Dzero silicon wedge detectors ARC and DAQ equipment on order Currently working at UCSB to help set up DAQ system for long term tests of modules and rods Will set up testing equipment at UC Riverside when it arrives

CMS Tracker Week – L3 Meeting – April 2003 – Patrick Gartung 3 Cleanroom Level clean room 29 feet X 13 feet

CMS Tracker Week – L3 Meeting – April 2003 – Patrick Gartung 4 Probe Stations Allesi REL-4500 semi-automatic analytic probe station and motion table Panasonic WV-CL120 video camera Hitachi VY-150A Color Video Printer Wentworth Laboratories Motion Table Nikon SMZ+10 Microscope

CMS Tracker Week – L3 Meeting – April 2003 – Patrick Gartung 5 Storage