Zack Wolf Undulator Magnetic April 11, 2006 LCLS Undulator Magnetic Measurements Zack Wolf, Scott Anderson, Ralph Colon,

Slides:



Advertisements
Similar presentations
Abstract Mechanical Inspection and Survey Steven Seiler, NSLS-II Project The Survey and Alignment Group is often the first and last to work with the Storage.
Advertisements

Alexander Temnykh Cornell University, Ithaca NY, USA
Zachary Wolf Undulator Tuning November 12, Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
Magnets for the ESRF upgrade phase II
SCU Measurements at LBNL
XFEL Undulator Efforts at DESY and Thoughts on LCLS-II H.-D. Nuhn June 30, 2010.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
October 12, 2006 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Good Field Region and Tuning Strategy 1 Undulator Good Field Region and.
Undulator Physics Requirements April 7, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Facility Advisory Committee Meeting Undulator Physics.
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
Zack Wolf Quadrupole Fiducialization October 20, A Vibrating Wire System For Quadrupole Fiducialization Zack Wolf,
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Systems.
LCLS Prototype Undulator Design LCLS Prototype Undulator Design Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
1 Zachary Wolf 1 Undulator Tuning Status June 9, 2009 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland MMF Layout, Workflow October 14, 2004 MMF Review 1 MMF Layout, Workflow Robert Ruland Magnetic Measurements Facility.
April 16, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zack Wolf Undulator Bench October 14, Undulator Bench Requirements Zack Wolf SLAC.
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project – from the prototype to the full scale.
J. Welch Talk MMF 10/14/04 LCLS Magnetic Measurement Facility Requirements Functional Temperature Vibration Earth's.
Zachary Wolf LCLS Undulator October 30, LCLS Undulator Tuning And Fiducialization Zack Wolf, Yurii Levashov, Achim.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet Design Workshop: Magnet Design and Analysis Charles Spataro, NSLS-II Project NSLS-II is a new 3Gev synchrotron.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
Option – 5m Undulators What is the optimum length for an LCLS undulator?  XFEL is using 5m undulator segments.  Is this optimum?  What are the advantages.
SR NSLS prototype magnets. Dipoles 90 mm aperture dipole Pole Ends will be matched to achieve the magnetic field quality ( )
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
CLAS12 Torus Magnetic Field Mapping Torus Magnetic Field - qualitative look at the field distribution How well do we need to know the B-field? - momentum.
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
October 27-28, 2005 FAC Meeting Undulator Metrology Catherine LeCocq, SLAC 1 Undulator Metrology Catherine LeCocq, SLAC October.
Physics Requirements Sensitivity to Manufacturing Imperfections Strategy  where to map field  measure deviation from ideal model  fit to error tables.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
SSRL EPU Magnetic Measurements Zachary Wolf March 15, 2013.
Moving Wire, Pulsed Wire and Long Coil Measurements on the SSRL Beam Line 5 EPU Scott Anderson SLAC Magnetic Measurements.
Magnetic Field optimization of EPU at TPS
Magnetic Measurements At SLAC
Overview Preparatory work at the MML BBA to define the reference orbit
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
CLAS12 Torus Magnetic Field Mapping
Magnetic Measurements For The LCLS Undulator System
LCLS Undulator Fiducialization
SCU Next Phase Meeting July 8, 2014.
Phase Adjustments: K vs
Beam-Based Alignment Results
Magnetic Measurements and Alignment at SLAC Robert Ruland & Zack Wolf
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Undulator Tuning Status
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
LCLS Undulator Tuning And Fiducialization
Undulator Alignment Plan
LCLS Undulator Magnetic Measurements
Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS July 11, 2007
Presentation transcript:

Zack Wolf Undulator Magnetic April 11, 2006 LCLS Undulator Magnetic Measurements Zack Wolf, Scott Anderson, Ralph Colon, Brendan Dix, Scott Jansson, Dave Jensen, Luis Juarez, Seva Kaplounenko, Yurii Levashov, Wei Wang, Achim Weidemann

Zack Wolf Undulator Magnetic April 11, 2006 Undulator Tuning, General Approach  Use ANL and DESY experience  Techniques have been developed at ANL and DESY which work very well.  We will use the best of the ANL and DESY measurement techniques as our starting point (both have been very generous in sharing with us).  We need to adapt for production measurements.

Zack Wolf Undulator Magnetic April 11, 2006 SLAC Magnetic Measurement Facility Floor plan divided into three functional areas Magnetic Measurements (± 0.1º C) Fiducialization and Assembly (± 1º C) Storage (± 2.5º C) Test stand lay-out is driven by requirement to match the Earth Magnetic Field conditions in lab to Undulator Hall, i.e. azimuth and gap orientation need to be identical LCLS-TN-04-1

Zack Wolf Undulator Magnetic April 11, 2006 MMF Under Construction Photos courtesy of Javier Sevilla Beneficial occupancy in March

Zack Wolf Undulator Magnetic April 11, 2006 Important Dates MMF Major Construction FinishedFeb. 17, 2006 MMF Beneficial OccupancyMarch 6, 2006 Kugler Bench CompleteApril 15, 2006 Kugler Bench At SLACMay 15, 2006 Kugler Bench Handover To SLACJune 15, st Article Arrives At SLACJuly 2, 2006 MMF Ready For MeasurementsJuly 28, 2006 Production Measurements StartAugust 29, 2006 (Approximate)

Zack Wolf Undulator Magnetic April 11, 2006 Undulator Measurement Benches ANL BenchDESY Bench LCLS-TN-03-7 Goal: Move probes along a very straight line through the undulator.

Zack Wolf Undulator Magnetic April 11, 2006 Kugler Bench On order, expected at SLAC May 15, Ready for use June 15, 2006.

Zack Wolf Undulator Magnetic April 11, 2006 SLAC Software Development Bench Bench software by Seva Kaplounenko (While we wait on the Kugler bench)

Zack Wolf Undulator Magnetic April 11, 2006 Undulator Measurement Steps 1)Place undulator 2)Mechanically align undulator to bench 3)Magnetically align Hall probe to undulator 4)Perform any required large gap adjustments and re-align 5)Straighten the X and Y trajectories 6)Minimize phase errors 7)Perform phase matching 8)Determine K vs X, move probe to the X value which gives the specified K 9)Add fiducialization magnets to undulator ends, locate center of fiducialization magnets 10)Move undulator to CMM, finish fiducialization LCLS-TN-03-7

Zack Wolf Undulator Magnetic April 11, ) Place Undulator Ben Poling placing the ANL prototype on the SLAC prototype bench 12/9/05.

Zack Wolf Undulator Magnetic April 11, ) Place Undulator

Zack Wolf Undulator Magnetic April 11, )Place Undulator Built by Gordon Bowden, Yurii Levashov, Scott Jansson SLAC CAM Movers Brake Motor Harmonic Drive CamPotentiometer Bearing

Zack Wolf Undulator Magnetic April 11, ) Mechanically Align to Bench Use Capacitive Sensors We tested capacitive sensors in TTF undulators at DESY Yurii Levashov

Zack Wolf Undulator Magnetic April 11, ) Mechanically Align To Bench Undulator aligned to fixed height of reference pole.

Zack Wolf Undulator Magnetic April 11, ) Mechanically Align to Bench  Use 6 capacitive sensors on an arm  Gives x, yaw, y, pitch, and roll  Have reference poles at each end  Calibrate sensors with micrometers Previous experience from PEP II and SPEAR III

Zack Wolf Undulator Magnetic April 11, ) Magnetically Align Hall Probe By y x  Technique  Every N’th pole, move probe vertically, find minimum  Every N’th pole, move probe horizontally, find midpoint between edges  Plot (x, y) vs z, fit for magnetic alignment x y

Zack Wolf Undulator Magnetic April 11, ) Magnetically Align Hall Probe SLAC Measurements

Zack Wolf Undulator Magnetic April 11, ) Perform Any Large Gap Adjustments ANL TB-48 Tapered Shim

Zack Wolf Undulator Magnetic April 11, ) Straighten X And Y Trajectories LCLS-TN-05-5 Simultaneously measure Bx and By (Hall) and Bx from a coil

Zack Wolf Undulator Magnetic April 11, ) Straighten X And Y Trajectories  Apply shims to top and bottom poles  Shims weaken By, don’t cause Bx  Can’t strengthen pole, instead place shims on next pole to reduce deflection in other direction  Developing software to try to automate shim placement ANL/APS/TB-48 LCLS-TN-04-7 ANL/APS/TB-48 Isaac Vasserman’s Ideas

Zack Wolf Undulator Magnetic April 11, ) Straighten X And Y Trajectories Measured X Trajectory Calculate Shims Modeled X Traj With Calc Shims Measured X Traj After Calc Shims Applied Automate Shimming, Under Development

Zack Wolf Undulator Magnetic April 11, ) Check Hall Probe Field Integrals 150 Turns I1I1 I2I2 Long Coil LCLS-TN-05-22

Zack Wolf Undulator Magnetic April 11, ) Earth’s Field LCLS-TN-05-4 We will either a)Measure the field integrals and shim in the tunnel b)Put a mu-metal shield around the undulators (Isaac Vasserman)

Zack Wolf Undulator Magnetic April 11, ) Minimize Phase Errors Poles 51 and 52 are 1% too strong.  A magnet which is too strong can cause phase errors.  The trajectory is shifted, but there is no residual slope.  Correct with phase shims. LCLS-TN-04-7 Measured Phase Errors Calculated Shims Under development

Zack Wolf Undulator Magnetic April 11, ) Minimize Phase Errors  Measure By with a Hall probe  Calculate phase error  Calculate shims to correct error  Apply shims, repeat  Developing software to automate shim placement ANL/APS/TB-48LCLS-TN-04-7  We don’t have shims to strengthen a magnet, only weaken  Must locally reduce the gap to increase phase shift

Zack Wolf Undulator Magnetic April 11, ) Phase Matching Phase Matching Shim Data Entrance: Number of end poles = 5 Measured Phase At The Entrance Poles: (Phase = 0 at the entrance cell boundary.) Pole Number = Phase (deg) = Expected phase at pole number 6 = deg Entrance phase error (from pole 6) = deg Entrance phase match shim dimension = e+000 m Program provides shim information (under development) pi pi/2 (mod 2pi)

Zack Wolf Undulator Magnetic April 11, ) Determine K vs X Sinusoidal Field K X K0K0 Canted Poles K vs X LCLS-TN-04-7 Set the probe position to give the nominal K value. K Shim Data Measured K value = Desired K value = Required field change dB / B = e-002 Required gap change dgap = e-004 m Beam x motion required dx = e-002 m Analysis Program Gives K For Each X Run Calculated Undulator Parameters: Keff = Beff = T Lambda_rad = e-010 m X0X0 (prototype) (under development)

Zack Wolf Undulator Magnetic April 11, ) Add Fiducialization Magnets Need to relate magnetic field to tooling balls. Attach to undulator ends, measure offsets LCLS-TN Yurii Levashov

Zack Wolf Undulator Magnetic April 11, ) Move to CMM, Finish Fiducialization Want D D1 : Magnetic Measurement D2 : Calibration D3 : CMM D = D1 + D2 + D3

Zack Wolf Undulator Magnetic April 11, 2006 Conclusion Our group’s next big magnetic measurement project is the LCLS. A new magnetic measurements lab is being built. We will use Hall probes and coils to tune the undulators. Long coils will check the first and second field integrals. High gradient magnets with well defined centers will be used to fiducialize the undulators. Algorithms are being developed to automate shimming.