1 NGAO Science Instrument Reuse Part 1: NIRC2 NGAO IWG December 12, 2006.

Slides:



Advertisements
Similar presentations
Standard stars for the ZIMPOL polarimeter
Advertisements

Fast & Furious: a potential wavefront reconstructor for extreme adaptive optics at ELTs Visa Korkiakoski and Christoph U. Keller Leiden Observatory Niek.
GLAO instrument specifications and sensitivities
Área de Instrumentación NAHUAL Mechanical Concept Current Status F. Javier Fuentes Instituto de Astrofísica de Canarias September
Thomas Stalcup June 15, 2006 Laser Guidestar System Status.
NGAO Calibration/Simulation Source T. Stalcup, M. Pollard.
SXC meeting SRON, July 19-20, SXC meeting 19-20/07/2007 Alignment Positioning of mirror with respect to detector (internal). Positioning of total.
Observational techniques meeting #7. Detectors CMOS (active pixel arrays) Arrays of pixels, each composed on a photodetector (photodiode), amplifier,
Optical Astronomy Imaging Chain: Telescopes & CCDs.
LBT AO Progress Meeting, Arcetri Walter Seifert (ZAH, LSW) The LBT AO System and LUCIFER 1.Requirements for the commissioning of LUCIFER:
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
Thermal Infrared Observation using Adaptive Secondary Mirror (ASM) Hiroshi TERADA (Subaru Telescope)  Ground-based Thermal IR w/AO  Subaru Thermal IR.
All these Sky Pixels Are Yours The evolution of telescopes and CCD Arrays: The Coming Data Nightmare.
NGAO Companion Sensitivity Performance Budget (WBS ) Rich Dekany, Ralf Flicker, Mike Liu, Chris Neyman, Bruce Macintosh NGAO meeting #6, 4/25/2007.
All these Sky Pixels Are Yours The evolution of telescopes and CCD Arrays: The Coming Data Nightmare.
Impact of Cost Savings Ideas on NGAO Instrumentation December 19, 2008 Sean Adkins.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
NIR LOWFS for Keck and TMT Roger Smith & David Hale.
NGAO 1-tier Draft Optical Relay Design P. Wizinowich 12/7/07.
AURA New Initiatives Office S.C. Barden, M. Liang, K.H. Hinkle, C.F.W. Harmer, R.R. Joyce (NOAO/NIO) September 17, 2001 Instrumentation Concepts for the.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
TIGER The TIGER Instrument Overview Phil Hinz - PI July 13, 2010.
1 Laser Guide Star Wavefront Sensor Mini-Review 6/15/2015Richard Dekany 12/07/2009.
NGAO Science Instrument Reuse Part 2: Update and required feedback NGAO IWG Anna Moore, Sean Adkins NGAO Team Meeting January 22, 2007.
LO WFS Summit 6/19/2015Richard Dekany A Joint Meeting of the NGAO, IRIS, and K1 LO WFS Teams 12/15/2009.
The Path to NGAO Core Science Requirements Claire Max and Liz McGrath NGAO Team Meeting September 11-12, 2008.
IRMS Optical Subsystem Review. The Charter Confirm that the MOSFIRE design is a feasible baseline for IRMS (yes) Verify that the MOSFIRE design can achieve.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
NGAO Instrumentation Cost Drivers and Cost Savings September 2008 Sean Adkins.
NGAO Science Instruments Build to Cost Status February 5, 2009 Sean Adkins.
NGAO 1-tier Draft Optical Relay Design P. Wizinowich 12/3/07.
The Future of AO at Keck Sept 2004 Mike Brown, for the AOWG and Keck AO team.
1 Keck NGAO Project Replan: Science Cases and Requirements Claire Max NGAO Team Meeting 6 April 25, 2007.
NGAO Instrumentation WBS Replan By Sean Adkins April 25, 2007.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT.
W. M. Keck Observatory’s Next Generation Adaptive Optics (NGAO) Facility Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire Max for NGAO Team:
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
Black Holes in Nearby Galaxies Claire Max NGAO Team Meeting March 7, 2007.
Throughput and Emissivity for Alternatives to the Baseline AO Layout Don Gavel NGAO Telecon January 28, 2009.
Plan to develop system requirements through science cases Claire Max Sept 14, 2006 NGAO Team Meeting.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
Build to Cost Meeting: Major NGAO system cost savings ideas Don Gavel NGAO Team Meeting September 11-12, 2008.
Next generation wide field AO (GLAO) and NIRMOS for Subaru Telescope.
STATUS REPORT OF FPC SPICA Task Force Meeting March 29, 2010 MATSUMOTO, Toshio (SNU)
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
DL – IFU (Prieto/Taylor) Slicer: –25mas sampling … 0.9mm slices ~f/250 (assuming no anamorphism) Detector = 2k array of 18um pixels –Slit subtends 1-pixel.
Multiplexed High Res Spectroscopy at Keck – J. Cohen (PI), H. Epps (Optical Design), M. Rich (Project Scientist) Keck instruments for optical spectroscopy.
NORDFORSK Summer School, La Palma, June-July 2006 NOT: Telescope and Instrumentation Michal I. Andersen & Heidi Korhonen Astrophysikalisches Institut Potsdam.
3.1 Optomechanical systems (1) Scientific and engineering resources are available to carry out the optomechanical work on DECam. The highly distributed.
ASTR 3010 Lecture 18 Textbook N/A
AO188/LGS Status and Schedule 1 Yutaka Hayano January 31, 2008.
Comparison JVC TK-C9510E SLL1 vs. Samsung SCB-4000
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
Science with Giant Telescopes - Jun 15-18, Instrument Concepts InstrumentFunction range (microns) ResolutionFOV GMACSOptical Multi-Object Spectrometer.
System Performance Metrics and Current Performance Status George Angeli.
Extended Detector Cutoff Considerations WFIRST Project Office May
2/6/2016 DCH-1 JWST/MIRI Space Telescope Science Institute The Infrared Sky: Background Considerations for JWST Dean C. Hines & Christine Chen MIRI Instrument.
Introduction NICMOS (Near-Infrared Camera and Multi-Object Spectroscopy) was installed on the Hubble Space Telescope during SM2 in 1997 and has been the.
Robo-AO Overview: System, capabilities, performance Christoph Baranec (PI)
Theme 2 AO for Extremely Large Telescopes Center for Adaptive Optics.
GTC Commissioning (as of September 2008) Peter Hammersley (GTC)
Infrared Spectroscopy (and the Cassini Composite Infrared spectrometer) Adam Ginsburg September 25, 2007.
SOFIA — The Observatory
Science Priorities and Implications of Potential Cost Savings Ideas
Single Object & Time Series Spectroscopy with JWST NIRCam
Photon counting CCDs as wavefront sensors for LBT A.O. systems
Overview Instrument Role Science Niches Consortium science
Observational Prospect of NIREBL
Infrared Instrumentation for Small Telescopes
NGAO Trade Study GLAO for non-NGAO instruments
Presentation transcript:

1 NGAO Science Instrument Reuse Part 1: NIRC2 NGAO IWG December 12, 2006

NGAO IWG 12/12/062 Presentation Outline NGAO requirements for thermal NIR imager Comparison with current NIRC2 specifications NIRC2 upgrades required to meet NGAO goals Instrument configuration Cooling AO and instruments Constraints placed on NGAO system by using NIRC2 Alternative to NIRC2- starting from scratch Questions for NGAO science team Comments from PI to NGAO

NGAO IWG 12/12/063 NGAO requirements for thermal NIR imager Wavelength coverage 3 to 5.3  m (NGAO proposal value) Field of view25 ” X 25 ” (NGAO proposal value) but solar system science case requires only 2 ”, galactic center science requires 10 ” but seems to be a lower priority capability Plate scale/s25 mas (NGAO proposal value) Sensitivity and instrument background AO system + instrument background less than 10 to 20% of sky background emission in K-band (SRD 1_v3) Residual Wavefront error50 to 80 nm (Estimated)

NGAO IWG 12/12/064 NIRC2 comparison NGAO thermal NIR imager NIRC2 Wavelength coverage 3 to 5.3  m0.9 to 5.3  m Field of view25 ” X 25 ” 1k by 1k InSb detector with three plate scales results in: 10 ” X 10 ” 20 ” X 20 ” 40 ” X 40 ” Plate scale/s25 mas10 mas, 20 mas, 40 mas Sensitivity and instrument background AO system + instrument background less than 10 to 20% of sky background emission in K-band NIRC2 itself is cryogenically cooled except for outside surface of CaF 2 window so contributes little to background. Background is understood to be telescope and AO system dominated. Residual Wavefront error< 50 to 80 nm10 mas scale is100 nm 20 mas is ~200 nm 40 mas is “low” and limited by camera

NGAO IWG 12/12/065 Instrument configuration In discussion with the PI it is stated that: NIRC2 could operate on its side NIRC2 would probably cope with vertical rotation for field de- rotation if required NIRC2 is equipped with handling features that make it relatively easy to move

NGAO IWG 12/12/066 Cooling AO and NIRC2 NIRC2 could be placed inside the proposed cooled enclosure of the NGAO system In theory this temperature could be as low as -40 ºC but there are a few concerns that would need to be addressed, most important are the mechanism feedthrus and brakes. Feedthrus were tested to -25 ºC, torque doubled Brake is unspecified but minimum temperature probably limited by bearings Various external components are a combination of commercial and industrial temperature range, these can be enclosed in a “warm” box if required.

NGAO IWG 12/12/067 NIRC2 upgrades required to meet NGAO goals Residual wavefront error may need to be reduced, especially for the 20 mas scale Cause for high residual error in the 20 mas scale identified as an optical manufacturing defect (results in significant field dependent focus shift), this can probably be reduced with new camera optics (ROM cost est. $500K) NIRC2 readout system is obsolete (transputer), detector is no longer state of the art Remember that NIRC2 will be an old instrument come commissioning time of NGAO (first light was July 29, 2001)…

NGAO IWG 12/12/068 Constraints placed on NGAO system by using NIRC2 Input f-ratio is ƒ15 3 available plate scales (10 mas, 20 mas, 40 mas) but not 25 mas

NGAO IWG 12/12/069 Alternative to NIRC2: start from scratch Build only what is required: L and M band imager, one plate scale. Might re-use NIRC2 portions of the NIRC2 opto-mechanical design. Very rough estimate from Keith Matthews is $5.5M NIRC2 offers much more functionality (coronagraph mode, spectroscopy etc.) than what is currently required by the NGAO science cases for L and M band

NGAO IWG 12/12/0610 Comments and Questions We recommend changing the name of the instrument from “Thermal Near-IR Imager” to “L and M band Imager” to avoid confusion. The requirements for this instrument are sketchy, very limited treatment so far in the current SRD. 25″ x 25″ FOV is based on simply scaling from the nominal plate scale with a 1K x 1K detector, what are the real science driven FOV requirements? Further work is required to define the acceptable range of residual wavefront error for this instrument

NGAO IWG 12/12/0611 Comments from the NIRC2 PI Current combined emission from telescope and AO system is nominally acceptable in L band but is terrible in M. We may want to study the telescope background further in M band. The current K-mirror causes lots of problems due to non-uniformities in the mirrors and pupil wander due to wobble. Adds background and this significantly reduces contrast in K-band (H-band acceptable). A K-mirror near the focus is a bad idea (from a contrast point of view), but a large K-mirror away from the focus is more expensive. If one really wanted to do this right it should be a Cassegrain instrument with an adaptive secondary.