July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.

Slides:



Advertisements
Similar presentations
ILC Accelerator School Kyungpook National University
Advertisements

Bunch compressors ILC Accelerator School May Eun-San Kim Kyungpook National University.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
SuperKEKB Lattice and Dynamic Aperture H. Koiso Apr. 20, 2005 Super B Factory Workshop in Hawaii.
Dr. Zafer Nergiz Nigde University THE STATUS OF TURKISH LIGHT SOURCE.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
Wilson Lab Tour Guide Orientation 11 December 2006 CLASSE 1 Focusing and Bending Wilson Lab Tour Guide Orientation M. Forster Mike Forster 11 December.
July 22, 2005CESRc miniMAC1 Introduction to CESRc Optics M. Billing.
Beam-beam studies for Super KEKB K. Ohmi & M Tawada (KEK) Super B factories workshop in Hawaii Apr
Experimental Plan for Achieving Low Emittance in CesrTA David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
January 15, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity December/January vs September/October -Machine studies and instrumentation -Simulation.
Beam-Beam Optimization for Fcc-ee at High Energies (120, 175 GeV) at High Energies (120, 175 GeV) Dmitry Shatilov BINP, Novosibirsk 11 December 2014, CERN.
FCC-ee - Lepton Collider For the TLEP Lattice and Optics Design Team: B. Haerer, R. Martin, H. Garcia, R. Tomas, Y. Cai and many colleagues Optics Challenges.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
Topic Three: Perturbations & Nonlinear Dynamics UW Spring 2008 Accelerator Physics J. J. Bisognano 1 Accelerator Physics Topic III Perturbations and Nonlinear.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
January 13, 2004D. Rubin - Cornell1 CESR-c BESIII/CLEO-c Workshop, IHEP January 13, 2004 D.Rubin for the CESR operations group.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
New Progress of the Nonlinear Collimation System for A. Faus-Golfe J. Resta López D. Schulte F. Zimmermann.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
Beam-Beam Simulations for RHIC and LHC J. Qiang, LBNL Mini-Workshop on Beam-Beam Compensation July 2-4, 2007, SLAC, Menlo Park, California.
Matching recipe and tracking for the final focus T. Asaka †, J. Resta López ‡ and F. Zimmermann † CERN, Geneve / SPring-8, Japan ‡ CERN, Geneve / University.
1 IR with elliptical compensated solenoids in FCC-ee S. Sinyatkin Budker Institute of Nuclear Physics 13 July 2015, CERN.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Beam Loss Simulation in the Main Injector at Slip-Stacking Injection A.I. Drozhdin, B.C. Brown, D.E. Johnson, I. Kourbanis, K. Seiya June 30, 2006 A.Drozhdin.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Containing a.
Lecture 5 Damping Ring Basics Susanna Guiducci (INFN-LNF) May 21, 2006 ILC Accelerator school.
Luminosity of the Super-Tau-Charm Factory with Crab Waist D. Shatilov BINP, Novosibirsk TAU’08 Workshop, Satellite Meeting “On the Need for a Super-Tau-Charm.
SuperB Lattice Studies M. Biagini LNF-INFN ILCDR07 Workshop, LNF-Frascati Mar. 5-7, 2007.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
Nonlinear Dynamic Study of FCC-ee Pavel Piminov, Budker Institute of Nuclear Physics, Novosibirsk, Russia.
E Levichev -- Dynamic Aperture of the SRFF Storage Ring Frontiers of Short Bunches in Storage Rings INFN-LNF, Frascati, 7-8 Nov 2005 DYNAMIC APERTURE OF.
1 Alternative ILC Bunch Compressor 7 th Nov KNU (Kyungpook National Univ.) Eun-San Kim.
1 Alternative Bunch Compressor 30 th Sep KNU Eun-San Kim.
1 Dynamic aperture studies in e+e- factories with crab waist IR’07, November 9, 2007 E.Levichev Budker Institute of Nuclear Physics, Novosibirsk.
ILC luminosity optimization in the presence of the detector solenoid and anti-DID Reine Versteegen PhD Student CEA Saclay, Irfu/SACM International Workshop.
By Verena Kain CERN BE-OP. In the next three lectures we will have a look at the different components of a synchrotron. Today: Controlling particle trajectories.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
Beam-beam Simulation at eRHIC Yue Hao Collider-Accelerator Department Brookhaven National Laboratory July 29, 2010 EIC Meeting at The Catholic University.
2 February 8th - 10th, 2016 TWIICE 2 Workshop Instability studies in the CLIC Damping Rings including radiation damping A.Passarelli, H.Bartosik, O.Boine-Fankenheim,
Lattice design for FCC-ee Bastian Haerer (CERN BE-ABP-LAT, Karlsruhe Institute of Technology (KIT)) 1 8 th Gentner Day, 28 October 2015.
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
CESR as Light Source David Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Parameter scan for the CLIC damping rings July 23rd, 2008 Y. Papaphilippou Thanks to H. Braun, M. Korostelev and D. Schulte.
Optics with Large Momentum Acceptance for Higgs Factory Yunhai Cai SLAC National Accelerator Laboratory Future Circular Collider Kick-off Meeting, February.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Numerical Simulations for IOTA Dmitry Shatilov BINP & FNAL IOTA Meeting, FNAL, 23 February 2012.
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
Effect of high synchrotron tune on Beam- Beam interaction: simulation and experiment A.Temnykh for CESR operating group Cornell University, Ithaca, NY.
Envelope tracking as a tool for low emittance ring design
MDI and head-on collision option for electron-positron Higgs factories
Large Booster and Collider Ring
Coupling Correction at the Australian Synchrotron
First Look at Nonlinear Dynamics in the Electron Collider Ring
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
LHC (SSC) Byung Yunn CASA.
M. Tigner, R. Helms, M. Palmer, D. Rubin, D. Sagan Cornell University
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Beam-Beam Effects in the CEPC
ICFA Mini-Workshop, IHEP, 2017
Proposal for a CESR Damping Ring Test Facility
Sawtooth effect in CEPC PDR/APDR
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
3.2 km FODO lattice for 10 Hz operation (DMC4)
Presentation transcript:

July 22, 2005Modeling1 Modeling CESR-c D. Rubin

July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence of luminosity on: – wiggler nonlinearities – crossing angle, pretzel, parasitic beambeam interactions – Solenoid compensation – Bunch length and synchrotron tune – Damping decrement

July 22, 2005Modeling3 Weak strong beambeam simulation Motivation –Identify component or effect that is degrading beambeam tuneshift –Establish dependencies on details of lattice design –Including Wiggler nonlinearity Localization of radiation in wigglers Crossing angle Pretzel (off axis closed orbit) Parasitic interactions Sextupole distribution Bunch length Tunes Coupling Rfcavity deployment (finite dispersion) Solenoid compensation

July 22, 2005Modeling4 Weak strong beambeam simulation Model –Machine arc consists of a line of individual elements each represented by a nonlinear map, a matrix, or thin kicks –Solenoid, rotated quads, quads, sextupoles, electrostatic separators, RF cavities –Wigglers - field is analytic function fit to field table generated by finite element code –Interaction region Superimposed/ rotated quadrupoles, skew quadrupoles, solenoid represented by exact linear superposition –Radiation damping and excitation Damping and radiation excitation at beginning and end of each element => beam size, length, energy spread -Parasitic beambeam interactions Compute closed orbit,  -functions, emittance for strong beam Add 2-d beam beam kick at each crossing point –Beam beam kick Strong beam has gaussian distribution in x,y,z Parameters of closed orbit and focusing functions of strong beam => orientation, size Beambeam kick is 2-d, Longitudinal slices => sensitivity to crossing angle, bunch length, synchrotron tune

July 22, 2005Modeling5 Weak strong beambeam simulation Model –Machine arc consists of a line of individual elements each represented by a nonlinear map, a matrix, or thin kicks –Solenoid, rotated quads, quads, sextupoles, electrostatic separators, RF cavities –Wigglers - field is analytic function fit to field table generated by finite element code –Interaction region Superimposed/ rotated quadrupoles, skew quadrupoles, solenoid represented by exact linear superposition –Radiation damping and excitation Damping and radiation excitation at beginning and end of each element => beam size, length, energy spread -Parasitic beambeam interactions Compute closed orbit,  -functions, emittance for strong beam Add 2-d beam beam kick at each crossing point –Beam beam kick Strong beam has gaussian distribution in x,y,z Parameters of closed orbit and focusing functions of strong beam => orientation, size Beambeam kick is 2-d, Longitudinal slices => sensitivity to crossing angle, bunch length, synchrotron tune

July 22, 2005Modeling6 Weak strong beambeam simulation Procedure –Initialization Add beambeam elements at parasitic crossing points, and at IP Adjust horizontal separators to zero differential horizontal displacement at IP (PRETZING 13) Adjust vertical separators and vertical phase advance between separators to zero differential vertical displacement and angle at the IP (VNOSEING 1 and 2) Turn off beambeam interaction at IP and set weak beam tunes. Restore beambeam interaction at IP –Track 500 macro particles of weak beam Beginning after 1 damping time (20k turns) –Fit weak beam distribution as gaussian –Set strong beam size equal to fitted parameters of weak beam

July 22, 2005Modeling7 Weak strong beambeam simulation Parameters of simulation –Number of macroparticles (500) –Number of turns (5 damping times) –Weak strong approximation –Lifetime

July 22, 2005Modeling8 Weak strong beambeam simulation Comparison with measurements In simulation, tune scan yields operating point Data: Assume all bunches have equal current and contribute equal luminosity CESR-c 1.89 GeV, T wigglers Phase III IR

July 22, 2005Modeling9 Weak strong beambeam simulation Comparison with measurements In simulation, tune scan yields operating point Data: Assume all bunches have equal current and contribute equal luminosity CESR-c 1.89 GeV, T wigglers Phase III IR 5.3GeV Phase II IR

July 22, 2005Modeling10 Weak strong beambeam simulation –Lifetime Loss of 1 of 5000 particles in 100 k turns => 20 minute lifetime CESR-c 9X5CESR-c 9X4 Measure lifetime limited current ~ 2.2mA/bunch(9X5), ~2.6mA/bunch(9X4)

July 22, 2005Modeling11 Linearized wiggler map

July 22, 2005Modeling12 Weak strong beambeam simulation Specific luminosity. –Wiggler nonlinearities

July 22, 2005Modeling13 Weak strong beambeam simulation Specific luminosity. –Pretzel/crossing angle –Parasitic crossings

July 22, 2005Modeling14 Weak strong beambeam simulation In Zero current limit, beam size is big –No alignment errors –No coupling errors –Analytic single beam emittance ~0.05nm

July 22, 2005Modeling15 Weak strong beambeam simulation Solenoid compensation –Simulation with no solenoid –Beam size vs current

July 22, 2005Modeling16 Weak strong beambeam simulation Solenoid compensation –Energy dependence of coupling parameters

July 22, 2005Modeling17 Q x =0.52 Q y =0.58 Q z =0.089 Separators off Begin tracking outside Of compensation region X init =2mm  =0.0  = CESR-c 3 pair compensaton Solenoid compensation –Phase space

July 22, 2005Modeling18 Q x =0.52 Q y =0.58 Q z =0.089 Separators off Begin tracking outside Of compensation region X init =2mm  =0.0  = No solenoid

July 22, 2005Modeling19 Q2Q1 PM CLEO solenoid Compensating solenoid Skew quad

July 22, 2005Modeling20 Bunch length and synchrotron tune Consider 3 different configurations – CESR-c 12 wiggler optics with artificially reduced momentum compaction – “Alternating bend” machine. Instead of high field wigglers, each CESR dipole becomes a 5 pole low field wiggler – CESR-c with wigglers off

July 22, 2005Modeling21 Longitudinal emittance 12 wigglers, 1.89GeV/beam –  E /E ~ 0.084%,  ~ 50 ms,  h = 112nm –  p = –  v * = 12mm –Then  l = 12mm => Q s = Imagine, momentum compaction so reduced that –  l = 12mm => Q s = / Q s =0.091 =>  l = 7.3mm To achieve this miracle insert element M =

July 22, 2005Modeling22 Longitudinal emittance 12 wigglers, 1.89GeV/beam –  E /E ~ 0.084%,  ~ 50 ms,  h = 120nm –  p = –  v * = 12mm –Then  l = 12mm => Q s = Element M inserted in ring opposite IP –Then  l = 12mm => Q s = or Q s =0.089 =>  l = 7.3mm

July 22, 2005Modeling23 Longitudinal emittance Reduced momentum compaction and no solenoid

July 22, 2005Modeling24 Longitudinal emittance 0 wigglers, 1.89GeV/beam, alternating bends –Replace each CESR dipole with 5 sections of alternating field -where the length of each section is 1/5 CESR dipole -and B = 5B cesr no change in bending angle Then –  E /E ~ %,  ~ 43 ms,  h = 64nm (CESR-c,  h = 120nm) –  p = –  v * = 12mm –Then  l = 5.8mm => Q s = 0.089

July 22, 2005Modeling25 Longitudinal emittance 0 wigglers, 1.89GeV/beam, alternating bends –  E /E ~ %,  ~ 43 ms,  h = 64nm –  p = –  v * = 12mm –Then  l = 5.8mm => Q s = 0.089

July 22, 2005Modeling26 Longitudinal emittance Luminosity and damping decrement CESR-c, wigglers off, 1.89GeV/beam –  E /E ~ 0.022%,  ~ 556 ms,  h = 20nm (CESR-c,  h = 120nm) –  p = –  v * = 12mm –Then Q s = =>  l = 6.2mm

July 22, 2005Modeling27 Longitudinal emittance 0 wigglers, 1.89GeV/beam –  E /E ~ 0.022%,  ~ 556 ms,  h = 20nm –  p = –  v * = 12mm –Then  l = 6.2mm => Q s = –Current limited by low emittance < 1.4mA Luminosity lifetime < 2minutes at 1.4mA

July 22, 2005Modeling28 Summary Weak strong simulation of luminosity in good agreement with measurement Specific luminosity (L/I) at low current is insensitive to: –Wiggler nonlinearity –Pretzel/crossing angle –Parasitic crossings –Radiation damping time Simulation of lifetime indicates limit is parasitic beam beam interactions. Particles are lost to horizontal aperture Strong dependence on energy spread/bunch length/synchrotron tune –Energy dependence of solenoid compensation dilutes vertical emittance –Long bunch/ High synchrotron tune limit beambeam tune shift