Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Muon Collaboration Meeting LBNL February 16, 2005.

Slides:



Advertisements
Similar presentations
WP2: Targets Proposed Outline Work Programme Chris Densham.
Advertisements

A Free Jet Hg Target Operating in a High Magnetic Field Intersecting a High Power Proton Beam Van Graves, ORNL P. Spampinato,T. Gabriel, ORNL H. Kirk,
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
Magnetic Configuration of the Muon Collider/ Neutrino Factory Target System Hisham Kamal Sayed, *1 H.G Kirk, 1 K.T. McDonald 2 1 Brookhaven National Laboratory,
Harold G. Kirk Brookhaven National Laboratory Targetry Plans and Status MUTAC Review FNAL March 17, 2006.
BNL Review - December 12, 2005 MERIT Experiment Window Study - Proton Beam Windows - Optical Windows N. Simos, PhD, PE Energy Sciences & Technology Department.
K. McDonald LEMC Workshop 22 Apr 2008 From MERIT to a Muon Collider (Front End) K.T. McDonald Princeton U. Low Emittance Muon Collider Workshop Fermilab,
MARS15 Simulations of the MERIT Mercury Target Experiment Fermilab March 18, Neutrino Factory and Muon Collider Collaboration meeting Sergei.
Harold G. Kirk Brookhaven National Laboratory MERIT Experiment Status NFMCC Collaboration Meeting FNAL March 17-20, 2008.
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
Harold G. Kirk Brookhaven National Laboratory High-Power Targets H.G. Kirk Applications of High-Intensity Proton Accelerators FNAL October 20, 2009.
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
Harold G. Kirk Brookhaven National Laboratory Targetry Program 5 Year Plan H.G. Kirk Muon Collaboration Meeting LBNL February 16, 2005.
1 Optical Diagnostic Results of Hg Jet Target and Post-Simulation H. Park, H. Kirk, K. McDonald Brookhaven National Laboratory Princeton University Stonybrook.
Harold G. Kirk Brookhaven National Laboratory Meson Production Efficiencies IDS Target Meeting CERN December 17, 2008.
Primary Target Systems for a Muon Collider / Neutrino Factory. What has the experimental effort taught us thus far. N. Simos, H. Kirk, S. Kahn, P. Thieberger,
Harold G. Kirk Brookhaven National Laboratory Hg Jet Quadrupole Distortions MERIT Collaboration Meeting Princeton November 17, 2005.
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield.
1 Optical Diagnostic Results of MERIT (Mercury Intense Target) Experiment at CERN H. Park, H. Kirk, T.Tsang, K. McDonald, F. Ladeinde NFMCC Meeting Fermilab,
Optical Diagnostics Thomas Tsang tight environment high radiation area non-serviceable area passive components optics only, no active electronics back.
MERcury Intense Target (MERIT) Overview Van Graves, ORNL Syringe Procurement Kickoff Meeting Airline Hydraulics Bensalem, PA Oct 28, 2005.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
Harold G. Kirk Brookhaven National Laboratory Target System Update IDS-NF Plenary Meeting Arlington, VA October 18, 2011.
Harold G. Kirk Brookhaven National Laboratory Target Baseline IDS-NF Plenary CERN March 23-24, 2009.
2.April 2004A.Fabich, H.Kirk Summary for proposal of TT2A target test H.Kirk, A.Fabich March 2004 week 9 morning: Cryogenics,
IDS-NF Target Studies H. Kirk (BNL) July 8, 2009.
The TT2A Experiment A Proposal to the ISOLDE and Neutron Time of Flight Experiments Committee
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Mercury System Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Hg-system Safety.
1 3D Simulations for the Elliptic Jet W. Bo (Aug 12, 2009) Parameters: Length = 8cm Elliptic jet: Major radius = 0.8cm, Minor radius = 0.3cm Striganov’s.
MERIT Experiment Status MERcury Intense Target K. McDonald for the MERIT Collaboration August 30, 2007 TT2/TT2A: MERIT Build.272: Offices & Control Room.
Above: Power deposition in the superconducting magnets and the tungsten-carbide + water shield inside them, according to a FLUKA simulation Approximately.
Harold G. Kirk Brookhaven National Laboratory Recent Results from MERIT NUFACT09 Illinois Institute of Technology July 22, 2009.
Above: On-axis field profiles of resistive, superconducting and all magnets, and bore-tube radius r = 7.5 (B/20T) −½ cm. Above: Hoop strain ε θ in resistive.
Harold G. Kirk Brookhaven National Laboratory Meson Production Calculations 1 st Princeton/Oxford High-Power Targets Workshop Oxford May 1-2, 2008.
The MERIT experiment at the CERN PS Leo Jenner MOPC087 WEPP169 WEPP170.
Harold G. Kirk Brookhaven National Laboratory Proton Beam Spot Size MERIT EVO Meeting September 10, 2008.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
Harold G. Kirk Brookhaven National Laboratory The High-power Target Experiment at CERN NUFACT’04 Osaka, Japan July 27, 2004.
Target and Absorbers L2 Manager: K McDonald, Princeton U March xx, 2013 Presenter’s Name | DOE Mini-Review of MAP (FNAL, March 4-6, 2013)1 Mission Target:
Harold G. Kirk Brookhaven National Laboratory A MW Class Target System for Muon Beam Production AAC 2014 San Jose, Ca July 14-18, 2014.
Harold G. Kirk Brookhaven National Laboratory Targetry Concept for a Neutrino Factory EMCOG Meeting CERN November 18, 2003.
1 Optical Diagnostic Results of MERIT Experiment and Post-Simulation H. Park, H. Kirk, K. McDonald Brookhaven National Laboratory Princeton University.
Harold G. Kirk Brookhaven National Laboratory Targetry Concept for a Neutrino Factory Muon Meeting BNL January 26, 2004.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
Harold G. Kirk Brookhaven National Laboratory Target Considerations for Nufact and Superbeams ISS Meeting RAL April 26, 2006.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
CERN/BENE meeting, July Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg Who.
UKNF 12 January 2005 Target Studies J R J Bennett RAL.
Gallium as a Possible Target Material for a Muon Collider or Neutrino Factory X. Ding, D. Cline, UCLA, Los Angeles, CA 90095, USA J.S. Berg, H.G. Kirk,
Target and Pion Collection System and Support Facility
K. McDonald MAP Technical Board Meeting Nov 1, FY11 Target System Budget Proposal K. McDonald Princeton U. (November 1, 2010)
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN High-Power Targetry Workshop Oak Ridge, TN October 10, 2005.
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Report to MUTAC LBNL April 25, 2005.
Harold G. Kirk Brookhaven National Laboratory Targetry Program Collaboration Meeting Columbia University June 11, 2003.
Harold G. Kirk Brookhaven National Laboratory The E951 Targetry Program Targetry Meeting CERN September 19, 2003.
Simulation of High-Power Mercury Jet Targets for Neutrino Factory and Muon Collider R. Samulyak, 1,2 H.C. Chen, 1 H.G. Kirk, 2 K.T. McDonald 3 1 Stony.
1 February 07, 2008 Simulation Status of Mercury Jet Target HeeJin Park.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
Harold G. Kirk Brookhaven National Laboratory Muon Production and Capture for a Neutrino Factory European Strategy for Future Neutrino Physics CERN October.
ENERGY FLOW AND DEPOSITION IN A 4-MW MUON-COLLIDER TARGET SYSTEM
Target R&D A.Fabich, CERN 30.July 2004 A.Fabich, CERN.
MERIT Scientific goals and importance
Target and Horn status report
The Proposed TT2A Target Experiment
The Proposed TT2A Target Experiment
Optical Diagnostics tight environment high radiation area
Presentation transcript:

Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Muon Collaboration Meeting LBNL February 16, 2005

Harold G. Kirk Proposal to Isolde and nToF Committee Participating Institutions 1)RAL 2)CERN 3)KEK 4)BNL 5)ORNL 6)Princeton University Proposal submitted April 26, 2004

Harold G. Kirk Target Test Site at CERN

Harold G. Kirk

The Experimental Installation Point

Harold G. Kirk The Footprint of the Experiment

Harold G. Kirk Hg Jet System Layout

Harold G. Kirk The TT2 Tunnel Complex

Harold G. Kirk Surface above the ISR 6000 l Dewar Access Route Two 18kV sub-stations One 18kV Sub-station

Harold G. Kirk Run plan for PS beam spills Our Beam Profile request allows for: l Varying beam charge intensity from 5 (7) TP to 20 (28) TP l Studying influence of solenoid field strength on beam dispersal (B o from 0 to 15T) l Vary beam/jet overlap l Study possible cavitation effects by varying PS spill structure—Pump/Probe Charge Bucket Bo Beam Number Structure Shift of Shots 4 x 5TP x 5TP x 5TP x 5TP x 5TP mm 2 4 x 5TP mm 2 4 x 5TP mm 2 4 x 5TP mm 2 1 x 5TP x 5TP x 5TP x 5TP x 5TP x 5TP x 5TP x 5TP x 5TP x 5TP x 5TP Total 38

Harold G. Kirk Peak Energy Deposition Neutrino Factories Hg target; 1 MW 28 GeV proton beam; 15 Hz 1cm diameter Hg jet ; 1.5mm x 1.5mm beam spot 100 J/g Hg target; 4 MW 2.2 GeV proton beam; 50 Hz 2cm diameter Hg jet; 3mm x 3mm beam spot 180 J/g E951 Hg target; 4 TP 24 GeV proton beam; 0.3mm x 0.9 mm rms beam spot 80 J/g CERN PS (projected) Hg target; 28 TP 24 GeV proton beam 1.2mm x 1.2 mm rms beam spot 180 J/g

Harold G. Kirk High-power Target Experiment Budget agreed to by the Collaboration Technical Board on Sept. 22, 2004 Subject to continued flat funding from US DOE FY05FY06FY07Total Magnet Systems Solenoid Testing Cryogenics Power Supply340 PS Installation50 Decommission30 Hg Jet System Integration Nozzle R&D25 50 Optics25 Fabrication40 Decommission30 Project Management Simulations Experiment Operations50 Total

Harold G. Kirk Reports on Target Experiment CERN perspective Helmut Haseroth CERN infrastructureAdrian Fabich The Pulsed SolenoidPeter Titus The Cryogenic SystemYuri Ivanyushenkov (Paul Drumm) The Hg Jet System Van Graves The Hg Jet Nozzle testsKirk McDonald SimulationsRoman Samulyak