Anthony AffolderUS CMS Meeting 12/3/02DAQ Based Systems LV/HV Needs DAQ Power Supply Needs HV à 600 V/~1mA range –0.1-1  A Current Sensing –Over Voltage/Current.

Slides:



Advertisements
Similar presentations
L2 L3 CMS tracker manager meeting June W. Beaumont Universiteit Antwerpen 6/10/01 l2l3UAjune2001b.sdd Module Long term test activities University.
Advertisements

Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 25 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 11 August 2003 Sam Burke UCSB HEP Group.
1 Long Term Module Testing-Anthony AffolderTPO, December 11, 2003 Current Module LT Testing Capability Only Vienna Boxes Available  10 slots at each site.
Anthony AffolderUS CMS Meeting 12/3/02Previous Burn-in Experience CDF Burn-in Experience Hybrid Burn-in à 4 days with extensive tests at start/end à ~9.
Anthony AffolderUS CMS Meeting 12/3/2002Proposal of UCSB Short-term Testing Program Assumptions Electrical and optical hybrids not burnt-in prior to arrival.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
8/11/2006 FPIX TB meeting L. Perera 1 Pixel Power Supply Response Measurement Lalith Perera - Univ. of Iowa Carlos Florez, Simon Kwan, Charles Newsom,
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
Power supply planning for upgrade OT  Scintillating Fibre Wilco Vink On behalf of the SciFi group 19 May 2014.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
16 – 17 Jul 02Andrew Werner TRD Monitor Tube Readout Electronics: Shaping Peter Fisher, Bernard Wadsworth, Andrew Werner MIT 1.
MDT PS DCS for ATLAS Eleni Mountricha
Low Voltage LB status RPC detector and trigger group.
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
Assumption University Thailand EE4503 Electrical Systems Design Main Circuit 1.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
V.Shutov Dec.2014 Present Design Status Of Multichannel Power Supply For AHCAL SiPMs.
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
HV-Splitter for RENO Project S. Stepanyan, 김우영 경북대학교 Y.Kim Sejong University May-2008.
Adapting Muon Endcap UF/PNPI HV system for GEM V. Barashko, A. Korytov, A. Madorsky, G. Mitselmakher University of Florida/Physics N. Bondar, V. Golovtsov,
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
K.WyllieElectronics meeting 29/05/061 RICH Power Supplies & Grounding Thanks to Johan Morant Paolo Baesso Xavier Le Gouard.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
We really need to check all the results showed. We change the GEM from the fully-well-shielded to the less shielded one (top- bottom-fan out with aluminum)
Design of High Voltage System Kyungju Ma & Reno Collaboratiors
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
Como, Oct 20017th Conf. on Advanced Technology and Particle Physics Radiation tolerance and magnetic field behavior of CAEN HV and LV boards for.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
APVDAQ Status Markus Friedl 22 January M.Friedl: APVDAQ Status2 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do.
Design summary Status of the development & production - test run with S3a and S3b prototype - performance tests To do list for production & development.
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
The new SVD Power Supplies o General requirements o Power supplies structure o Tender process o Test system 2/10/2014SVD Power Supplies1 F.Forti, INFN.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
ELENA scrapers ELENA status for BI – electronics and software
T1 Electronic status Conclusions Electronics Cards:
W A T Supplying system test with external supplies
Misc. Topics Markus Friedl (HEPHY Vienna) 22 January 2015.
UCSB Testing Status Anthony Affolder
UCSB Testing Status Anthony Affolder
UCSB Short-term Testing Plan
UCSB Testing Status Anthony Affolder
RPC HV&LV status Introduction HV power supply tender
The IFR Online Detector Control at the BaBar experiment at SLAC
Hardware Needs (Near Term)
On behalf of the US TOB testing group
UCSB Short-term Testing Plan
The IFR Online Detector Control at the BaBar experiment at SLAC
US Module Testing Progress Report
RPC HV-LV project Introduction System requirements and description
Current Module LT Testing Capability
Current Module LT Capability
RPC HV-LV project Introduction System requirements and description
US Module Testing Progress Report
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
Equipment Status ARCS equipment status DAQ equipment status
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

Anthony AffolderUS CMS Meeting 12/3/02DAQ Based Systems LV/HV Needs DAQ Power Supply Needs HV à 600 V/~1mA range –0.1-1  A Current Sensing –Over Voltage/Current Protection à ~10-20 channels needed ((10 Vienna Cold Box or 10 Burn-in)/6 ARC) LV à No idea on DAQ/Hybrid Power Needs –10 channels worth of hybrid power Only CAEN SY127, SY527 are currently supported in DAQ software package à SY 1527 and SY 2527(??) hopefully in near future

Anthony AffolderUS CMS Meeting 12/3/02DAQ Based Systems LV/HV Needs CAEN SY127HS CAMAC/VME/PC controllable Mainframe ($9195) Only HV (10 Slots) à A327P Module ($2535 each, $2470 for 4+) –+1 kV/ 10 mA (4 channels/module) –5  A current resolution Over-voltage but no over-current protection à A326P module ($2510 each, $2445 for 4+) –2.5 kV/ 5 mA (4 channels/module) –2  A current resolution Over-voltage but no over-current protection Non-floating supplies

Anthony AffolderUS CMS Meeting 12/3/02DAQ Based Systems LV/HV Needs CAEN SY527HS CAMAC/VME/PC controllable Mainframe ($12965) Both LV/HV (10 Slots) à A567 Optocoupler Board ($830) –Separates CAENnet, NIM, TTL from module grounds LV à A516 Module ($3725) –+/-12 V/ 1.5 A (8 channels/module) –10 mA current resolution Programmable over-current/over-voltage protection –Floating Supply

Anthony AffolderUS CMS Meeting 12/3/02DAQ Based Systems LV/HV Needs CAEN SY527HS HV à A733 module ($3270) –+2.5 kV / 3mA (16 channels/module) –1  A current resolution Programmable over-current/over-voltage protection –Floating Supply

Anthony AffolderUS CMS Meeting 12/3/02DAQ Based Systems LV/HV Needs CAEN SY1527HS CAMAC/VME/PC controllable à Not yet supported by DAQ software Mainframe ($11750) Both LV/HV (16 Slots) LV à A1517 Module ($5060 each/ $4920 for 4+ modules) –+/-7 V/ 4 A (6 channels/module) –2 mA current resolution Programmable over-current/over-voltage protection –Floating power supply

Anthony AffolderUS CMS Meeting 12/3/02DAQ Based Systems LV/HV Needs CAEN SY1527HS HV à A1735P ($3515) –+1.5kV/ 7 mA (12 channels/module) –.5  A current resolution Programmable over-current/over-voltage protection –Floating Power Supply

Anthony AffolderUS CMS Meeting 12/3/02DAQ Based Systems LV/HV Needs Conclusions CAEN SY 127 and SY527 only multi-channel HV systems currently supported by DAQ software à SY 127 HV modules do not have over-current protection or floating HV channels CAEN SY 527 supports LV modules easing centralization of power controls à Similar to CAEN SY 1527 and SY 2527 proposed for final PS system à HV range large enough to IV scan to breakdown week delivery time (>$20,000) à Need to order as soon as possible to have any time to commission voltage control systems before large scale production