Bad News Bots E2 Project Design Review 2 - 2/7/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.

Slides:



Advertisements
Similar presentations
Bad News Bots E2 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland Concept Design Review.
Advertisements

MicroCART Micro processor C ontrolled A erial R obotics T eam Abstract MicroCART is a group of EE/CprE students tasked with developing an autonomous helicopter.
Robo-FootballE2 Project Design Review 1 - 1/31/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
MicroMouse Proposal Presentation Team: Amaze Me. Introduction Members and roles Brandon Gibu Brandon Gibu Updating webpage Ah Ram Kim Ah Ram Kim Contacting.
Engineering H193 - Team Project Spring Quarter 2003 P. 1 Progress Reports Week 4 Day 1.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Tuesday March 25, 2008.
1. P09203 – 1kg Robotic Motor Module Gen 2 Platform This project is Sponsored by the Kate Gleason Foundation.  Team Members:  Lauren Farnsworth → Team.
Project Review. Current State Currently on track to meet our mission objectives and cover all customer needs – Unpredictable to know whether or not sensors.
Preliminary Design Review HMS Bloodhound Matt Morris, Matt Prygoski, Jay Slaggert Fred Thwaites, Dan Zibton.
Operating Systems and Systems Programming CS162 Teaching Staff.
Bad News Bots E2 Project Design Review 6 - 2/21/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Bad News Bots E2 Project Design Review 8 – 4/3/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Preliminary Design Review Week 6 Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday March 13, 2008.
Preliminary Design Review HMS ‘Hound Dog’ Matt Prygoski Matt Morris Dan Zibton Fred Thwaites Jay Slaggert Thursday February 7, 2008.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
AME Senior Design Group E3: Hewlett-Packers January 29, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Preliminary Design Review
Small-Scale Solar Power Solar Power Rangers ~ Kevin Kastenholz 7 February 2008.
Preliminary Design Review Week 7 Group A3: HMS “Bloodhound” Matt Prygoski Matt Morris Jay Slaggert Fred Thwaites Dan Zibton Thursday March 20, 2008.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Bad News Bots E2 Project Design Review 5 - 2/28/2008 Ryan Bove Kara Collins * Peter Courtney Kyle O’Reilly Benjamin Rowland.
AME Senior Design Group E3: Hewlett-Packers February 19, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
Senior Project Design Review Remote Visual Surveillance Vehicle (RVSV) Manoj Bhambwani Tameka Thomas.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Team HazardHawk Team HazardHawk Last Week  Trim Budget Complete ○ Select new driveshaft, sprocket, bearings ○ Select additional component: clips.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 3, 2008.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday February 21, 2008.
AME Senior Design Group E3: Hewlett-Packers February 26, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2007 Progress Reports Week 4 Day 1.
Preliminary Design Review Week 9 THE DUKES OF HAZARD CAMILLE LEGAULT, NEIL KENNEDY, OMAR ROJAS, FERNANDO QUIJANO, AND JIMMY BUFFI March 20, 2008.
AME Senior Design Group E3: Hewlett-Packers March 11, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
A6: Team Rallye Potable Water Still Presented by: Nicole Del Rey October 3, 2006 Eric SabelhausNicole Del Rey Mike McConnellTim Rodts.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Low Cost Fundus Camera P15590 December 11th, 2014
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
WRSC 2011 RoBoaTAU. Group Members Ziv Ramati Vova Perelman Anthon Nepomnyashchiy Dror Laufer Dan Yaari Itamar Gilad.
Bad News Bots E2 Project Design Review 4 - 2/21/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Holiday Mentors Build Season Discussion December 18, 2006.
AME Senior Design Group E3: Hewlett-Packers March 18, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Team HazardHawk Team HazardHawk Last Week  Concept Finalization Complete  Preliminary CAD of Concept Complete  Budgetary Estimates Parts Selection.
CS-EE 481 Spring February, 2005 University of Portland School of Engineering Project Swift Fox Automotive Accelerometer & RPM Monitor Team Andrew.
Figure 12.1 The UP1-bot. Figure 12.2 Left: Radio Control Servo Motor and Right: Servo with Case and Gears Removed.
Team #5 Nicholas Baker Alejandro Haller Matthew Hudson Cristobal Riojas Sep 09, 2011 Fully automated machine that proves the concept of automating construction.
Senior Design Team Kirby Wigton Kirby Wigton Joseph Haggberg Joseph Haggberg Nate Perkins Nate Perkins Rosemary Peters Rosemary Peters Advisor Advisor.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
Lego Robotics Anthony Goodwin. Course Schedule: Week: 1. Intro to RCX, building, and RoboLab: Build using instructions. 2. Build using instructions, modify,
Dylan HruskaKevin Liu PresidentTechnical Director.
Project Final Presentation Joe Featherall.
Human-Powered Potable Water Still A2 Nate Barbera Katie Kimar Ryan Reis Connie Slaboch.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 10, 2008.
AME Senior Design Group E3: Hewlett-Packers February 7, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
STUDY ISLAND MCAS REVIEW TECHNOLOGY & ENGINEERING Assignment #5 Materials, Tools, Machines Engineering Design.
Engineering H193 - Team Project Spring Quarter Gateway Engineering Education Coalition P. 1 Progress Reports Week 4 Day 1.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Lab Day – Controller Lab 1 Brief Follow-up from Wednesday Grading.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
1 of 20 How to use the Compass A. Compass. 2 Compass: - Provides heading relative to Magnetic North, not true North HMC5883L V input - I2C (not.
Bad News Bots E2 Project Design Review 7 - 3/20/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
UOP WEB 237 Complete Class Check this A+ tutorial guideline at For more classes visit.
Minute Machine Final Oral Report
Rookie Team Experience Welcome
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
STUDY ISLAND MCAS REVIEW TECHNOLOGY & ENGINEERING
Team P16228: Magnetically Levitated Propeller
Presentation transcript:

Bad News Bots E2 Project Design Review 2 - 2/7/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland

Previous Week’s Action Items E2 Sensors Documented research on sensors (Kyle) Microprocessor Met with Mr. Brownell (Kara) Complete at least one of Mr. Brownell’s tutorials (Kara, Ryan) Website Added individual concept memos (Ben)

Previous Week’s Action Items E2 Prototype Field CAD model of prototype field (Peter) Concept sketches of peg system (Peter) Certifications One CNC certification (Peter) Completion of online CNC tutorial by two group members (Peter, Ryan) Completed machine shop certification (Peter)

Compiled information on sensors/motors Sensor and Motor Selection E2 *Sharp GP2D12 Infra-Red Range Sensor ($11.99) SFE HMC6352 Compass Module ($59.95) Inex Switch - Touch Sensor ($6.49) *R/C Servo, HS-311 ($16.95)

CAD Model of Prototype Field E2

Current Status (Website) E2

Current Status (Project) E2 On Schedule (no immediate showstoppers) Need to make decisions before trade studies Should finish ordering or purchasing of motors/sensors/materials before Spring Break Robot will move on wheels 2 wheels, each powered by a servo motor 1 guiding wheel Prototype field is designed Robot is still in design stage

Chosen to use Bi-POM Mini-Max microprocessor Current Status (Project) E2 Purchased a motor Team Orion Baja Mini-T Modified Motor

Next Week’s Action Items E2 Finalize a group concept (Feb 12) Continue to update the webpage Create a budget and upload it to the website Upload PDR’s to website Finalize website (Feb 12) Select and propose engineering feasibility/trade studies (Feb 12) Purchase sensors

Questions/Comments Bad News Bots E2