Performance Measures H. Scott Matthews February 3, 2003.

Slides:



Advertisements
Similar presentations
MASBO February Information to purchase Services Information to purchase Construction.
Advertisements

UNIT 1 CONCEPT OF MANAGERIAL ECONOMICS (continue)
Strategic Decisions (Part II)
Copyright 2010, The World Bank Group. All Rights Reserved. Importance and Uses of Agricultural Statistics Section B 1.
9 th Annual Public Health Finance Roundtable November 3, 2012 Boston, MA Peggy Honoré.
Modeling Human Reasoning About Meta-Information Presented By: Scott Langevin Jingsong Wang.
Global Infrastructure Stocks/ Reliability H. Scott Matthews February 12, 2004.
Civil and Environmental Engineering Carnegie Mellon University Sensors & Knowledge Discovery (a.k.a. Data Mining) H. Scott Matthews April 14, 2003.
Asset Management Scott Matthews January 22, 2004.
Life Cycle Costing and Reliability H. Scott Matthews February 5, 2003.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
Infrastructure Management Systems H. Scott Matthews March 31, 2003.
PRODUCTION PLANNING ELİF ERSOY Production Planning2 WHAT IS PRODUCTION PLANNING?  Production planning is a process used by manufacturing.
Performance Measures H. Scott Matthews February 10, 2004.
1 Engineering Economic Decisions Lecture No.1 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
GAAP PowerPoint #2. Understandability Decision Usefulness Relevance Predictive Value Feedback Value Timeliness Reliability Verifiability Neutrality Representational.
MultiMedia by Stephen M. Peters© 2002 South-Western Operations Management.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
Transportation leadership you can trust. presented to NCHRP Project Panel presented by Cambridge Systematics, Inc. with PB Consult Inc. Texas Transportation.
Role and Components of Project Evaluation
Testing Alternative Theories of the Firm, Transaction Cost, Knowledge-Based, and Measurement Explanations for Make-or- Buy Decisions in Information Services.
1 Ministry of Transport, Public Works and Water Management.
Information ITIL Technology Infrastructure Library ITIL.
Overview of Credit Risk Management practices in banksMarketing Report 1 st Half 2009 Overview of Credit Risk Management practices – The banking perspective.
Chapter 11: Strategic Leadership Chapter 8 Production and operations management.
Financial Planning For Major Capital Projects ECIS Annual Leadership Conference Seville, Spain April 25, 2014 Presenter: Larry Kraut.
Logistics and supply chain strategy planning
Lecture 4 Transport Network and Flows. Mobility, Space and Place Transport is the vector by which movement and mobility is facilitated. It represents.
Project Management Chapter 9 Project Quality Management Dr. Jana Jagodick Polytechnic of Namibia, 2012.
Quality Control Project Management Unit Credit Value : 4 Essential
Global supply chain problem. Different Cases (CASE-1) In March 2000, a serious fire at the plant destroyed critical production equipment. Within three.
Copyright 2010, The World Bank Group. All Rights Reserved. Planning and programming Planning and prioritizing Part 1 Strengthening Statistics Produced.
Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrological Technology Module 1: Essential Elements of a Hydrological.
Chapter 11: Strategic Leadership Chapter 16 Transport cost structures and pricing principles.
Introduction A GENERAL MODEL OF SYSTEM OPTIMIZATION.
Assessing the Capacity of Statistical Systems Development Data Group.
ROLE OF INFORMATION IN MANAGING EDUCATION Ensuring appropriate and relevant information is available when needed.
Stracener_EMIS 7305/5305_Spr08_ Supply Chain Analysis Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering EMIS 7305/5305 Systems Reliability,
81 8. Managing Human Resources Managing the IS function Centralized control of IS function Distributed control of IS function Federated control of IS function.
MURI: Integrated Fusion, Performance Prediction, and Sensor Management for Automatic Target Exploitation 1 Dynamic Sensor Resource Management for ATE MURI.
Prepared by Mrs. Belen Apostol DECISION-MAKING. Decision- Making as a Management Responsibility Decisions invariably involve organizational change and.
GAAP PowerPoint #2. Understandability Decision Usefulness Relevance Predictive Value Feedback Value Timeliness Reliability Verifiability Neutrality Representational.
Balanced Portfolio for Reliable Electricity System YES Inc. Brief Assessment.
Project Portfolio Management Business Priorities Presentation.
USACE Asset Management Risk and Reliability Workshop Condition Index Definitions Primer Allen C. Estes United States Military Academy.
Methodologies and Tools for Technology Needs Assessment: an Overview Zou Ji Dept. of environmental Economics and Management, Renmin University of China.
Chapter 13: Software Quality Project Management Afnan Albahli.
FORUM GUIDE TO SUPPORTING DATA ACCESS FOR RESEARCHERS A STATE EDUCATION AGENCY PERSPECTIVE Kathy Gosa, Kansas State Department of Education.
Intelligent Supply Chain Management Strategic Supply Chain Management
7 th Word Water Forum, 2015, Republic of Korea High-Level Panel OECD on Infrastructure Financing for a Water Secure World Jaime Melo Baptista (ERSAR, Portugal)
Chapter 6 Managing Capacity
Chapter 2 Operations and Supply Chain Strategies
3-1 Chapter 3: Network Planning CMB 8050 Matthew J. Liberatore.
Strategic approach to national implementation programmes for SEEA by UNSD Sixth Meeting United Nations Committee of Experts on Environmental Economic Accounting.
03/31/2010 v.20 DRAFT – DO NOT CITE OR QUOTE For NPC Study Discussion Only 1 Summary of Demand Perspective Hard Truths provided evaluation of baseline.
Development Account: 6th Tranche Strengthening the capacity of National Statistical Offices (NSOs) in the Caribbean Small Island Developing States to fulfill.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
WIS DOT MCLARY MANAGEMENT PERFORMANCE MEASUREMENT.
Maintenance BC - NZTA assessment in TIO
RPES Project Support Meeting
INTER-AMERICAN DEVELOPMENT BANK CAPACITY BUILDING AND TRAINING.
BANKING INFORMATION SYSTEMS
Infrastructure Management Systems
LOGISTICS NETWORK.
1.01 Generally Accepted Accounting Principles – Qualities of Accounting Information GAAP PowerPoint #2.
Paf 203: Data Analysis and Modeling for Public Affairs
Contents IT BALANCED SCORECARD AND BUSINESS BALANCED SCORECARD
Introduction to reference metadata and quality reporting
Presentation transcript:

Performance Measures H. Scott Matthews February 3, 2003

Recap of Last Lecture  Looked at Canning and World Bank data on infrastructure capacity and use across developing and developed countries  Period,  Some data holes  Generally inventory, rather than performance data

What is Performance?  Amer. Heritage Dictionary: “the act or manner of filling and obligation or duty”  Oxford: “The accomplishment, execution, carrying out, working out of anything ordered or undertaken; the doing of any action or work  Act or manner: method or ability  Fulfilling: meeting, satisfying  Duty: depends on purpose/objectives - may be strategic, economic, …

Alternative Definitions  “Degree to which a facility serves its users and fulfills the purpose for which it was built or acquired as measured by accumulated quality and length of service it provides to users” (HHU)  Ability to give satisfactory service  Humplick - 5 levels, 4 groups, measures, indicators

Why Care About It?  Performance measures used as tools to do the following (Humplick 94):  Support Management Decisions  Diagnose Potential Problems  Guide suppliers and users  Allocate Resources (aka Economics)  Track Data in Info. Systems

Humplick Framework  5 major levels  Service quality and reliability (users)  Network size and condition (facility)  Op. efficiency & productivity (provider)  Sectoral performance (investment, pricing)  Institutional performance  (Not in Humplick)  Performance measurement/assessment needs to consider both the supply (e.g. condition, inventory) and demand (e.g. usage) sides

Users of Performance Indicators  Facility/Network Users  Service Providers (US DOT, PennDOT)  Facility & Network Providers (firms)  Policy Sector and Institutions (FHWA)

Current Limitations in Assembling Performance Info  Data collected by multiple/different agencies  Data that is collected tends to differ in collection method and context  Type of data  Reliability/Precision  Spatial/temporal frequency  Consistency is variable

Common Characteristics of Infrastructure  Projects/components are parts of networks (e.g. bridge needs road)  Long time horizons (lifespans)  Presence of tradeoffs (build/maintain)  Indivisibility (can’t build half)  Spatial/temporal variability  Essential - to point of being ubiquitous  Expensive (often are one-off solutions)

Common Characteristics (2)  Subject to design standards  Could be DOT, IEEE, etc.  Subject to deterioration  Subject to uncertainty  Exhibit multiple modes of failure  Hierarchical Decision Process  Others?

Approaches to Performance  Condition Assessment  Condition Indices  Reliability Theory  Multi-dimensional Measures

Condition Assessment  Measure type, severity, extent of deterioration  Specific examples or indicators of deterioration used  Subjective ratings  Visual evaluation  Destructive testing  Direct Measurement  Does this sound familiar? (NBI)

Examples  Pavement - total length of cracks per lane mile, roughness, deflection  Bridge decks - chloride content  Pipeline - breaks per mile  Roof - square feet of wet insulation  Electric Power - ?  Communications - ?

Subjective Ratings  Predefined, arbitrary scale (see Grant and Dunker articles)  Requires training to minimize errors and discrepancies across inspectors  Ex: Present Serviceability Rating (PSR) AASHO Road Test: Bad = 0, Good = 5

Testing  Destructive: Requires actual invasive test (or removal) of infrastructure to be compared with reference samples  E.g. cores for density, chemical content  Bending/Breaking trusses  Other: uses technology and sensors to give similar results (e.g. Ground- penetrating radar to detect cracks/defects)

Condition Indices  Developed to address multitude of condition measures  Based on amount of distress or damage, results from non-destructive tests, relationships between use conditions  Condenses ‘vector’ of data into ‘scalar’

Index Requirements  Completeness- covers all aspects of deterioration  Measurable - to ensure consistency and repeatability  Relevance - provides rational quantification of condition  Example: Building Condition Index (BCI) = Total Deferred Maintenance / Replacement Plant Value  Excellent: BCI < 2% Good: 2% < BCI < 5%  Adequate: 5% 60%

Condition Index Limitations  Tries to make performance into one value  Hard to choose right aggregation  May be hard to integrate technology  Anything outside index not included

Reliability Theory  Based on probability of failure  Widely used in high tech industries  Can minimize costs while maximizing reliability