The Quality Improvement Model

Slides:



Advertisements
Similar presentations
Six Sigma Overview.
Advertisements

Process Database and Process Capability Baseline
Quality Tools and Techniques Standards in Action Quality Tools and Techniques Practicing quality techniques Author:
CSUN Engineering Management Six Sigma Quality Engineering Week 11 Improve Phase.
METODOLOGI SIX SIGMA PERTEMUAN 5 MEASURE PHASE OLEH: EMELIA SARI.
6-1 Is Process Stable ? The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process.
3-1 Planning the Project. 3-2 If a Problem Occurs During a Project Is It Most Likely Due to: 4 A) Poor Execution 4 B Poor Planning.
12–1. 12–2 Chapter Twelve Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Lean Six Sigma DMAIC Workshop Green Belt Part 5 6 σ Green Belt 5/10/20151Green Belt Training.
Six Sigma Foundations Continuous Improvement Training
Chapter 10 Quality Control McGraw-Hill/Irwin
Your Catapult Team Do the following:
The Quality Improvement Model
11-1 Quality Improvement Model Purpose: To provide a sequence of steps to improve any process so that the customers will realize the highest quality and.
9-1 Improve Process Capability The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process.
Six Sigma Quality Engineering
3-1 Select Measures Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process Capable ? Improve Process Capability.
Tools for Identifying Root Cause
 Individually  Given your sample of M&Ms, build a Pareto diagram by color  Before you destroy the evidence, be sure you have an accurate count.
The Quality Improvement Model
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
Overview of DMAIC A Systematic Framework for Problem Solving
Monitoring the Project
Statistical Process Control
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Paresh Naik December 3, 2004 STC India’s 6 th Annual Conference Using DFSS Tools for Better Technical Writing Processes and Deliverables
TTMG 5103 Module Techniques and Tools for problem diagnosis and improvement prior to commercialization Shiva Biradar TIM Program, Carleton University.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
1 Software Quality Engineering CS410 Class 5 Seven Basic Quality Tools.
SIX-SIGMA QUALITY Chapter Understand total quality management. 2. Describe how quality is measured and be aware of the different dimensions of quality.
Welcome to Lean Six Sigma Green Belt Training
5-1 Collect & Interpret Data Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process Capable ? Improve Process.
Analyze Opportunity Part 1
SYSE 802 John D. McGregor Module 6 Session 1 Systems Engineering Analyses II.
Setting up an Internal Audit Program By
First Developed by Motorola in the mid 1980's, the methodology only became well known after GE's Jack Welch made it a central focus of his business strategy.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Project Review Questions Ops Review Project Facilitation Process Excellence.
Problem Solving.
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
© 2001 Six Sigma Academy © 2003 Six Sigma Academy1 Champion Workshop Key Concepts.
Systems Analysis and Design in a Changing World, Fourth Edition
Measure : SPC Dedy Sugiarto.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
Project Storyboard (Page 1 of 2)
CORRELATION. Correlation key concepts: Types of correlation Methods of studying correlation a) Scatter diagram b) Karl pearson’s coefficient of correlation.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
PCB Take-Aways. Take-Aways  Learn and apply systematic approach for assessing and improving process capability using such tools (Minitab and Excel) as:
Using Total Quality Management Tools to Improve the Quality of Crash Data John Woosley Louisiana State University.
The seven traditional tools of quality I - Pareto chart II – Flowchart III - Cause-and-Effect Diagrams IV - Check Sheets V- Histograms VI - Scatter Diagrams.
House of Quality Tutorial for Medical Device Design CAPT Kimberly Lewandowski-Walker National Expert, Medical Devices U.S. Food and Drug Administration.
Quality Control All activities undertaken to control materials, processes and products in order to ensure quality of conformance Detects defects before.
UNIT 5.
Green Belt – SIX SIGMA OPERATIONAL Intro to Analyze Phase.
DMAICTools.com thanks our industry partners for sharing their forms - use it, improve it, share it, send us back a better version!
Quality Control Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
The Scientific Method The process of solving problems.
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Six Sigma Greenbelt Training

Decision Matrices Business Economics.
Pareto Charts Summary Process Steps
DMAIC Analyze, Improve, Control
BPT 2423 – STATISTICAL PROCESS CONTROL
Goal-Driven Continuous Risk Management
Measure Phase Wrap Up and Action Items
Goal-Driven Software Measurement
Pareto Charts Summary Process Steps
The Quality Improvement Model
Presentation transcript:

The Quality Improvement Model Define Process The Quality Improvement Model Select Measures Collect & Interpret Data Collect & Interpret Data: Diagnosing Variability Is Process Stable ? No Investigate & Fix Special Causes Purpose: Begin to understand why there is variability in data collected Yes Is Process Capable ? No Improve Process Capability Yes Use SPC to Maintain Current Process

What size shoe do you wear? Size 11 Shoes Key word is WHY? Manufacturing process varies Different Manufacturers 1 2 3 4 5 6 7 8 9 10 11 12 Why aren’t size 11’s all the same size?

GC CHDM Test Method Example Wish it was all the same % Water! WHY isn’t it? Will look at a tool to help us figure out WHY Why don’t we get the same %Water value?

Cause & Effect Matrix – A Tool to Identify and Quantify Sources of Variation Cause & Effects Matrix

Cause and Effects Matrix Relates the key inputs to the key outputs (customer requirements) using the process map as the primary information source Key outputs are scored as to importance to the customer Key inputs are scored as to relationship to key outputs Pareto of key inputs to evaluate in the FMEA and control plans Input into the initial evaluation of the Process Control Plan

Cause & Effect Matrix Steps Identify key customer requirements (outputs) from process map or other sources Rank order and assign priority factor to each Output (usually on a 1 to 10 scale) Identify all process steps and materials (inputs) from the Process Map Evaluate correlation of each input to each output low score: changes in the input variable (amount, quality, etc.) have small effect on output variable high score: changes in the input variable can greatly affect the output variable Cross multiply correlation values with priority factors and sum for each input

Examples Note: Only a partial list

Bottle Production Example Note: Only a partial Map

Cause & Effect Matrix Form 1. List Key Outputs Excel Template C&E Matrix.XLS

Bottle Production Example 1. List Key Outputs The Outputs are defined in Step 1 of Process Mapping

Cause & Effect Matrix Form 2. Rank Outputs as to Customer importance

Bottle Production Example 2. Rank Outputs as to Customer importance

Cause & Effect Matrix Form 3. List Key Inputs by Process Step Note: Information obtained from process map

Bottle Production Example This step uses the Process Map inputs directly. Notice the Process Inputs follow the Process map step-by-step. 3. List Key Inputs by Process Step Note: Only a partial list of inputs

Cause & Effect Matrix Form 4. Relate Inputs to Outputs

Relating Inputs to Customer Requirements You are ready to relate the customer requirements to the process input variables Correlational scores: No more than 4 levels 0, 1, 3 and 9 Assignment of the scoring takes the most time To avoid this, spell out the criteria for each score: 0 = No correlation 1 = The process input only remotely affects the customer requirement 3 = The process input has a moderate effect on the customer requirement 9 = The process input has a direct and strong effect on the customer requirement

Bottle Production Example 4. Relate Inputs to Outputs Note: Only a partial list of inputs This is a subjective estimate of how influential the key inputs are on the key outputs

Cause & Effect Matrix Form 5. Cross-multiply and prioritize Sum of (Rating x Correlation Score) values for all Requirements

Bottle Production Example 5. Cross-multiply and prioritize Note: Only a partial list of inputs We now start getting a feel for which variables are most important to explaining variation in the outputs

Bottle Production Example We have sorted on the cross-multiplied numbers and find that the input variables in the box above are the most important We can now evaluate the control plans for these input variables Note: Only a partial list of inputs

General Approach Place the outputs across the top of the matrix and rank Place inputs down the side of the matrix starting with the first process step and moving to the last This approach is okay for small process with relatively few steps Should only be used for processes with a relatively small number of steps and inputs

Focused Approach Phase I Phase II Place the outputs across the top of the matrix and rank Place the process steps down the side of the matrix Correlate process step to outputs Pareto the process steps Phase II Start a new C&E Matrix with the inputs from the top three or four process steps Recommended when first starting a project Focuses the efforts and gives the team a feeling that they’re working on the important process steps first Gives you a running start at the FMEA and preliminary Control Plan Analysis

Control Plan Evaluation Standard Operating Procedures Do they exist? Are they understood? Are they being followed? Are they current? Is operator certification performed? Is there a process audit schedule?

Control Plan Evaluation Controllable Input Variables: How are they monitored? How often are they verified? Are optimum target values and specifications known? How much variation is there around the target value? How consistent are they? Other Questions: How often is the input variable out of control? Which input variables should have control charts?