5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15, 2005 Safety Organization and Safety Measures for the Installation of.

Slides:



Advertisements
Similar presentations
ADMINISTRATION REVISION – BLOCK 2 HEALTH AND SAFETY.
Advertisements

Working at Height Learning Lite Module. Why do we need to understand the risks? In 2008/09 there were 35 fatalities, 4654 major injuries and a further.
1 The purpose is to prevent falls and reduce the consequences if a fall occurs when Working At Height. Use fall protection equipment when working outside.
Occupational safety and health is an area concerned with protecting the safety, health and welfare of people engaged in work or employment.
1 THAI TOKO ENGINEERING CO.,LTD. Safety management procedure.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
LHC Performance Workshop - Chamonix January 2010 Session 4 - Safety for Personnel Underground - He Evacuation What can the Safety Coordination.
RADIATION MONITORING OF SCRAP METAL: BELARUS’ PERSPECTIVE V. PIOTUKH LEADING STATE NUCLEAR AND RADIATION SAFETY INSPECTOR PROMATOMNADZOR BELARUS Group.
17 July 2002RSOC presentation G.D. 1 NEW SAFETY CODE A9 Origin –Revision of SAPOCO 42 document Main modifications: –Official name becomes SAFETY POLICY.
Business 21 Publishing © 2006 Fall Protection A user-friendly training module to help supervisors and workers:  Understand fall protection  Prevent injuries.
LHC HARDWARE COMMISSIONING SAFETY TRAINING DAY S. Claudet (AT-ACR-OP) With great help from G. Lindell (Safety commission) CRYOGENICS.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
Hansen – Managing Safely 1 The Construction (Health, Safety, and Welfare) Regulations 1996 Mark Mallen Health And Safety Manager Fenlock Hansen Ltd.
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
John Robert Etheridge, TS/HDO, Health and Safety Coordinator for the installation of the LHC and its Experiments Enviromental Health and Safety – managing.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
Induction Safety Course for ALICE Collaborators - Marc TAVLET / GLIMOS 1 Induction Safety Training for ALICE collaborators I.Basic safety, for any newcomer.
LHC Fire & Gas Detection Rui Nunes ST/AA/AS. Rui Nunes ST/AA/AS - STTC 21 Feb 2000 Project Goals Install in LHC –Fire Detection –Flammable Gas Detection.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
1. 2 Hazard Assessment 3 Your accident rates or injury rates will be reduced by being pro-active in Hazard Assessment.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
ATLAS Open Days Guides Safety Training. 1. Generalities: Name and phone number of the person responsible for the ATLAS visit point: Site manager: B. Di.
Managing the LHC Experimental Area Point 5, CMS: Martin Gastal (PH/CME) Point 1, ATLAS: François Butin (TS/LEA) Point 2, Alice: Sebastien Evrard (TS/LEA)
Dismantling LEP and the Experiments Access to the underground areas, project organisation, coordination and safety.
1/6 ALICE GLIMOS, Marc Tavlet Hazards and Safety in ALICE - Ways to reduce the risks Presentation at the ALICE Club, Monday, December 1 st, 2003 by Marc.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Working / walking on a roof
Review of Safety Systems for the LHC Experiments & Experimental Areas Emmanuel Tsesmelis / TS-LEA LEMIC 20 March 2007.
The new approach to the CERN Safety Policy and Safety Organisation A. Goehring-Crinon & R. Trant.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
Ferris State University & Michigan Department of Career Development 1 Hazard Assessment.
PH Department in context Safety Officers in PH Department
Safety Matters for External Contractors Work of 1st category –W.Weingarten TIS/GS STTC –29/5/2000.
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
1 BISMILLAH ELECTRICAL HAZARDS & CONTROL. 2 Why should you be concerned about electrical hazards?  Electricity has long been recognized as a serious.
M. Arnaud, C. Bedel, J. Etheridge, E. Paulat CERN SAFETY AND COORDINATION TEAM.
1 Safety and Database Subsection ADO - PO - SA Main safety projects / activities Main safety projects / activities RP issues RP issues Patrols Patrols.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
ADO-PO Section Meeting Safety Activities Sigi Wenig (LEXGLIMOS) 8 September 2015.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
International Technical Safety Forum CERN, Geneva, Switzerland, April 12-16, 2010 CERN Safety Coordination How it functions M. Arnaud, C. Bedel, J. Etheridge,
Health and Safety Coordination at CERN Environmental Health and Safety managing risks today for a safer tomorrow John Robert Etheridge, Emmanuel Paulat,
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Thomas Otto (TE Safety Officer)
Some arrangements for personnel safety 1- Procedures for access
Safety in the Neutrino Platform Hall
Safety Systems for ALICE
Equipment simplified model SMR UR safety
Safety in Construction and Upgrade Phases
Safety Issues (TF, June 15, 2005)
HSE rules & regulations
Health and safety organization on construction site
Safety rules for works supervisors
A very first look at siting issues
Falling while welding on the upper part of bridge worktable
Virginia Department of Labor Safety & Health Enforcement
Safety memo PPE - What I must remember
Presenter name Presenters title
Two Safety Requirements :
Presentation transcript:

5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15, 2005 Safety Organization and Safety Measures for the Installation of LHC Experiments at CERN Marc Tavlet, GLIMOS / ALICE CERN, Switzerland, Europe ☺

5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15, 2005 Safety Organization and Safety Measures for the Installation of LHC Experiments at CERN Outline:  Safety Organization  Safety Teams  Procedures for personnel (and visitors)  Procedures for the work  However, accidents do happen…  Conclusions ?

5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15,

5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15,

5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15, 2005 Safety Organization at CERN, according to SAPOCO/42  Safety responsibilities follow the managerial lines :  This scheme will be follow when the detectors are commissioned and the experiments are put into operation.  This scheme is valid outside LHC work- sites. Ex: Test beam areas. SAPOCO/42 = CERN’s law in mater of safety commission/sapoco42/index.html DG / CEO PH Dept Head Tech. Coord. / GLIMOS Project Leader Project Engineer Draftsmen, technicians, users…

5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15, 2005 Experimental Area Manager (EAM) = TSO Work-Package Eng. Work-Package Supervisors Workers, technicians, users… BUT, Safety Organisation for LHC Experiment Installations Technical Coordinator / GLIMOS Project Leaders Project Engineers Designers, technicians, users… Overall responsibility of the Experiment ( PH Department ) Installation under the responsibility of TS Department + RSO, FGSO + Safety Coordinator

5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15, 2005 Safety Team / Design  GLIMOS = Group Leader in Matter of Safety, accountable to the PH Department Head, responsible for the overall safety of the Expt.  FGSO = Flammable Gas Safety Officer  RSO = Radiation Safety Officer  INB link-person (French legislation / Nuclear Installations)  Safety Coordinators = professionals who help the Glimos, EAM and any supervisor + Experts of the Safety Commission

5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15, 2005  Use of halogen-free flame-retardant cables (IS-23)  Use of halogen-free flame-retardant materials (IS-41) Halogen-free Printed Circuit Boards wherever possible Avoid Polystyrene, Nylon… (PVC is forbidden !) Metallic pipes for cooling instead of plastic ones Silicone rubber to replace EPDM …  Non-flammable gas mixtures  Sniffer + N2 inertion systems  Safe switch-off of LV-PS in case of power failure  Grounding of all LV- and HV-PS  Fix ladders and platforms for better access Examples of Engineering Designs for better Safety in the Detector

5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15, 2005 Safety Team / Installation  GLIMOS = Group Leader in Matter of Safety  TSOs = Territorial Safety Officers  EAM = Experimental-Area Manager  Safety Coordinators = professionals who help the Glimos and the EAM + Team for First-Aid (in any building) + Fire-Fighters of the Safety Commission + Inspectors of the Safety Commission

5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15, 2005  Fire detection already operational  Escape routes identified  Priority to collective equipment vs personal ones  Enforce wearing personal protective equipment as well  Use scaffoldings (mounted by trained people) instead of ladders  Any platform higher than 80cm must have protection barriers + plinths  Adapted ladders and platforms to access ‘strange’ devices  … Examples of measures taken for better Safety during Installation

5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15, 2005 Procedure for Staff-Members  Safety Training for any new-comer + specific training on the spot by Glimos + supervisor + specific training according to activities (welding, lifting, work at height, …)  Access rights (for specific areas - ?)  Safety equipment - standard + specific

5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15, 2005 Rules for Visitors  Visitors must be accompanied by a trained guide  Max 12 visitors/guide on surface  Max 7 visitors/guide underground  Visitors must wear comfortable shoes + helmet  Specific training (incl. Safety) for guides  Dedicated visit circuits for guided tours

5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15, 2005 Procedure prior the start of work at experimental areas Safety Coordinator E.A.M. PPSPS V.I.C. W-P. A.M. W-P. Eng. initiates check A.O.C. ( + Fire Permit ) Glimos

5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15, 2005 Display of safety documents + procedure at the place of work

5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15, 2005 Review of Accidents during ALICE installation PlaceDeptEventVictimDamage SXL2PHMachining in the workshop (2 X)hands0 SXL2PHFall from a 80 cm platformbassin 0 SXL2 PHFall against a machinelip0 SXL2TS Break and fall of a hinge from a high doornohinge SX-2TSOverhead cranenomajor UX-25TSOverhead cranes (2 X)nominor UX-25PH+TS Break of a tie-rod of dipolenotie-rod UX-25PH+TSScaffolding into the dipolenoscaffolding

5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15, 2005  No precise written procedure; + Procedure not followed: - Modification of attachment point. + Modification of safety switches. - Crane hook went into crane frame. The overhead-crane accident:

5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15, 2005  Precise procedure was written; + Procedure exclude the use of the steel scaffolding  Staff ignored the interdiction.  Consequence  (fortunately, no one injured) The scaffolding accident:

5 th International High-Energy Physics Technical Safety Forum at SLAC. April 11-15, 2005 We do have  a safety plan, a safety team,  safety procedures for personnel,  safety training adapted to places and activities,  safety procedures, including safety visits for work. However, accident do happen ! Ways to reduce accident occurrence :  More supervision on the spot,  TALK to people (team spirit)  …any good idea ? Conclusions