AF2 and Wyffos for TO’s and duty engineers Michiel van der Hoeven October 2006 AF2 and Wyffos for TO's and Duty engineers.

Slides:



Advertisements
Similar presentations
This presentation is intended to assist you in troubleshooting basic problems that can occur with hardware and software. NOTE: This presentation contains.
Advertisements

GSMT Control Workshop Tucson, September 11-12, 2001 Pointing Control for a giant segmented mirror telescope Patrick Wallace Rutherford Appleton Laboratory.
Administrator Training Overview-D2
Engineering Roles We will be forming groups of 3 students
Graphic Symbol Location 1. DIN Terminal X52 The machine is powered by electricity using copper cable with 5 wires (3 phase wires + neutral wire +
Access to Site Even remote sites need some maintenance You don’t want to fly 2000 miles to replace a USB cable Make arrangements with a near by resident.
TCS3 Electronics Hazard Analysis and T3 Design. Sources of Hazards  Drive or feedback components: Motor, Amplifier, Tachometer, Encoder  Mechanical:
DarkRidgeObservatory.org1 Eclipsing Binary Star Program, Hardware and Software Thomas C. Smith Director, Dark Ridge Observatory.
Telemetry system datavend.
University of Colorado at Boulder – ECE Capstone – CDR – October 16, 2007.
Integrating a Short Range Laser Probe with a 6-DOF Vertical Robot Arm and a Rotary Table Theodor Borangiu Anamaria Dogar
Towards Creation of a JWST Astrometric Reference Field: Calibration of HST/ACS Absolute Scale and Rotation Roeland van der Marel Jay Anderson, Colin Cox,
Connecting VEX and ROBOTC
Darcy Bibb Oceanit Mentor: Tony Bartnicki Advisor: Curt Leonard Home Institution: Maui Community College Integration of a Small Telescope System for Space.
Coordinate Based Tracking System
1 Proctor Caching and TestNav Configuration. Role-Based Key 2 Role-Based Codes LEA Test Coordinator – School Test Coordinator – Test Administrator/Proctor.
Capturing the Motion of Ski Jumpers using Multiple Stationary Cameras Atle Nes Faculty of Informatics and e-Learning Trondheim University.
Remote Surveillance Vehicle Design Review By: Bill Burgdorf Tom Fisher Eleni Binopolus-Rumayor.
DATA BACK-UP ROUTER WEATHER STATION MOUNTCCDSERVICESMOUNTCCDSERVICESMOUNTCCDSERVICES 16 INCH 20 INCH DOME WIDE FIELD PRIMARY PC IMAGES WEATHER DATA.
Troubleshooting methods. Module contents  Avaya Wireless tools  Avaya Wireless Client Manager  Avaya Wireless AP Manager  Hardware indicators  Non.
SCADA and Telemetry Presented By:.
Robotics Science/ Technology Project Lesson 2. Hospital robots cut hospital pharmacy bill A robotic pharmacy has improved safety and saved money at a.
A COMPUTER is an electronic device. Every computer performs 4 general operations: 1. Input 2. Process 3. Output 4. Storage.
MCAO Laser Coordination and SALSA Jacques Sebag / Corinne Boyer.
AAO Fibre Instrument Data Simulator 10 October 2011 ROE Workshop 2011 Michael Goodwin Tony Farrell Gayandhi De Silva Scott Smedley Australian Astronomical.
MCAO Adaptive Optics Module Mechanical Design Eric James.
18/19 January 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 18/19 January 2003 OCIW, Pasadena,
Peter Gillingham, Stan Miziarski, and Urs Klauser (Anglo-Australian Observatory) Figure 1 View of OzPoz showing the front of the focal late in observig.
ROBO-course In association with SeAMK. What is the ROBO-course? It is a Course that teaches how to build and and program robot. The courses idea is to.
Overview The FMP Image Station combines a choice of a Trinocular or Monocular Microscope with high resolution digital video camera and one or two Micro.
LASER AND ADVANCES IN METROLOGY
IPD Technical Conference February 19 th 2008 Application: Juice Box Web Slitting Application – Monitor and Verify Crease to Knife Cut Edge Position. Distributor:
Content  1 Component  2 repair instruction  3 How to define problem  4 How to repair  5 How to disassemble  6 PC part  7 Button and Ports.
NIRSpec Operations Concept Michael Regan(STScI), Jeff Valenti (STScI) Wolfram Freduling(ECF), Harald Kuntschner(ECF), Robert Fosbury (ECF)
INSTRUMENTATION/ OID / L. Pasquini/ 1 ____________________________________________________________ FLAMES COORDINATION AND INTERFACES. FIELD CORRECTOR.
PFI Cobra/MC simulator Peter Mao. purpose develop algorithms for fiducial (FF) and science (SF) fiber identification under representative operating conditions.
SMT Control System Steward Observatory Faculty MeetingMay 02, 2003 A rizona R adio O bservatory Thomas W. Folkers.
My working experience Marco Villa Tue, 2 nd Dec 2008.
January 2008: Subaru Users' Meeting Current status of Subaru Telescope Summary –Some glitches are expected while leased computers are being replaced (February.
Company Confidential OVERVIEW. Application and activity control software for networked computer classrooms …. designed to be used by teachers in order.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
Guiding Control Subsystem (GCS) Overview
Magellan Telescopes Instrumentation: A Critical Assessment of Current Status.
Oct 24, 2006SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status On-telescope throughput analysis Ghost analysis Repair plan Status of other current.
Realtime Robotic Radiation Oncology Brian Murphy 4 th Electronic & Computer Engineering.
Module 13: Monitoring Resources and Performance. Overview Using Task Manager to Monitor System Performance Using Performance and Maintenance Tools to.
A Search For New Planets Matthew Livas Science, Discovery, and the Universe Computer Science Introduction My capstone was to observe.
1. LabVIEW and EPICS Workshop EPICS Collaboration Meeting Fall 2011.
High Availability Technologies for Tier2 Services June 16 th 2006 Tim Bell CERN IT/FIO/TSI.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
Mountaintop Software for the Dark Energy Camera Jon Thaler 1, T. Abbott 2, I. Karliner 1, T. Qian 1, K. Honscheid 3, W. Merritt 4, L. Buckley-Geer 4 1.
Oct 17, 2001SALT PFIS Preliminary Design Review Control System 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Preliminary Control.
Diagnostics and Optimization Procedures for Beamline Control at BESSY A. Balzer, P. Bischoff, R. Follath, D. Herrendörfer, G. Reichardt, P. Stange.
BLDC Motor Speed Control with RPM Display. Introduction BLDC Motor Speed Control with RPM Display  The main objective of this.
What you need: In order to use these programs you need a program that sends out OSC messages in TUIO format. There are a few options in programs that.
Drift alignment using PHD graphs Trevor Gerdes. Requirements 1.Auto-guidable telescope 2.Guidescope 3.Guide camera that is supported by PHD Guiding 4.Computer.
Software Troubleshooting Eliminate possible programming and timing errors by stopping all programs ( and ). Use the Executive program terminal and send.
NCSLI 2007 In House Capability of an Optical CMM Calibration for any Company Shawn Mason Boston Scientific.
NEW UPGRADE TO THE APS MAGNETIC FIELD INTEGRAL MEASUREMENT SYSTEM
Digital Light Sources First introduced in 2001.
VIVOTEK 2007 Product Roadmap
WEAVE Spectrograph.
Fundamental of Information Communication Technology (ICT)
IncuCyte Training Calibrations and Troubleshooting
Computer Numerical Control
INSTRUMENT CONTROLLER OVERVIEW
Basic Camera Function The camera converts an optical image into electrical signals that are reconverted by a television receiver into visible screen images.
Status of muon monitor R&D and construction
Echidna: current status and expected performance
Commissioning the European XFEL cryogenic system and best practice
Presentation transcript:

AF2 and Wyffos for TO’s and duty engineers Michiel van der Hoeven October 2006 AF2 and Wyffos for TO's and Duty engineers

Purpose of this presentation Give an update of current status Give an update of current status Make people more familiar with instrument Make people more familiar with instrument Reduce unnecessary downtime Reduce unnecessary downtime Make people aware of existing problems Make people aware of existing problems Learn how to fix and avoid problems Learn how to fix and avoid problems Gain information during observation on performance Gain information during observation on performance AF2 and Wyffos for TO's and Duty engineersMichiel van der Hoeven October 2006

History of instrument History of instrument Overview components Overview components Sequence of operations ‘How does it work’ Sequence of operations ‘How does it work’ Known problems Known problems Diagnostics Diagnostics Duty checks Duty checks AF2 and Wyffos for TO's and Duty engineersMichiel van der Hoeven October 2006

History of instrument Instrument build by Durham in 1992 Instrument build by Durham in 1992 Commisioned at WHT in 1994 Commisioned at WHT in 1994 Gripper unit redesign by ING in 1997 Gripper unit redesign by ING in 1997 Upgrade to smallfibres in 2001 Upgrade to smallfibres in 2001 UpgradeWyffos long camera 2004 UpgradeWyffos long camera 2004 Software upgrade operating system OS9 to Linux in 2005 Software upgrade operating system OS9 to Linux in 2005 AF2 and Wyffos for TO's and Duty engineersMichiel van der Hoeven October 2006

Overview AF2 and Wyffos for TO's and Duty engineersMichiel van der Hoeven October 2006 AG1 fiducial camera 10 fiducial fibres (10 metres) Wyffos cal unit

Overview of hardware components Robotic positioner AF2 Robotic positioner AF2 Fibre module Fibre module AG2 camera for fiducial fibres AG2 camera for fiducial fibres AG1 camera for acquisition AG1 camera for acquisition AF2pc’s AF2pc’s Power amplifier rack Power amplifier rack ICM 1900 rack ICM 1900 rack Wyffos spectrograph Wyffos calibration unit AF2 and Wyffos for TO's and Duty engineers Michiel van der Hoeven October 2006

Robotic positioner Linear slides for X-Y Linear slides for X-Y Servo motors with linear and rotary encoders Servo motors with linear and rotary encoders Brakes on X and Y slide Brakes on X and Y slide Mobile probe fitted to gripper unit Mobile probe fitted to gripper unit Off axis probe Used to measure geometric distortions in corrector Off axis probe Used to measure geometric distortions in correctorunit Y axis X axis Fixed probe AF2 and Wyffos for TO's and Duty engineersMichiel van der Hoeven October 2006

Gripper unit Z movement Z movement Theta movement Theta movement Pneumatic gripper operation Pneumatic gripper operation Tv viewing system (viewfibre) Tv viewing system (viewfibre) Mobile autoguider probe Mobile autoguider probe AF2 and Wyffos for TO's and Duty engineersMichiel van der Hoeven October 2006 Z motor Theta motor Tv viewing system Gripper jaws

Fibre module 150 science fibres 150 science fibres 93 micron in diameter 1.6 arc seconds on sky 10 ‘fiducial’ fibres 10 ‘fiducial’ fibres each bundle consists of fibres 5 micron each whole bundle 450 micron 8 arcseconds on sky 26 meter of science fibre fed to Wyffos 26 meter of science fibre fed to Wyffos 10 meter of fiducial fibre fed to AG tv camera at topring telescope 10 meter of fiducial fibre fed to AG tv camera at topring telescope AF2 and Wyffos for TO's and Duty engineersMichiel van der Hoeven October 2006 prism Sharksfin where robot picks up

AG2 tv camera for acquisition AG camera head fitted onto instrument AG camera head fitted onto instrument Camera fed by fibre connected to mobile probe Camera fed by fibre connected to mobile probe Fixed probe as well fed onto it for mapping Fixed probe as well fed onto it for mapping AF2 and Wyffos for TO's and Duty engineersMichiel van der Hoeven October 2006

AG1 tv camera for fiducial fibres Camera fitted on topring telescope Camera fitted on topring telescope Camera fed by 10m fiducial fibres Camera fed by 10m fiducial fibres Backillumination mechanism for fiducial fibres Backillumination mechanism for fiducial fibres Ultradas camera system Ultradas camera system AF2 and Wyffos for TO's and Duty engineersMichiel van der Hoeven October 2006 Ag camera Backillumination Fiducial fibres

AF2pc AF2 and Wyffos for TO's and Duty engineersMichiel van der Hoeven October 2006 Industrial PC Galil motion controller card Linux operating system Flashbus frame grabber card Two identical pc’s Two IP addresses Both machines on network

Michiel van der Hoeven October 2006 AF2 Electronics in Ghril AF2PC1 AF2PC2 Power amplifier rack Inter Connect Module ICM 1900 AF2 and Wyffos for TO's and Duty engineers

Michiel van der Hoeven October 2006 AF2 engineering display One Monitor/keyboard for 2 af2pc’s One Monitor/keyboard for 2 af2pc’s Omniview switch box Omniview switch box Omniview switch box 1: AF2PC1 2: AF2PC2 3: Epics Bootserver AF2 and Wyffos for TO's and Duty engineers

Wyffos spectrograph AF2 and Wyffos for TO's and Duty engineersMichiel van der Hoeven October 2006

Wyffos calbration unit AF2 and Wyffos for TO's and Duty engineersMichiel van der Hoeven October different lamps: -Tungsten -Neon -Helium Two filter slides

Computing Observers use AF2 Config program to produce their science fields with sky coordinates Observers use AF2 Config program to produce their science fields with sky coordinates This.CFG file is FTP to Taurus This.CFG file is FTP to Taurus Then with af2 setup (fieldname) the.FIB file is created which is send to the AF2PC Then with af2 setup (fieldname) the.FIB file is created which is send to the AF2PC The.FIB file contains the X-Y coordinates for fibre positions The.FIB file contains the X-Y coordinates for fibre positions AF2 and Wyffos for TO's and Duty engineersMichiel van der Hoeven October 2006

How does it work? Each fibre is placed on a star Each fibre is placed on a star The AF2pc knows all fibre positions from the previous setup field The AF2pc knows all fibre positions from the previous setup field On setting up a new field the gripper unit will move to each fibre to move it onto the next position. On setting up a new field the gripper unit will move to each fibre to move it onto the next position. The tv camera picks up at the fibre that is back illuminated The tv camera picks up at the fibre that is back illuminated After placing it will centroid again to confirm accuracy After placing it will centroid again to confirm accuracy Positioning accuracy less then 9 microns Positioning accuracy less then 9 microns AF2 and Wyffos for TO's and Duty engineersMichiel van der Hoeven October 2006

Wyffos AG1 Backillumination science fibres (Infrared LED array) Backillumination fiducials 3 red LED’s 26 metres science fibre 10 metre fiducial Science field. All fibre positions known in X, Y and Theta. With backillumination, position is confirmed and more accurate Fibre position X and Y confirmed with centroid by frame grabber card Gripper Fibre view system Fieldplate with 150 science and 10 fiducial fibres X Y Theta X Y Fibre view system

Known Problems Michiel van der Hoeven October 2006 AF2 and Wyffos for TO's and Duty engineers ProblemCauseSolution AF2 mimic blank AF2 server not running At whtics kill server and restart Lost fibre 1. Back illumination not on 2. No video signal 3. Frame grabber failure 1. Check both back illumination 2. Check Ghril monitor 3. Change to spare AF2PC AF2 not responding 1. AF2server not running 2. AF2PC needs reboot 3. AF2PC has a real fault 1. Restart AF2 server 2. Use shut account 3. Change to spare AF2PC

Diagnostics Diagnostic tools Diagnostic tools Whtics error messages Whtics error messages Epics engineering mimics Epics engineering mimics Video recorder Fibre Tv viewing system Video recorder Fibre Tv viewing system AF2 and Wyffos for TO's and Duty engineersMichiel van der Hoeven October 2006

Duty checks AF2 Robot AF2 Robot Check all fibres present af2 loadmodule Check all fibres present af2 loadmodule Make sure ADC is moving Make sure ADC is moving Wyffos Wyffos Check bias level Check bias level Take arc with calibration lamp Take arc with calibration lamp Move Hartman screen/ filters Move Hartman screen/ filters Make sure dry nitrogen is switched on Make sure dry nitrogen is switched on AF2 and Wyffos for TO's and Duty engineers

AG camera’s AG1 autoguider AG1 autoguider Switch Neon lamp on 1sec exposure Switch Neon lamp on 1sec exposure AG2 television Put robot in field to get some light falling on the fibre in the mobile probe Take one second exposure, fibre should be visible AF2 and Wyffos for TO's and Duty engineersMichiel van der Hoeven October 2006 Mobile probeFixed probe

Future upgrades Calibration source in blue part spectrum Calibration source in blue part spectrum Improve reliability Neon lamp Improve reliability Neon lamp CCD mount rotation micro metres CCD mount rotation micro metres Stand-down to do gripper maintenance and alignment. Implement dynamic temperature control system Stand-down to do gripper maintenance and alignment. Implement dynamic temperature control system Recoat Wyffos relay mirror Recoat Wyffos relay mirror AF2 and Wyffos for TO's and Duty engineersMichiel van der Hoeven October 2006

End For further information see: For further information see: AF2 and Wyffos for TO's and Duty engineersMichiel van der Hoeven October 2006