Richard O’Neill and Udi Helman Division of the Chief Economic Advisor,

Slides:



Advertisements
Similar presentations
Demand Response Commissioner Suedeen Kelly June 3, 2008.
Advertisements

MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007.
Future of OASIS II Conference Presented by Karl Tammar – NYISO For the ISO/RTO Council March 29, 2005 ISO/RTO Activities and Initiatives.
Market Architecture Robert Wilson Stanford University.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
Copyright 2003 PJM 1 PJM’s Annual FTR Auction.
Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
Highlights of the 2004 State of the Market Report New York Electricity Markets David B. Patton, Ph.D. Potomac Economics Independent Market Advisor May.
Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
Development Of A Common Platform For Electricity Trading CERC Public Hearing Presentation By POWERGRID 19-December-2006.
Topics The Midwest ISO The Midwest Market Market Design Process
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
The FERC SMD and the Midwest Electricity Markets
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
COMPETITIVE ELECTRICITY MARKETS March 15, PA Customer Choice Legislation  Distribution service remains regulated by PAPUC.  Transmission service.
1 WHOLESALE ELECTRICITY MARKET DESIGN AND STRUCTURE Massimo Parati Market Department Italian Regulatory Authority for Electricity and Gas Milan, March.
1 Design of New England’s Wholesale Electricity Market Peter Cramton and Robert Wilson November 22, 1998.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
For discussion purposes only Financial Transmission Rights: Design options Presentation to Electricity Commission 2 September 2009.
George A. Godding, Jr. Director, Management and Communications Office of Market Oversight and Investigations Comments are the speakers and do not necessarily.
WINDPOWER 2003 Austin, TX May 18-21, 2003 Session 4A: Regulatory Issues Monday May 19, :40-5:00 pm Wind Generation Interconnection to Transmission.
1 Market Evolution Program Regulatory Affairs Standing Committee Meeting September 11, 2003.
Joe Polidoro, Sr. Engineer PJM Interconnection, LLC Grid of the Future: Integrating Load Response into the Markets.
1 Capacity Markets Investment in Generation Capacity Payments October 31, 2005 J. W. Charlton.
Bulk Power Transmission System
California Independent System Operator A Comparison Between The CA ISO’s Market Design 2002 Proposal (MD02) and the FERC’s Standard Market Design (SMD)
Day Ahead Market Working Group April 14, Agenda Discussion of SMD-style DAM review questions posed by the DAM WG and Coral regarding the SMD-
1 Andrew L. Ott General Manager, Market Coordination PJM Interconnection, L. L. C. PJM Energy Market Model.
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
1 October 2003 Electricity Markets Regional Evolution Randy Berry
PJM © 2006 The Institute for Regulatory Policy Studies Illinois State University Conference May 12, 2006 Jeff Bladen PJM Interconnection.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
Your Competitive Edge In Energy. Designing Liquid, Transparent, Reliable Wholesale Markets Nigel Evans Executive Vice President Head of Global Energy.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
Working Paper on Standardized Transmission Services and Wholesale Electric Market Design Alice Fernandez, Derek Bandera, Connie Caldwell, Jignasa Gadani,
DAM Design Issues - Participants & Obligations May 12, 2003 Market Evolution Program.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
MISO Wisconsin Relationship Public Service Commission Randel Pilo, Assistant Administrator August 7, 2008.
Illinois Wholesale Market Update December 10, 2003.
Market Monitoring: The Role of OMOI and MMUs Presented to: Energy Markets at the Crossroads Springfield, Illinois December 12, 2002 By: Lisa L. Carter.
Texas Nodal Team Cost Benefit Group Background to Standard Market Design in New England March 2, 2004 Michael Taniwha Manager, Market Administration ISO.
Conference on Standard Market Design Issues Alice Fernandez, FERC Staff January 22-23, 2002.
Wholesale Electricity Spot Market (WESM)
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
Overview of Market Reforms and the WESM
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
1 Market Evolution Program Day Ahead Market Project Regulatory Affairs Standing Committee Meeting May 14, 2003.
1 A Conversation about MISO Paul Spicer November 8, 2007.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
Objectives and Strategies for ENA Power Groups Notes from the June 1, 2000 Wholesale Markets Meeting.
Wind Management at MISO
FERC Standard Market Design Working Papers
Asia-Pacific Energy Regulatory Forum
The New Texas Wholesale/Retail Market
Electricity Wholesale Markets: Designs for a low-carbon future
Presentation transcript:

FERC Policy Initiatives: Implications for Research In Electricity Markets Richard O’Neill and Udi Helman Division of the Chief Economic Advisor, Office of Markets, Tariffs and Rates Federal Energy Regulatory Commission richard.oneill@ferc.gov, udi.helman@ferc.gov Second NSF-EPRI Workshop on Power Systems Research, March 28, 2002 The views presented here do not necessarily reflect those of other FERC staff nor the Commission.

Major FERC Policy Areas in Electricity, 2002 RTO Development Standard Market Design (SMD) Market design Data/Software Electric Industry Standards Organization proposal Market Power Analysis Western investigation (Enron, et al.) Refinement of market power tests (e.g., Supply Margin Assessment) Standardization of market power monitoring and mitigation (under SMD)

Overview of FERC SMD Process Staff concept paper for discussion (Dec. 17, 2001) Working Paper on Standardized Transmission Service and Wholesale Electric Market Design (March 15, 2002) NOPR in mid-2002 For updates: www.ferc.gov/Electric/RTO/mrkt-strct-comments/rm01-12-comments.htm

SMD Principles Promote economic efficiency and maintain system reliability Voluntary participation Customer Choice/Flexibility Transparency of design Ease of participation (should not create biases toward certain market participants) Adaptability Mitigate market power

Research Implications: Approximate Level of Stakeholder Consensus on Current SMD Elements* Unit Commitment Service in DAM Virtual Bidding in DAM Regulation Markets Spinning Reserve Markets FGRs FTR Options ICAP Markets Locational Reserves Demand Curves for Reserves LMP for Congestion Mgt. FTR Obligations Voluntary Real- Time Market Voluntary Day-Ahead Market * My opinion!

Day-Ahead Energy Market: Working Paper Proposal Types of transactions: self-schedule, bilateral schedule or bid into unit commitment auction; no requirement for balanced schedules; supply and demand can bid Auction bid protocol: three-part financial bid (start-up, no load and incremental energy) with physical parameters (e.g., low and high operating levels, minimum run times, ramp rates) Auction financial settlement at locational marginal prices (LMP) that reflect congestion and losses

Day-Ahead Energy Markets: Some Design Issues Differences in unit commitment procedures (e.g., PJM vs. NY) Variations in rules for scheduling/ bidding and price determination Restrictions on bids for market power mitigation Daily (PJM) vs. hourly (NYISO) bids Financial only (virtual) bids

Real-Time Energy Markets: Working Paper Proposal Types of transactions: self-schedule, bilateral schedule or bid into dispatch auction Auction bid protocol: incremental energy with physical parameters (e.g., low and high operating levels, minimum run times, ramp rates) (Note: PJM uses three-part bids) Auction financial settlement at locational marginal prices (LMP) that reflect congestion and losses

Real-Time Energy Markets: Some Design Issues Intra-day unit commitment (e.g. NYISO BME, PJM does simplified UC periodically over the day) Trading deadline for bids day-ahead (e.g., PJM rebidding period) or hourly (NYISO) Scheduling flexibility in the hour for internal and external transactions Rules for uninstructed deviations from system operator instructions Differences in how software calculates real-time LMPs (ex ante vs. ex post, etc.)

Coordinating Congestion Management Between Systems Not yet explicitly discussed in SMD process, but may be incorporated in future Important because even large RTOs will have seams Particularly important if SMD boundaries do not coincide with RTO boundaries

Ancillary Service and Capacity Markets: Working Paper Proposal Bid-based markets should include at least regulation (AGC) and 10-minute spinning reserve Types of transactions: self-schedule, bilateral contract or bid into market; both generators and demand-side can offer reserves Bid protocol: energy bid plus availability bid SMD for longer-term forward reserves or capacity market left as open question

Operating Reserve Markets: Some Design Issues Whether reserve markets are both day-ahead and real-time Locational reserves (that require transmission reservations) Demand curves for reserves Option of bid-based, non-spinning reserve markets

Transmission Markets: Working Paper Proposal Congestion management based on LMP, both day-ahead and real-time No socialization of congestion costs Financial transmission rights offered both as point(s)-to-point(s) rights (e.g. FTRs) and flowgate (FGR) rights Options and obligations All transmission customers willing to pay congestion costs get firm physical service

Point-to-Point Transmission Rights Advantages and Disadvantages: + Fully hedge congestion costs + Defined independently of system topology and effects of network interactions + Can be specified between nodal aggregations, such as zones or hubs not easy to trade in secondary markets (require exact or close match of POI and POW) - Can only be reconfigured in centralized auction (monthly in PJM) ? Effect on transmission investment

Flow-Based Transmission Rights Advantages and Disadvantages: + May support more liquid secondary market in regions where there are few commercially significant flowgates -/? Number of active (binding) flowgates could be larger than anticipated - Active flowgates will change over time -/? Buyers/advocates may want uplift (subsidy) from market operator to improve (i.e., reduce imperfection of) flowgate rights hedge ? Effect on transmission investment

Working Paper: “Do Both” Both types of rights sold simultaneously in forward auctions and settled at day-ahead or real-time locational prices Adopt current auction rules for point-to-point rights (e.g., PJM, New York) Sell user-specified flow-based rights on all transmission elements (may need some restrictions); i.e., users decide which are commercially significant No subsidy for flow-based rights

Transmission Markets: Some Other Design Issues FTR options “Up-to” congestion bidding (PJM) Capacity reservations at seams (physical, financial?) Priority in event of curtailment

Market Monitoring and Market Power Mitigation: Working Paper Proposal Market monitor required to report common performance standards Mitigation triggers and measures may also be standardized

Market Monitoring and Market Power Mitigation: Some Design Issues Incorporation of some mitigation measures into SMD bid protocols (e.g., limits on changes in start-up bids; flexibility of physical parameters) “Demand proxy” bid cap Mitigation of generation resources frequently constrained on (e.g., in load pockets)

Integrating Software and SMD Standard data model Software modularity--“plug and play” Solving the large-scale unit commitment problem: Upper bound on size? Speed vs. accuracy of solution