GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review April 1 st, 2005 E-Logbook Release Alicia T. Kavelaars Online Engineer SLAC Gamma-ray Large Area Space Telescope
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 2 Agenda We will cover: –E-Logbook New Features –E-Logbook Fixed Problems –E-Logbook Documentation –E-Logbook V&V –Next release: Outstanding Issues –E-Logbook Website
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 3 E-Logbook New Features –All I&T requirements described in LAT-MD have been implemented. –New Logs: EGSE Log FSW Log Configuration Log –FHW. –FSW (added feature). –EGSE Validation (added feature). Configuration Request Log. –New design of Shift Log: faster, more user friendly. Activity Report (added feature). Error flag for runs (added feature).
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 4 E-Logbook New Features New Features: –New EGSE Log Added EGSE Type to take into account four types of EGSE: –SIMPLE, GASU, WORKSTATION, SERVER.
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 5 E-Logbook New Features New Features: –A N/A validation date can now be entered for those components which never need to be revalidated, for example software components.
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 6 E-Logbook New Features New Features: –FSW Log Following Requirements in LAT-MD-04601
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 7 E-Logbook New Features New Features: –Configuration Log Requirements in LAT-MD Requirements were for FHW, Implemented as well for FSW and EGSE. Snapshot of the System that shows current state of selected type of components. Nice feature: IF any of the EGSE components are expired or about to expire validation, a flag in the Main window is raised and the Configuration Log can be accessed to revalidate records.
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 8 E-Logbook New Features New Features: –Configuration Log vs. Component Report: The difference between the configuration log and the component report is: –The configuration log shows the LAST RECORD for ALL components any given time: it shows the current state of the system. –The Component Report shows ALL RECORDS for a given component: it shows the history of the component throughout the I&T effort.
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 9 E-Logbook New Features New Features: –Configuration Log vs. Component Report: ≠
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 10 E-Logbook New Features New Features: –Configuration Request Log Requirements in LAT-MD Lists all Configuration Log requests for either the FHW, FSW or the EGSE components. Accessible from the Main Window.
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 11 E-Logbook New Features New Features: –Shift Log New Activity Tables that are sort able, with copy and paste capability. New Activity Report If the runs have errors they will be red flagged.
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 12 E-Logbook New Features New Features: –Activity Report Shows ALL activities for a given Shift. Refreshes if a new Shift is selected. Accessible from the Shift Log window.
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 13 E-Logbook Fixed Problems Fixed Problems –Shift Log Shift Handover –Users are asked to choose to make an entry between selected shift or synchronized shift. Make sure Shifters sign in –If a user tries to make an entry on a shift he has not signed to, he/she will be prompted to do so. Fixed slowdown when browsing Shifts. Runs with errors are listed in red and with “/E” after event count. –EGSE Log: Improved design to take into account not only hardware EGSE (such as Test Stands, GASU Stands) but also software EGSE (such as Workstations and Servers).
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 14 E-Logbook Fixed Problems Fixed Problems (CONT.) –MMR Log: Can log materials that do not expire. –FHW Log: Improved design includes all info in one table instead of four. –Fixed JIRA Issues: Release Notes for E-Logbook 3.3.0
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 15 E-Logbook Documentation and V&V Documentation: –LAT-PS released. –E-Logbook Tutorial. –E-Logbook Website. V&V: –Full Test of E-Logbook on 03/30/05 passed. –Test Report for E-Logbook signed off by QA and I&T Manager.
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 16 Next E-Logbook Release Next Release: Outstanding Issues –Print Procedures for EGSE, FSW, Configuration Logs,… –Analysis tools. –User Questionnaire to receive feedback about E-Logbook. –New bug fixes/JIRA issues’ fixes.
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 17 E-Logbook Website –