SVACInstrument Analysis Meeting, October 21, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Advertisements

GLAST LAT Project Calibration and Analysis Meeting, 28 Nov 2005 E. Grove et al. 1 Proposed Flight Trigger Configuration: Engines and Scheduler Table J.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
SVACInstrument Analysis Meeting, October 7, 2005 Anders W. Borgland 1 CAL Calibrations And High Energy Muon Gain Anders W. Borgland Science Verification,
SVAC/ISOCInstrument Analysis Meeting, April 14, 2006 Anders W. Borgland 1 The LAT In Every Which Way You Want It! Anders W. Borgland Science Verification,
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
SVAC/ISOCInstrument Analysis Workshop, February 27, 2006 Anders W. Borgland 1 Overview Of LAT Data Taking Anders W. Borgland Science Verification, Analysis.
Gamma-ray Large Area Space Telescope SVAC ACD Variables Study (Montecarlo ) See also Francesco’s Talk Stefano Germani INFN Perugia Instrument Analysis.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
SVACInstrument Analysis Workshop, July 21-22, 2005 N.Giglietto 1 ToT saturated events: a preliminary study N.Giglietto-M. Brigida F.Giordano Science Verification,
SVAC/PVOC&A Meeting, February 6, 2006 Anders W. Borgland 1 Instrument Analysis Activities Anders W. Borgland Science Verification, Analysis and Calibrations.
SVACInstrument Analysis Meeting, August 5, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectOnline Roadmap Progress Report – April 22, 2004 R. Claus1 Online Roadmap to the July 2004 Freeze Progress report for April 22, 2004 (to.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
SVAC/ISOCInstrument Analysis Meeting, April 21, 2006 Anders W. Borgland 1 LAT Data taking! Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
1 May 27, 2005 Comparison tower A data and Montecarlo OVERVIEW Comparison of MC (EM- v 4r060302p18 ) and tower A data using the “baseline” run (Run )
GLAST LAT Project Managers F2F 5/11/ Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test.
GLAST LAT ProjectDOE/NASA CD3-Critical Design Review, May 12, 2003 S. Ritz Document: LAT-PR Section 03 Science Requirements and Instrument Design.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
GLAST LAT Project Technical/Cost/Schedule Review 03/31/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
SVACInstrument Analysis Meeting, January 13, 2006 Anders W. Borgland 1 Data Is (Nearly) Here! Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project Instrument Analysis Workshop June 7, 2004 Anders W. Borgland 1/16 What? Where How? Description of the Geometry What? Where How? Description.
SVACInstrument Analysis Meeting, September 23, 2005 Anders W. Borgland 1 GEM Discarded Events Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Trending ACD performance Parameters of interest Online tests (CPTs) TCI (charge injection) -> PHA TCI -> Veto mapping Timing PHA Pedestals Offline tests.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
ISOC/SVACInstrument Analysis Meeting, Quatorze Juillet, 2006 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
Alex Moiseev NASA/GSFC 12/16/2005 Some ACD Calibration issues I.ACD mip peak monitoring 1. ACD mip peak monitoring requires the measurements to be done.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
SVACInstrument Analysis Workshop IV Quatorze Juillet, 2005 Anders W. Borgland 1 Overview of Data Taking Anders W. Borgland Science Verification, Analysis.
GLAST LAT Project IA meeting, 21 April 2006 David Smith Bordeaux 1 Muons from Flight SoftWare (= “FSW”) See my WorkShopSix presentation to understand.
CalRecon Moments Analysis Studies I Tracy Usher1/17 A Brief History of Glast Release GR (Friday, July 15) –Effectively, the first DC-2 2M all-gamma.
Sep/26/05Trigger test plan Trigger ACD/LAT Test Plan Eric Grove, Martin Kocian, Su Dong.
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
Fermi Large Area Telescope (LAT) Integration and Test (I&T) Data Experience and Lessons Learned LSST Camera Workshop Brookhaven, March 2012 Tony Johnson.
Trigger Software Validation Olga Igonkina (U.Oregon), Ricardo Gonçalo (RHUL) TAPM Open Meeting – Mar. 1, 2007 Outline: Status of infrastructure Schedule.
GLAST Large Area Telescope:
TrigSim Status ● What is TrigSim? ● What version do I use? ● Web site ● Basic running ● Features of p ● Drawbacks of p ● Future plans 10/24/03.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois1 Schedule Balloon Science Tools, Analysis Platforms Calibrations Performance Tuning, Tracking Data Production.
X. Chen 1 GLAST LAT Project EM data analyses meeting X. Chen 1 Software infrastructure used in EM data analyses Xin Chen November 19, 2003.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
Background Rejection Prep Work
LAT Instrument Test Data Analysis in Context
EIDP Status. Solar Probe Plus FIELDS Main Electronics Package iPSR Management Apr 10, 2017.
GLAST Large Area Telescope Instrument Science Operations Center
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
Overview Goal Study GEM variables in SVAC ntuple
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope: I&T Test Readiness Review
Eduardo do Couto e Silva Feb 28, 2006
Overview Cost to Complete
Integration & Test Instrument Operations Coordination
SVAC Configuration Verification
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

SVACInstrument Analysis Meeting, October 21, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations

SVACInstrument Analysis Meeting, October 21, 2005 Anders W. Borgland 2 16 Towers In The Grid!!!!!! 16 towersWe now have 16 towers in the grid! testWill take a 1h muon test run early next week: –The instrument will not be calibrated –Mostly to test infrastructure and code –Will still be cool to see 16 tower muon data..... LAT data taking plans: –Two weeks with: –LAT CPT –Trigger timing in –SVAC (Calibration) runs: B2, B10, B13 –Starting November 9 Calibrated and reprocessed LAT data: –Early December Environment: –As before i.e. LATTE 4 Caution: –Schedule changes daily......

SVACInstrument Analysis Meeting, October 21, 2005 Anders W. Borgland 3 EngineeringModel Release Plan Currently trying to use the new CAL Recon: –EM based on GR v7 Then add: –Updates to CAL Trigger Alg: –Will keep TriggerAlg running on real data –Good event-by-event monitoring tool of the GEM: »For 'normal' triggers (no direct deposit in diodes etc) –New ACD stuff from Eric: –Extrapolation of tracks to ACD tiles: »Independently of any hit in the tiles –CalibGenACD: –Development going on right now –See Eric's talk

SVACInstrument Analysis Meeting, October 21, 2005 Anders W. Borgland 4 Today's HomeWork Write up what you already have done! –LAT DOC AM - Analysis Memo –We still only have one! Start thinking about what to do with the full LAT data Remember: –LAT muon data in late November –LAT muon data with FSW in January

SVACInstrument Analysis Meeting, October 21, 2005 Anders W. Borgland 5 Congratulations Dario and Sara! Newly Graduated!