Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha PALERMO 11/04/07.

Slides:



Advertisements
Similar presentations
XMM XMM-NEWTON TTD Meeting: 8 April OPS-OAX (J. Martin) Autocommanding J.Martin, XMM-Newton SOE.
Advertisements

XMM EPIC MOS Jenny Carter 4 th EPIC BG WG Meeting Mallorca, 25/10/06 BGWG blank sky data analysis Jenny Carter, University of Leicester.
WORK PLAN FOR THE EPIC CALIBRATION TEAM (AND BEYOND)
Epic-Cal 4 Feb 2003 Flux check Richard Saxton XMM-SOC/SSC Flux Comparisons.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting MPE
XMM-Newton 1 Michael Smith, ESAC PN Monitoring MPE, May 2006.
XMM EPIC MOS Steve Sembay ESAC 04/10/05 Implementation of the MOS spatial/temporal DRM: Does it work ? Zeta Puppis: Checking the line.
MPE, 4th of May 2006 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 4th of May 2006.
XMM EPIC MOS Andy Read 2 nd EPIC BG WG Meeting MPE, Germany 24/11/05-25/11/05.
Isabel Caballero, Anne Wellbrock Page 1 XMM-Newton ESAC XMM-Newton EPIC relative timing analysis Isabel Caballero Anne Wellbrock M.G.F. Kirsch.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Palermo, April 2007.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton EPIC SW Status Guillermo Buenadicha TOS/OFX, SOC Operations Support Group MPE, 4 th.
XMM-Newton 1 M.Stuhlinger/M.Smith, ESAC PN Monitoring Mallorca, November 2007.
Experience with combined Fe55/Vela SNR calibration - MOS Andrea Tiengo INAF, IASF-Milano In collaboration with: Mariachiara Rossetti (IASF-Milano) Martin.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Marcus G. F. Kirsch Mallorca, Summary status of the EPIC calibration.
XMM-Newton Status of EPIC Operations Guillermo Buenadicha & Pedro Calderón Mallorca 8-April-2008.
XMM-Newton 1 M.Stuhlinger, March 2010 Status of XMM-Newton cross-calibration using SASv10.0 Madrid, 24. March 2010.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton MOS Timing Mode calibration Marcus.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Calibration of the EPIC MOS Timing.
XMM-Newton 1 M.Stuhlinger/P.Calderon, ESAC Re-appearance of the MOS1 CCD1 meteorite column during revs Madrid, 23. March 2010.
XMM EPIC MOS Andy Read 5 th EPIC BG WG Meeting Palermo, Sicily 11/04/07 EPIC BG working group: 5th meeting 11/04/07 - Palermo =================================================================
XMM-Newton 1SCI-SA Status of MOS and PN Realtime Operations 1) Current Operations Status 2) Eclipse preparation improvements 3) Slew Exposures 4) Offset.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Results from the EPIC- Calibration-Workshop.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting April 8, 2008, Mallorca María Santos-Lleó (XMM-Newton Science Support Manager)
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton XMM Newton cross calibration M.G.F.
XMM 1 MOS2 CCD5 anomaly Status of the investigations.
I. de la Calle Astronomy Science Operations Division Science Operations Department Background Working Group Meeting, Mallorca – 30/03/2009 XMM-Newton ESAC.
Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Pedro Calderón Riaño Guillermo Buenadicha.
EPIC TTD#16 SCIENCE OPERATIONS MPE, 04 May 2006 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager 1 Science Operations & Data Systems Division Research.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Cross calibration PKS
Slews: Fast and Slow. Fast Slew Status  XMMSL1: catalogue of slew sources released May 2006 Revs , 5180 detections, 2692 Revs , 5180 detections,
XMM EPIC MOS Andy Read for the BGWG CAL/OPS/BG Meeting Palermo, Sicily 11-13/04/07 EPIC Background Working Group Summary: Meeting.
MPE EPIC Cal Meeting – May 2006 Darren Baskill: XMM project: MOS gain monitoring MOS.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, October 2006.
Martin Stuhlinger Mallorca, European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with SASv7.1 CAL Meeting.
Tony Abbey XMM Cal/Ops meeting – MPE, Garching – 5 May 2006 Tony Abbey – University of Leicester Reducing MOS data rate.
Mallorca, 1st of February 2005 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 1st of February 2005.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC XMM-Newton Instrument Anomaly Tool & Cross-Calibration Tool Marcus G. F. Kirsch.
XMM 1Michael Smith, ESAC EPIC PN Monitoring Provided by Michael Smith.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton EPIC SW Status Guillermo Buenadicha TOS/OFX, SOC Operations Support Group Palma de.
XMM EPIC MOS Andy Read 6 th EPIC BG WG Meeting Mallorca, Spain 05/11/07 Agenda:
Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.
Page 1 ACTIONS EPIC_10/1 on Munoz. EPIC_10/1 on Munoz. –Closed: MS delivered Slew Data Files  EPIC_10/2 on Smith: to verify whether PHS_tools checks for.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting Mallorca
XMM EPIC MOS Andy Read EPIC Calibration Meeting Saclay 24/09/03-25/09/03 Analysis of the X-ray PSF PSFs in the CCF MCG C273.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Energy calibration refinement of the EPIC-pn Burst mode M.G.F. Kirsch 1, E.
XMM Bruno Altieri -- SCI-SDX EPIC astrometry update EPIC CAL/OPS meeting Vilspa, March 2003 B. Altieri.
1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Ops. AGENDA Operations status and.
Martin Stuhlinger X-Ray Universe 2005, Sep.26-30, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
Column rejection in the MOS  The core of soft sources is removed by the standard emchain.  Due to very large fluctuations in count rate from one column.
XMM 1 EPIC MOS Monitoring. XMM-Newton 2 Martin Stuhlinger, ESAC MOS Bad Pixel Monitoring.
XMM EPIC MOS Steve Sembay Mallorca 02/02/05 Temporal and spatial variability of the MOS RMF 1.Introduction and brief history of the.
Guillermo Buenadicha / Neil Cheek SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha Neil Cheek MALLORCA 26/10/2006.
XMM EPIC MOS Andy Read EPIC CAL/OPS Meeting MPE, Germany 04-05/05/06 EPIC BGWG XMM-Newton EPIC BackGround Working Group founded (~1.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Long term EPIC in-orbit calibration plan Marcus G. F. Kirsch.
XMM-Newton EPIC OCB, 6-Nov-2007 EPIC OCB, 6-Nov XMM-Newton Future Instrument Operations Mallorca, 6 th -7 th November 2007 M. Casale, J.R. Muñoz.
RGS/MOS-cooling Results February 03, 2003 L. Metcalfe 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton.
XMM EPIC MOS Andy Read OPS/CAL/BG (OCB) Meeting Mallorca, Spain 05-07/11/07 Report from the BGWG (05/11/07) Andy Read, on behalf.
© Pearson Education Limited, Chapter 12 Physical Database Design – Step 3 (Translate Logical Design) Transparencies.
SAG+SASWG Meeting Potsdam /15 PN Tasks – Status Report (update since Leicester) Hermann Brunner - MPE  epframes:  The dark quadrant problem.
Discovery of ABSORPTION LINES in Low Mass X-ray Binaries: MXB and GX13+1 L. Sidoli (IASF, Milano) A.N. Parmar T. Oosterbroek D. Lumb & C. Erd.
L/O/G/O Input Output Chapter 4 CS.216 Computer Architecture and Organization.
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, April 2008.
Date of download: 6/2/2016 Copyright © 2016 SPIE. All rights reserved. View of the XMM-Newton spacecraft subsystems, with external shrouds and structure.
Maximo Upgrade Information Session
EPIC Calibration & Operations Meeting
Tony Abbey – University of Leicester
Lecture 3: Main Memory.
Presentation transcript:

Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha PALERMO 11/04/07

Guillermo Buenadicha SOC Operations Support Group Page 2 XMM-Newton PN Activities Several observations in different modes with Lower Thresholds executed. Some special observations regarding noisy column 64 in CCD-11 NRCO-57 on PKS (Offset map in SW, followed by several FW changes) In general, smooth operations. X-training to Jim Martin (MOC) New BP tables pending implementation (next DB in May)

Guillermo Buenadicha SOC Operations Support Group Page 3 XMM-Newton MOS Activities Further 3x3 testing to prepare pointed observations. Real target in May. Cross effect of central CCD clocking on peripheral analysis. CCD-6 health (!!!) check. Guess what… Nothing different from past runs ;-(, typical AFFA (Tony???) value New ED defined for future CCD-6 analysis. X-training to Andrea Guidi (MOC) Pending new Offset Maps, DB in May

Guillermo Buenadicha SOC Operations Support Group Page 4 XMM-Newton Others Eclipse season OK. Double Moon-Earth eclipse on rev Several periods w/o RGS operations Thermal impact RGS vs. PN, some analysis on feasibility to further test. Not much chance. Possible further work on MOS 3x3 (fine tuned Offset Maps, DB Activities) Any operation linked to future Instrument automated operations (many new DB items). 50% of my time now into XMM, rest in PLANCK PSO Integration and Testing.