GOES-14 PLT Weekly Report Fangfang Yu Gordana Rancic 12/31/2009.

Slides:



Advertisements
Similar presentations
Evaluating Calibration of MODIS Thermal Emissive Bands Using Infrared Atmospheric Sounding Interferometer Measurements Yonghong Li a, Aisheng Wu a, Xiaoxiong.
Advertisements

Preliminary Study of Lunar Calibration for Geostationary Imagers Japanese Multi-functional Transport SATellite-2 (MTSAT-2) incorporates the special device.
Volcanic ash and aerosol detection versus dust detection using GOES and MODIS imagery Bernadette Connell Cooperative Institute for Research in the Atmosphere.
Validation of SCIAMACHY using POLDER as a reference 25 April 2006.
Development of a Simulated Synthetic Natural Color ABI Product for GOES-R AQPG Hai Zhang UMBC 1/12/2012 GOES-R AQPG workshop.
1 Weekly Report on GOES-14 PLT Science Test NOAA / NESDIS / STAR X. Wu, G. Rancic, F. Yu December 18, 2009.
Red: Flooding, during a 10-day accumulation of MODIS imaging, ending on date shown. Light Red: Previously flooded this year, now dry. Light Blue: Flooded.
1 Weekly Report on GOES-14 PLT Science Test NOAA / NESDIS / STAR X. Wu, G. Rancic, F. Yu, M. Grotenhuis December 14, 2009.
NOAA Research and Operations Marine Optical Buoy Design Review July 18-19, 2006 Plan for calibration and maintenance of AHAB Uncertainty Budget: Laboratory.
A Combined Vicarious Calibration Method for GOES Imager Visible Channel Fangfang Yu 1* and Xiangqian Wu 2 1 ERT, NOAA/NESDIS Center for Satellite.
Accuracy: The closeness of a measurement to the true or actual value
WHITE REFLECTANCE STANDARD SOL MARIE CRUZ RIVERA September 19,2006 INEL6088.
1 GOES-R AWG Product Validation Tool Development Snow Cover Team Thomas Painter UCAR Andrew Rost, Kelley Eicher, Chris Bovitz NOHRSC.
1 GOES-R AWG Product Validation Tool Development Snow Cover Team Thomas Painter UCAR Andrew Rost, Kelley Eicher, Chris Bovitz NOHRSC.
MOLLY E. BROWN, PHD NASA GODDARD GIMMS Group Challenges of AVHRR Vegetation Data for Real Time Applications.
Date of download: 5/29/2016 Copyright © 2016 SPIE. All rights reserved. Dome C, MODIS/AVHRR TOA reflectance time series for (a) band 1, (b) band 2, (c)
Date of download: 6/23/2016 Copyright © 2016 SPIE. All rights reserved. Time variations of rainy cells: (a) single cloud, (b) aggregation of several cells.
Date of download: 6/24/2016 Copyright © 2016 SPIE. All rights reserved. Study area of Colorado Plateau with black dots for SNOTEL locations and digital.
Colours Learning Objectives:
Bias analysis and correction for MetOp/AVHRR IR channel using AVHRR-IASI inter-comparison Tiejun Chang and Xiangqian Wu GSICS Joint Research and data Working.
Thomas C. Stone U.S. Geological Survey, Flagstaff, AZ USA GSICS Research Working Group Meeting EUMETSAT 24−28 March 2014 Using the Moon as a Radiometric.
PLEIADES Lunar Observations Sophie Lachérade, Bertrand Fougnie
PATMOS-x Reflectance Calibration and Reflectance Time-Series
VIS/NIR reference instrument requirements
Seung-Hee Ham and B.J. Sohn Seoul National University, Korea
JMA lunar calibration report [MTSAT-2 and GMS-5]
Extending DCC to other bands and DCC ray-matching
Fangfang Yu and Xiangqian Wu
Fangfang Yu and Xiangqian Wu
Fangfang Yu, Xiangqian Wu and Tom Stone
Doelling, Wagner 2015 GSICS annual meeting, New Delhi March 20, 2015
JMA’s GSICS and SCOPE-CM activities Presented to CGMS-43 Working Group II session, agenda item 3 (from MTSAT-2) Japan Meteorological Agency.
Using Sun Glint and Antarctic Ice Sheets to Calibrate MODIS and AVHRR Observations of Reflected Sunlight William R. Tahnk and James A. Coakley, Jr Cooperative.
An Overview of MODIS Reflective Solar Bands Calibration and Performance Jack Xiong NASA / GSFC GRWG Web Meeting on Reference Instruments and Their Traceability.
Aqua MODIS Reflective Solar Bands (RSB)
GOES-East DCC analysis
GOES Lunar Calibration
Fangfang Yu and Fred Wu 22 March 2011
Combining Vicarious Calibrations
MODIS Characterization and Support Team Presented By Truman Wilson
GOES Imager IR Midnight Calibration Anomaly and Correction
Characterizing DCC as invariant calibration target
A Strategy for the Inter-Calibration of Solar Channels within GSICS
Two-Dimensional Signal and Image Processing Chapter 8 - pictures
Estimating MTF post-launch using lunar imagery – the case of SEVIRI
Effort toward Characterization of Selected Lunar Sites for the Radiometric Calibration of Solar Reflective Bands Fangfang Yu1, Xi Shao1, Xiangqian Wu2.
Diurnal and Seasonal variations of COMS IR inter-calibration
Red: Flooding, during a 10-day accumulation
Implementation of DCC at JMA and comparison with RTM
GOES Imager Lunar Calibration: Angular Variation of the Scan Mirror Visible Reflectivity Fangfang Yu (ERT, Xiangqian Wu(NOAA/NESDIS), Tom Stone(USGS),
PATMOS-x AVHRR Solar Reflectance Calibration Update
Lu Zhang, Peng Zhang , Xiuqing Hu, Na Xu, Lin Chen,Ronghua Wu
Red: Flooding, during a 10-day accumulation
YouTube Channels: Launch Day Video Views Vs. Subscriber Base
Volume 154, Issue 5, Pages (April 2018)
TanSat/CAPI Calibration and validation
Red: Flooding, during a 10-day accumulation
Red: Flooding, during a 10-day accumulation
Red: Flooding, during a 10-day accumulation
GOES DCC Deseasonalization & AHI DCC Calibration
Lunar calibration of COMS visible channel using GIRO
Use of GSICS to Improve Operational Radiometric Calibration
Volume 107, Issue 6, Pages (September 2014)
Red: Flooding, during a 10-day accumulation
A Strategy for the Inter-Calibration of Solar Channels within GSICS
goes-16/17 abi lunar calibration
Inter-calibrating polar imagers using SEVIRI as a transfer instrument
G16 ABI B07 Cold Scene Bias to IASI - Action: GIR j
G16 vs. G17 IR Inter-comparison: Some Experiences and Lessons from validation toward GEO-GEO Inter-calibration Fangfang Yu, Xiangqian Wu, Hyelim Yoo and.
The Image The pixels in the image The mask The resulting image 255 X
Presentation transcript:

GOES-14 PLT Weekly Report Fangfang Yu Gordana Rancic 12/31/2009

GOES-14 Imager Visible Channel: Initial Post- launch Calibration 1. Purpose provide the initial post-launch operational calibration coefficients 2. Data GOES-14 Imager visible and Terra MODIS collocation data on 12/23/ Method Wu, X and F. Sun (2005). Post-launch calibration of GOES Imager visible channel using MODIS, SPIE, Vol. 5882, doi:1117/

GOES-14 Imager Visible Channel: Initial Post- launch Calibration Figure. Upper: the accumulated histograms of GOES-MODIS collocated cloud pixels (R > 15%) (black: post-launch cal. GOES data, red: MODIS estimated GOES data, and blue: pre-launch GOES data). Lower: percentages of mismatched cloud pixels at various slope correction The correction factor is the slope correction with lowest mis- matched GOES-MODIS reflectance histogram in the red line data range.

GOES-14 Imager Visible Channel: Initial Post- launch Calibration Results: R post = R pre * C 1 R post and R pre are the post-launch and pre-launch calibration reflectance/radiance; C 1 = is the correction factor. Also available at e/GOES_Imager_Vis_OpCal.php#g14_init_postlaunch e/GOES_Imager_Vis_OpCal.php#g14_init_postlaunch This result is consistent with initial post-launch calibration for GOES-12/13 (C 1 = 1.08/1.12) but is barely in agreement with lunar calibration result for GOES-14 (C 1 = 0.99).