Throughput and Emissivity for Alternatives to the Baseline AO Layout Don Gavel NGAO Telecon January 28, 2009.

Slides:



Advertisements
Similar presentations
CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
Advertisements

1 ATST Imager and Slit Viewer Optics Ming Liang. 2 Optical layout of the telescope, relay optics, beam reducer and imager. Optical Layouts.
A Stress Analysis of Sputter Coating on the LSST Primary-Tertiary Mirror Substrate temperature and strain during sputter deposition of aluminum on cast.
NGAO Calibration/Simulation Source T. Stalcup, M. Pollard.
DESpec spectrographs Jennifer Marshall Darren DePoy Texas A&M University.
DESpec spectrographs Jennifer Marshall Darren DePoy Texas A&M University.
LBT AO Progress Meeting, Arcetri Walter Seifert (ZAH, LSW) The LBT AO System and LUCIFER 1.Requirements for the commissioning of LUCIFER:
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
Thermal Infrared Observation using Adaptive Secondary Mirror (ASM) Hiroshi TERADA (Subaru Telescope)  Ground-based Thermal IR w/AO  Subaru Thermal IR.
Example: Ray-tracing Evaluation Clerestory Mirror Designs By: Gregers Reimann 20 September 2005.
Trade Study Report: Fixed vs. Variable LGS Asterism V. Velur Caltech Optical Observatories Pasadena, CA V. Velur Caltech Optical Observatories Pasadena,
LBT AGW units Design Review Mar.2001 General Concept Performance specifications and goals The off-axis unit The mechanical support structure The control.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
Impact of Cost Savings Ideas on NGAO Instrumentation December 19, 2008 Sean Adkins.
Aug-Nov, 2008 IAG/USP (Keith Taylor) ‏ Instrumentation Concepts Ground-based Optical Telescopes Keith Taylor (IAG/USP) Aug-Nov, 2008 Aug-Sep, 2008 IAG-USP.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
NIR LOWFS for Keck and TMT Roger Smith & David Hale.
NGAO 1-tier Draft Optical Relay Design P. Wizinowich 12/7/07.
LGS WFS Design Status & Issues Dekany, Delacroix, & Velur Caltech Optical Observatories.
Object selection ideas for NGAO NGAO Meeting #6 Anna Moore April 26, 2007.
Keck Next Generation Adaptive Optics Team Meeting 6 1 Optical Relay and Field Rotation (WBS , ) Brian Bauman April 26, 2007.
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
Don Gavel: Keck NGAO meeting April 25, Some Comments on NGAO System Design and Specification Donald Gavel NGAO Team Meeting 6 April 25, 2007.
LO WFS Summit 6/19/2015Richard Dekany A Joint Meeting of the NGAO, IRIS, and K1 LO WFS Teams 12/15/2009.
Keck Interferometer Support Trade Study Christopher Neyman Junichi Meguro W. M. Keck Observatory Viswa Velur Caltech Keck NGAO Team Meeting #5 March 7,
AO opto-mechanical design architectures Cost Impact Don Gavel NGAO Team Meeting #5 February 5, 2009.
WFS Preliminary design phase report I V. Velur, J. Bell, A. Moore, C. Neyman Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
2-Tier Layout (RK 11/20/07). 1-Tier Layout (RK 11/26/07)
NGAO Instrumentation Cost Drivers and Cost Savings September 2008 Sean Adkins.
LGS wavefront sensor : Type and number of sub-apertures NGAO Team Meeting #4 V. Velur Caltech Optical Observatories 01/22/2007.
NGAO 1-tier Draft Optical Relay Design P. Wizinowich 12/3/07.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
Agenda (Fri., June 7) 8:00AO UI Demonstration 9:00Introductions to AO team 9:05AOWG Chair Selection 9:15Review Agenda (make changes?) 9:20Review Planned.
The Future of AO at Keck Sept 2004 Mike Brown, for the AOWG and Keck AO team.
NGAO Team Meeting Management Peter Wizinowich March 19, 2009.
NGAO Meeting #5 Introduction NGAO Meeting #5 Peter Wizinowich March 7, 2007.
1 NGAO Science Instrument Reuse Part 1: NIRC2 NGAO IWG December 12, 2006.
WMKO Next Generation Adaptive Optics: AO System Design Impact of Cost Savings Ideas Don Gavel December 19, 2008.
NGAO NGS WFS design review Caltech Optical Observatories 1 st April NGAO WFS design, Caltech Optical Observatories.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
AO Opto-mechanical System Design Status, Issues, and Plans Don Gavel UCO/Lick Observatory (for the opto-mechanical design team) Keck NGAO Team Meeting.
Build to Cost Meeting: Major NGAO system cost savings ideas Don Gavel NGAO Team Meeting September 11-12, 2008.
What Requirements Drive NGAO Cost? Richard Dekany NGAO Team Meeting September 11-12, 2008.
NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson.
Solar thermal energy Eng. Elamir Ahmed. Definition of solar thermal energy  Solar thermal energy is a renewable energy source.  Solar thermal uses technology.
Adriana Galue Wolfgang Custom Finishes HOME ENERGY STATS Biggest energy consumers Space heating – 34% Appliances and lighting – 34% Refrigerator.
Filter Set Selection. It is best to follow this presentation with a Fluorophore excitation/emission maxima chart to hand.
MCAO Adaptive Optics Module Mechanical Design Eric James.
MCAO Adaptive Optics Module Subsystem Optical Designs R.A.Buchroeder.
A visible-light AO system for the 4.2 m SOAR telescope A. Tokovinin, B. Gregory, H. E. Schwarz, V. Terebizh, S. Thomas.
Brewer Ozone Spectrophotometer Pointing and Levelling C.T. McElroy York University Canada.
“Twinkle, Twinkle Little Star”: An Introduction to Adaptive Optics Mt. Hamilton Visitor’s Night July 28, 2001.
DL – IFU (Prieto/Taylor) Slicer: –25mas sampling … 0.9mm slices ~f/250 (assuming no anamorphism) Detector = 2k array of 18um pixels –Slit subtends 1-pixel.
Sphere Standards and Standard Spheres Dr. Richard Young Optronic Laboratories, Inc.
Progress Report Geo-CAPE Coastal Ecosystem Dynamics Imager (CEDI) IRAD Repackaging Study Jason Budinoff / GSFC Cathy Marx / GSFC May 12, 2011.
DRM1 design description SDT 5/17/12 1. WFIRST DRM candidate design summary At SDT6 2/2-3/2012 consensus for full-up mission, aka “DRM1” was: 1.3m aperture,
Technology Development for ELTs Doug Simons GSMT SWG April 28, 2003.
V. Sonnenschein, I. D. Moore, M. Reponen, S. Rothe, K.Wendt.
Wind Lidar Working Group, 29 June 2005 Welches, OR Doppler Lidar Scanning Telescope Technology Geary Schwemmer Meeting of the Working Group on Space-based.
Na Laser Guide Stars for CELT CfAO Workshop on Laser Guide Stars 99/12/07 Rich Dekany.
ME 556 Solar Energy Conversion Lecture 9. Radiative Properties: Selective Surfaces & Transparent Materials.
Robo-AO Overview: System, capabilities, performance Christoph Baranec (PI)
Throughput and emissivity performance budgets Antonin Bouchez NGAO Team Meeting #5 March 7, 2007.
Mars Sextant PDR Opti 523 Paul Ward-Dolkas.
Science Priorities and Implications of Potential Cost Savings Ideas
NGAO System Design Project Plans and Schedule
IRMOS / MOAO Architecture Options
Trade Study Report: Fixed vs. Variable LGS Asterism
NGAO Trade Study GLAO for non-NGAO instruments
Presentation transcript:

Throughput and Emissivity for Alternatives to the Baseline AO Layout Don Gavel NGAO Telecon January 28, 2009

Baseline vs Alternative Baseline is to “cool” the AO system: place the AO fore-optics at -10 degrees C to reduce emissivity (FR-14 says -20 deg C), and a cascaded woofer/tweeter relay architecture –Requires an input window (double pane: 4 surfaces, two of them warm) –Cascaded AO relay has upwards of 10+ surfaces prior to science instrument window Cost saving alternative: can we get away without refrigeration if we: –Replace K-mirror with multiple vertical rotators –Single relay with one high order high stroke DM (~4 high quality reflections) ahead of instrument window Could this meet <30% unattenuated (sky+tel) spec? (from ScRD KAON 455) 2

Tools & Assumptions Throughput and Emissivity Spreadsheet Sky data from A.Bouchez’s programs (KAON 501) Coatings data gathered from various sources –HGNa: Lick “Holy-Grail” - enhanced at 589 nm –Gold for IR only reflectors –Assume “Perfect” Na and IR/Vis dichroics (absent specific designs) –Easy to add or modify coating data in T&E Spreadsheet Window needed on input to AO chamber if cooled, or on the MEMS in non-environmentally protected chamber –Infrasil or CaF will pass full band –Coating on this window, AR from nm, is not a standard catalog item. We need to talk to coating vendors about it. –No-coating Fresnel loss is 4% per surface –Assume for now: loss is 1% per surface (conservative?) –Front window of double-pane is warm on both sides Assumes DM is mounted on the fast tip/tilt platform 3

Options 4 Baseline Option 1 –No cooling, No K mirror –Cascaded relay –Fold mirror to vertical instrument Option 2 –No cooling, No K mirror –Single relay –Fold mirror to vertical instrument

Performance Results 5

Performance at Tcold = -20 C 6

Performance Comparison Conclusions Just counting AO surfaces (into, say, narrow field instrument) the option 2 design has the lowest emissivity and highest throughput Counting 6 gold surfaces in pickoff mirrors + DMs into off-axis arm of a dIFS, the baseline design has the lowest emissivity The baseline design meets the < 30% of Sky+Telescope requirement at all wavelengths shortward of 2 microns No option meets spec at 2.1 microns and longer (all are > 40% of Sky+Telescope) (baseline -20 C meets it at 2.2 um) The option 2 design has 10% more throughput (97% vs 87%) at the 589nm laser line 7

8 Cost Comparison Rotating instrument instead of using a K mirror –Rotation bearings and wraps ~$100K-$200K- more than K mirror –Extra flexure mitigation (for side-looking instrument) Savings of no refrigerator: –No compressor, coolant, plumbing, insulation ~$20K –No front window or window coating ~$40K Extra cost of DM –Xinetics DM? $1M vs $300K woofer + $400K MEMS tweeter Gained 10% of the laser return. Equivalent to about 7Wx$73K/W =~$500K savings – but this conclusion is very sensitive to assumptions about the window coating –Achieved by derotating after the LGS pickoff. Could we put the K-mirror after the 1 st relay instead? Cost Conclusion –For vertical instrument barrels: probably a wash in performance and a wash in cost. –Or, could pay more (flexure compensation) with side-barrel instrument and get ~10% better fraction of Sky+Telescope emissivity at = microns wavelength range and very little difference shortward. Recommendation is to stay with the baseline design