CEE 495.001 – Spring 2005 Lectures 10 to 11 (Chapters 21, 22) Analysis of Signalized Intersections.

Slides:



Advertisements
Similar presentations
Hcm 2010: roundabouts praveen edara, ph.d., p.e., PTOE
Advertisements

Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
INTRODUCTION TO TRANSPORT Lecture 7 Introduction to Transport Lecture 7: Signal Coordination.
CE 2710: Transportation Engineering Traffic Signals April 3, 2009 Nicholas Lownes, Ph.D.
Continuous Flow Intersection March, Why are we here? Discuss Continuous Flow Intersection compared to Standard Intersection Update permit status.
Transportation Engineering
INTRODUCTION TO TRANSPORT Lecture 3 Introduction to Transport Lecture 4: Traffic Signal.
Chapter 21: Fundamentals of Signal Timing and Design: Pretimed Signals
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Chapter 221 Chapter 22: Fundamentals of Signal Timing: Actuated Signals Explain terms related to actuated signals Explain why and where actuated signals.
Lecture #12 Arterial Design and LOS Analysis. Objectives  Understand the factors in arterial design Understand how arterial LOS is determined.
REVISION. Sample Question The sample questions for this year. Describe briefly the classic transport model, explaining the four stages of the model. [10]
INTRODUCTION TO TRANSPORT Lecture 4 Introduction to Transport Lecture 4: Signal Timing.
CTC-340 Signals - Basics. Terms & Definitions (review) Cycle - Cycle Length - Interval -. change interval - clearance interval- change + clearance = Yi.
Basic Principles of Intersection Signalisation
Lecture #6 Chapter 16: Principles of Intersection Signalization.
Unsignalized Intersections CTC-340. Hmwk At end of powerpoint.
Lec 15, Ch.8, pp : Signal Timing (Objective)
Introduction to Transport
PASSER II SOFTWARE.
Signals. Laneage Coding Examples.
Lec 19, Ch.17, pp : Sample simple timing problems (Objectives) Master the steps of simple signal timing through 4 sample problems in the textbook.
CE 7670: Advanced Traffic Signal Systems
Highway Capacity Software (HCS) – Part II
Highway Capacity Software Based on the Highway Capacity Manual (HCM) Special Report 209 Transportation Research Board (TRB), National Research Council.
Analyses of Unsignalized Intersections
Lec 20, Ch.18, pp : Analysis of signalized intersections, HCM (Objectives) Understand the conceptual framework for the HCM 2000 method Understand.
Signal Timing Design Example Problems. Intersection of Michigan Avenue and Hewitt Road.
Chapter 17: Basic principles of intersection signalization (objectives) Chapter objectives: By the end of this chapter the student will be able to: Explain.
CEE – Spring 2005 Lectures 16, 17 (Handouts, Chapter 24) Signal Timing and Coordination.
Lecture #11 Signal Coordination: Chapter 22. Objectives Factors affecting coordination Basic theory of signal coordination Application to arterial progression.
Lec 22, Ch.18, pp : Capacity & LOS (Objectives) Understand how critical lane groups and the sum of critical lane v/s rations are determined Learn.
Signalized Intersections
Transportation Engineering
Transportation Engineering
Transportation Engineering
Signalized Intersection Delay Monitoring for Signal Retiming SafeTrip-21 Safe and Efficient Travel through Innovation and Partnership in the 21 st Century.
Intersection Control/ Signal Timing for Different Color Indications
CEE 320 Fall 2008 Course Logistics HW7 due today (9 total) Midterm next Friday (Wednesday review) Signalized Intersections (Chapter 7 of text) Last material.
Roundabout Capacity Analysis Framework Presented By: Dave Stanek & Joel Rabinovitz Fehr & Peers Presented By: Dave Stanek & Joel Rabinovitz Fehr & Peers.
Chapter 21. Analysis of Signalized Intersections
Alternative Solution ONE Changes Phases from 4 to 6 based on the traffic demand of different movements; Optimizes Timing accordingly to minimize the overall.
Detailed Intersection Modelling Based on Analysis of the Interaction of Conflicting Traffic Movements Edwin Hull, Billy Kwok September 2011.
Chapter 20: Actuated Signal Control and Detection
Signal Warrants. Slide 2 Signal Warrants  r2/part4/part4c.htm r2/part4/part4c.htm.
Incorporating Traffic Operations into Demand Forecasting Model Daniel Ghile, Stephen Gardner 22 nd international EMME Users’ Conference, Portland September.
Introduction to Transport
Traffic Signal Timing Design Part I. Slide 2 Steps in Designing a Traffic Signal Timing Plan (1/2) 1. Determine lane configurations and lane volumes 2.
Traffic Signal Timing Design Part II. Slide 2 What to do?  Distribute volume among lanes to Identify lane utilization Determine need for lane adjustment.
Effect of short left-turn bay on intersection capacity Yukai Huang.
Problem 4: Okeechobee Road Stopped Control Analysis.
Problem 4: Clifton Country Rd/Route 146 Intersection Base Case Phasing and Volumes Analysis Plans Description of Analyses Overarching Issues 4a: AM peak.
CEE 764 – Fall 2010 Topic 6 Delay and Offset Delay and Offset.
Case Study 1 Problem 3 Styner/Lauder Intersection Moscow, Idaho.
Continuous Flow Intersection March, Why are we here? Discuss Continuous Flow Intersection compared to Standard Intersection Update permit status.
INTERSECTION MODEL COMPONENTS TTE 6815 K. Courage.
Problem 6: Route 146 Arterial Study We’re going to look at 7 intersections simultaneously: the Shenendehowa Campus entrance, Moe Road, Maxwell Drive, Clifton.
Signal timing CTC-340. Key Elements Development of safe and effective phase plan and sequence Determination of vehicle signal needs –Timing of yellow.
Evaluation and Re-Design Haifa and Yafa Streets.
Lane Volume Allocation
2a. Fully actuated signal - Improved T intersection
Signalized Intersections
Signalized Intersections
Problem 2: Moe Rd/Route 146 Intersection
Highway capacity and Level of Service Analysis
Signal Timing: Putting it All Together
CE 3500 Transportation Engineering Saturation flow and signal LOS
Highway Engineering CE 431
Transportation Engineering Calculating Signal Delay February 23, 2011
Signal Design CTC-340.
Presentation transcript:

CEE – Spring 2005 Lectures 10 to 11 (Chapters 21, 22) Analysis of Signalized Intersections

CEE – Spring 2005 HCM Procedure - Example N Volume and Geometry

CEE – Spring 2005 HCM Procedure - Example  Other information Area type: non-CBD Area type: non-CBD Lane width: NS Left-turn lanes: 11 ft, all other 12 ft Lane width: NS Left-turn lanes: 11 ft, all other 12 ft Grade: NB: +2%; SB: -2% Grade: NB: +2%; SB: -2% Length of turn bays: LT: 150 ft; RT: 300 ft Length of turn bays: LT: 150 ft; RT: 300 ft Parking: No Parking: No Base saturation flow: 2000 vph Base saturation flow: 2000 vph PHF: 0.95 PHF: 0.95 % HV: NS: 4%; EW: 2% % HV: NS: 4%; EW: 2% No bus stops No bus stops Pedestrian: 10/hr on each direction; WALK: 5 s; FDW: NS: 15 s; EW: 20 s Pedestrian: 10/hr on each direction; WALK: 5 s; FDW: NS: 15 s; EW: 20 s Arrival type: EW: 3; NS: 5 Arrival type: EW: 3; NS: 5 Protected LT Protected LT Phases: 1-SBL, 2-NBT, 4-EW, 5-NBL, 6-SBT Phases: 1-SBL, 2-NBT, 4-EW, 5-NBL, 6-SBT Cycle length: 100 s Cycle length: 100 s Yellow: 4 sec Yellow: 4 sec All-red: 1 sec All-red: 1 sec Lost time per phase: 4 s Lost time per phase: 4 s No RTOR No RTOR Geometry Traffic Signal Timing

CEE – Spring 2005 HCM Procedure

CEE – Spring 2005 HCM Conceptual Framework  Lane group Basic entity for starting the analysis (only HCM 2000) Basic entity for starting the analysis (only HCM 2000) Exclusive turn lane(s) is considered as a group Exclusive turn lane(s) is considered as a group Shared through/turn lanes are considered as a group Shared through/turn lanes are considered as a group

CEE – Spring 2005 Saturation Flow Rate  Saturation headway and Saturation flow rates saturation headway, h i saturation headway, h i saturation flow rate, s i saturation flow rate, s i Page 599 ~ 605

CEE – Spring 2005 Signal Timing and Capacity  v/s ratio as a measure of demand  Signal timing: distribute green times among movements (phases)  Capacity, c i

CEE – Spring 2005 V/C Ratio, Delay, and LOS  v/c ratio (degree of saturation), X i  LOSDelay (sec/veh) A<=10 B10-20 C20-35 D35-55 E55-80 F>80

CEE – Spring 2005 HCM Modules Input Volume Adjustment Saturation Flow Rate Capacity Delay and LOS

CEE – Spring 2005 Delay Chapter 17 (page 490 ~ 495)

CEE – Spring 2005 Assignment You are asked to analyze the operations of N. Virginia/McCarran intersection based on the data you collected for the weekday midday peak hour. You need to use the three capacity analysis software, HCS, TRAFFIX, and Synchro to do the analyses. Specific tasks and requirements of this assignment are as follows: 1. You can discuss and consult any questions with other members of your group, however, each person must submit an individual report. 2. You can make estimates or assumptions if certain data are not available, but you must provide the justifications of your estimates or assumptions. Furthermore, each group must come up with the same data inputs for conducting the analyses. 3. Based on the existing data you collected, conduct an operational analysis using the three software. Summarize the delay and LOS results from the three software (by lane group, approach, and intersection), compare and comment on the results. How do they compare with the delays you collected in the field? Discuss the results. 4. If the signal timings from the three software are different from Task 3, make them consistent and perform Task 3 again. Do you get identical results? Why? 5. Use the data from Task 4, change the signal timing from actuated control to fixed control, and report the delay results. What can you conclude from the results? 6. Select one of the software you prefer, run cycle length from 40 seconds to 100 seconds with a 10-sec increment. Plot the intersection delays vs. cycle length, and comment on the results. 7. Increase the demands by 60% for all the movements. If LOS D is the acceptable criteria for the intersection, and no lane group should have a v/c ratio greater than 1.0. Will the intersection still operate at acceptable LOS after the demand increase? If NOT, what mitigation measures would you recommend? 8. It is projected that the traffic demand at this intersection will grow by 60% over the next 20 years (without considering the traffic due to UNR growth). With UNR’s future growth, a total of 800 vehicle trips (50% in and 50% out) will be added to this intersection during the midday peak hour, among which 30% will be coming from and going to east on McCarran, 30% will be coming from and going to the north on N. Virginia Street, and 40% will be coming from and going to the west on McCarran. Will the intersection be operating at acceptable level? If NOT, what mitigation measures (e.g., geometry change, signal timing change etc.) would you recommend?