APD Connector Update 6/23/03 Ian Harnarine NICADD Weekly Meeting
Phil is in the process of producing about 5 pairs of our connectors: APD Connector Update 6/23/03 Ian Harnarine We are not going to release the shroud for production until we have inspected the produced connectors after polishing.
APD Connector Update 6/23/03 Ian Harnarine Top Layer of PC Board:
APD Connector Update 6/23/03 Ian Harnarine Bottom Layer of PC Board:
APD Connector Update 6/23/03 Ian Harnarine To Do List: Inspect produced connectors and alter the shroud, if warranted. Work on perfecting the PC-Board design. Demand better food at the Blackhawk Cafeteria.