Methods of Handling Project Risk Lecture No. 30 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.

Slides:



Advertisements
Similar presentations
Chapter 6 Trade-Off Between Risk & Return
Advertisements

Budi Frensidy - FEUI1 Mathematics for Asset Valuation Budi Frensidy Faculty of Economics, University of Indonesia 4 th International Conference on Research.
Chapter 5. Measuring Risk Defining and measuring Risk aversion & implications Diversification Defining and measuring Risk aversion & implications Diversification.
Contemporary Engineering Economics, 4 th edition, © 2007 Probabilistic Cash Flow Analysis Lecture No. 47 Chapter 12 Contemporary Engineering Economics.
Sensitivity and Scenario Analysis
Risk and Rates of Return
(c) 2001 Contemporary Engineering Economics 1 Chapter 14 Project Risk and Uncertainty Origin of Project Risk Methods of Describing Project Risk.
Flash back before we compare mutually exclusive alternatives.
Topic 1: Introduction. Interest Rate Interest rate (r) is rate of return that reflects the relationship between differently dated cash flows. Real risk-free.
(c) 2001 Contemporary Engineering Economics 1 Decision Tree Analysis A graphical tool for describing (1) the actions available to the decision-maker, (2)
Engineering Economics in Canada
Present Worth Analysis Lecture No.15 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Contemporary Engineering Economics, 4 th edition, © 2007 Methods of Describing Project Risk Lecture No. 46 Chapter 12 Contemporary Engineering Economics.
(C) 2001 Contemporary Engineering Economics 1 Chapter 6 Principles of Investing Investing in Financial Assets Investment Strategies Investing in Stocks.
Sensitivity and Breakeven Analysis
Contemporary Engineering Economics, 4 th edition, © 2007 Risk Simulation Lecture No. 49 Chapter 12 Contemporary Engineering Economics Copyright, © 2006.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
Lecture No. 38 Chapter 12 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Basic Tools of Finance Finance is the field that studies how people make decisions regarding the allocation of resources over time and the handling of.
Chapter 14 Risk and Uncertainty Managerial Economics: Economic Tools for Today’s Decision Makers, 4/e By Paul Keat and Philip Young.
Lecture No.14 Chapter 4 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Chapter McGraw-Hill/IrwinCopyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved. A Brief History of Risk and Return 1.
Chapter 12 Capital Budgeting and Risk
Engineering Economics
Understanding Risk. 1.What is risk? 2.How can we measure risk?
© 2009 Cengage Learning/South-Western The Trade-off Between Risk and Return Chapter 6.
L30: Methods of Handling Project Risk ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Portfolio Management Lecture: 26 Course Code: MBF702.
L30: Methods of Handling Project Risk ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
A History of Risk and Return
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Investing in Financial Assets Lecture.
TOPIC THREE Chapter 4: Understanding Risk and Return By Diana Beal and Michelle Goyen.
Investment Analysis Lecture: 10 Course Code: MBF702.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Estimating Project Volatility Lecture.
McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved. 5-1 Chapter 5 History of Interest Rates and Risk Premiums.
Stephen G. CECCHETTI Kermit L. SCHOENHOLTZ Understanding Risk Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Sensitivity and Breakeven Analysis Lecture No. 25 Chapter 10 Fundamentals of Engineering Economics Copyright © 2008.
FINANCE IN A CANADIAN SETTING Sixth Canadian Edition Lusztig, Cleary, Schwab.
L29: Sensitivity and Breakeven Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
1 Ch 7: Project Analysis Under Risk Incorporating Risk Into Project Analysis Through Adjustments To The Discount Rate, and By The Certainty Equivalent.
Risk and Capital Budgeting 13 Chapter Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Risk and Capital Budgeting 13.
© 2010 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible Web site, in whole or in part.
(C) 2001 Contemporary Engineering Economics 1 Investing in Financial Assets Investing in Financial Assets Investment Strategies Investment Strategies Investing.
CIA Annual Meeting LOOKING BACK…focused on the future.
Chapter 11 Risk and Rates of Return. Defining and Measuring Risk Risk is the chance that an unexpected outcome will occur A probability distribution is.
Risk Analysis in Capital Budgeting. Nature of Risk Risk exists because of the inability of the decision-maker to make perfect forecasts. the risk associated.
Dr. M. Fouzul Kabir Khan Professor of Economics and Finance North South University Lecture 5: Project Appraisal Under Uncertainty.
How to Build an Investment Portfolio The Determinants of Portfolio Choice The determinants of portfolio choice, sometimes referred to as determinants of.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Probabilistic Cash Flow Analysis.
Summary of Previous Lecture Understand why ranking project proposals on the basis of IRR, NPV, and PI methods “may” lead to conflicts in ranking. Describe.
1 Ch 7: Project Analysis Under Risk Incorporating Risk Into Project Analysis Through Adjustments To The Discount Rate, and By The Certainty Equivalent.
Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Money and Banking Lecture 11. Review of the Previous Lecture Application of Present Value Concept Internal Rate of Return Bond Pricing Real Vs Nominal.
Chapter 5 Present-Worth Analysis. 2 Loan versus Project Cash Flows Initial Project Screening Methods Present-Worth Analysis Methods to Compare Mutually.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.
Dealing with Uncertainty Assessing a Project’s Worth under Uncertainty or Risk.
Risk Analysis “Risk” generally refers to outcomes that reduce return on an investment.
Methods of Describing Project Risk
Investing in Financial Assets
Probabilistic Cash Flow Analysis
Chapter 5 Understanding Risk
Decisions Under Risk and Uncertainty
Comparing Mutually Exclusive Alternatives
Return, Risk, and the SML RWJ-Chapter 13.
Chapter Five Understanding Risk.
Chapter 7 Present Worth Analysis
Topic 1: Introduction.
FINA1129 Corporate Financial Management
Presentation transcript:

Methods of Handling Project Risk Lecture No. 30 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005

Probability Concepts for Investment Decisions Random variable: variable that can have more than one possible value Discrete random variables: Any random variables that take on only isolated values Continuous random variables: any random variables can have any value in a certain interval Probability distribution: the assessment of probability for each random event

Expected Return/Risk Trade-off

Measure of Expectation (discrete case) (continuous case)  xf(x)dx

Expected Return Calculation EventReturn (%) ProbabilityWeighted % 9% 18% % 2.7% 5.4% Expected Return 10.5%

Measure of Variation

Variance Calculation

Estimating the amount of Risk involved in an Investment Project 1. Probabilistic Cash Flow Approach 2. Risk-Adjusted Discount Rate Approach

1. Probabilistic Cash Flow Approach

Example PeriodExpected cash flow Estimated standard deviation 0-$2, , ,000500

Present Worth Distribution If we can assume that PW(i) is a normal distribution with mean E[PW] and variance V[PW], we can make a more precise probabilistic statement of PW for the project.

2. Risk-Adjusted Discount Rate Approach An alternate approach to consider the risk elements in project evaluation is to adjust the discount rate to reflect the degree of perceived investment risk. The most common way to do this is to add an increment to the discount rate, that is, discount the expected value of the risky cash flows at a discount rate that includes a premium for risk. The size of risk premium naturally increases with the perceived risk of the investment

Example You are considering a $1 million investment promising risky cash flows with an expected value of $250,000 annually for 10 years. What is the investment’s NPW when the risk-free interest rate is 8% and management has decided to use a 6% risk premium to compensate for the uncertainty of the cash flows

Solution Given: initial investment = $1 million, expected annual cash flow = $250,000, N = 10 years, r = 8%, risk premium = 6% Find: net present value and is it worth investing? First find the risk adjusted discount rate = 8% + 6% = 14%. Then, calculate the NPW using this risk- adjusted discount rate: PW(14%) = -$1 million + $250,000 (P/A, 14%, 10) = $304,028 Because the NPW is positive, the investment is attractive even after adjusting for risk.

Comparing Risky Investment Projects - Comparison Rule If E A > E B and V A  V B, select A. If E A = E B and V A  V B, select A. If E A < E B and V A  V B, select B. If E A > E B and V A > V B, Not clear. Model Type E (NPW) Var (NPW) Model 1$1,950747,500 Model 22,100915,000 Model 32,1001,190,000 Model 42,0001,000,000 Model 2 vs. Model 3  Model 2 >>> Model 3 Model 2 vs. Model 4  Model 2 >>> Model 4 Model 2 vs. Model 1  Can’t decide

Investment Strategies Trade-Off between Risk and Reward  Cash: the least risky with the lowest returns  Debt: moderately risky with moderate returns  Equities: the most risky but offering the greatest payoff Broader diversification reduces risk Broader diversification increase expected return

Broader Diversification Reduces Risk

Broader Diversification Increases Return AmountInvestmentExpected Return $2,000Buying lottery tickets-100% (?) $2,000Under the mattress0% $2,000Term deposit (CD)5% $2,000Corporate bond10% $2,000Mutual fund (stocks)15%

OptionAmountInvestmentExpected Return Value in 25 years 1$10,000Bond7%$54,274 $2,000Lottery tickets-100%$0 $2,000Mattress0%$2,000 2 Term deposit (CD) 5%$6,773 $2,000Corporate bond10%$ $2,000Mutual fund (stocks) 15%$65,838 $96,280 1

Summary Project risk—the possibility that an investment project will not meet our minimum requirements for acceptability and success. Our real task is not to try to find “risk-free” projects—they don’t exist in real life. The challenge is to decide what level of risk we are willing to assume and then, having decided on your risk tolerance, to understand the implications of that choice.

Three of the most basic tools for assessing project risk are as follows: 1. Sensitivity analysis– a means of identifying the project variables which, when varied, have the greatest effect on project acceptability. 2. Break-even analysis– a means of identifying the value of a particular project variable that causes the project to exactly break even. 3. Scenario analysis-- means of comparing a “base –case” or expected project measurement (such as NPW) to one or more additional scenarios, such as best and worst case, to identify the extreme and most likely project outcomes.

Sensitivity, break-even, and scenario analyses are reasonably simple to apply, but also somewhat simplistic and imprecise in cases where we must deal with multifaceted project uncertainty. Probability concepts allow us to further refine the analysis of project risk by assigning numerical values to the likelihood that project variables will have certain values. The end goal of a probabilistic analysis of project variables is to produce a NPW distribution.

From the NPW distribution, we can extract such useful information as the expected NPW value, the extent to which other NPW values vary from, or are clustered around, the expected value, (variance), and the best- and worst-case NPWs. All other things being equal, if the expected returns are approximately the same, choose the portfolio with the lowest expected risk (variance).