Recent results Marc & Qian. Outline 3D uniformity scan End cap TOF counter test result Report of moving laser box.

Slides:



Advertisements
Similar presentations
We are now working with 2 microscope: 1st Microscope Official setup: MICOS stage NIkON optics and illuminator DALSA camera cad-4 Recently several hardware.
Advertisements

Homogeneity of Small Chambers T4, T6, T7, T8 and Gas Gain Measurements of Frascati and Roma Chambers Emmanuel Angulo (CSU Fresno) Weekly Meeting ATLAS.
Persuasion in Advertising Grade 4, Theme 4 Persuasive Writing (insert ads in boxes and increase transparency to allow title to show)
Study of the MPPC Performance - contents - Introduction Fundamental properties microscopic laser scan –check variation within a sensor Summary and plans.
Status of MRPC-TOF Wang Yi Department of Engineering Physics Tsinghua University, Beijing, China 1.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
X-Ray Survey of The ATLAS SCT. The ATLAS Semi-Conductor Tracker.
Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber.
Integration & Information Marc and Qian. USTC Laser Pulse TrainLaser Signal from Barrel TOF Counter.
Nov. 7 report LIU Qian. This morning we installed 6 fibers: fiberPMT 39AOut layer 3 39BInner layer 3 39COut layer 4 39DInner layer 4 39EOut layer 5 39GOut.
Recent Result of TOF Monitor System Qian LIU. Outline  Ref-PMT  Barrel TOF  End cap TOF.
TOF monitor system Qian LIU. Outline TOF Monitor system introduction (briefly) Arithmetic of TOF Monitor system analysis program How to run the program.
M. Bonesini - MICE CM19 RAL 07/10/071 M. Bonesini INFN Milano PMTs tests in Milano (M. Bonesini, M. Rayner, S. Terzo)
12.18 report LIU Qian. Moon box test Purpose: Try to find the reason why the Q resolution is about 10%. Test: The stability of Ref-PMT test Ref-PMT voltage.
Today’s (12.7) Report LIU Qian. East EC is ready, we are going to install the EC TOF next Monday.
Scanning apparatus. Final tune ups Repeatability: move in a given steps and see if we can get the same amounts. Calibration: mainly to convert any given.
Recently Report LIU Qian. Putting the common end into the moon box We removed this surface of rack when we were installing the common end. We didn’t move.
M. Bonesini - MICE CM CERN 24/2/071 M. Bonesini INFN Milano Updates on TOF project.
3.5 Solving Systems of Equations in Three Variables
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
M. Bonesini - MICE CM18 RAL 16/06/071 M. Bonesini INFN Milano Updates on TOF project.
Rate and Gain Measurements of the 1-m long GEM detector Aiwu Zhang EIC tracking R&D weekly meeting.
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
1 July GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
Organization of an Argument
Beam test results of Tile/fiber EM calorimeter and Simulator construction status 2005/03/05 Detector Niigata University ONO Hiroaki contents.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
M. apollonio MICE Beamline summary. - Beamline parallel session (June 1 st ): - envisaged goals (Alain) - assess readiness of the line magnet status (Ken)
Systematic Study of Strip/Block Scintillators: Progress Report E.P. Jacosalem, S. Iba, N. Nakajima, H. Ono, A.L. Sanchez, A.M. Bacala & H. Miyata ILCCAL.
1 NIU Integrated Readout Layer Kurt Francis NICADD Northern Illinois University March 19, 2014.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
Development of TOP counter for Super B factory K. Inami (Nagoya university) 2007/10/ th International Workshop on Ring Imaging Cherenkov Counters.
1 Magnetic measurements proposal of the FAIR magnets Magnetic Measurements of Super-FRS dipoles: budgets 1 Budget for dipoles ( ) document FAIR-SFRS-magnetic_measurement_EVM.xls.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
Status of photon sensor study at Niigata University -- SiPM and MPPC -- Photon sensor mini workshop 05/9/16 University Niigata University.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Linearity Tests The laser induced high noise pulses on the APD rendering it useless. We tried several methods to shield and filter the noise. With a stabilized.
R&D of Calorimeter using Strip/Block Scintillators with SiPM
Chapter 4 A First Analysis of Feedback Feedback Control A Feedback Control seeks to bring the measured quantity to its desired value or set-point (also.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
M. Bonesini - MICE RAL M. Bonesini INFN Milano PMTs tests in B field.
UM PPS Lab Activities Mid-size Panel Tests PPS meeting January 15, 2012 Claudio, Curtis, Dan, Ethan, Riley.
Fiber routing test Marc & Qian (We did not glue in any fibers and only used tape for temporary purpose. We routed four fibers.)
What canlearn from about Ken Livingston, University of Glasgow, Scotland.
Gating PMT M. Aoki. Hodoscope – Trigger – TOF 3e4 hits/plane/pulse by the prompt burst. – 3e3 hits/bar/pulse. Standard PMT will be saturated. Gating-PMT.
 Argument  Big Claim/Thesis  Mini Claim/Reason  Evidence  Explanation  Counterclaim.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
3.6 Solving Systems of Linear Equations in Three Variables ©2001 by R. Villar All Rights Reserved.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
KM2A PMT testing platform FENG Cunfeng, LI Chaoju, SUN Yansheng Shandong University THE 2 nd WORKSHOP OF AIR SHOWER DETECTION AT HIGH ALTITUDES IHEP, Beijing,
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
R. Michaels, JLab PREX Mtg, July 2008 Recent Cavity Monitor Tests Credit: John Musson, Anna Boehle, Vince Sulkosky Good position & current for 10 nA to.
Upgrade activities at Clermont-Ferrand
Upgrade of the scintillator testing station in Prague
The Beam Test at Fermilab:
Soldering Process < 50 mm Solder Wire Holding Technique
CMS ECAL Calibration and Test Beam Results
ScECAL+AHCAL+TCMT Combined Beam FNAL
3.6 Solving Systems of Linear Equations in 3 Variables
Han Jifeng BESIII MUON GROUP IHEP, CAS
ISOMETRIC CIRCLES AND CYLINDERS
Yongtaek Lee, Ph.D., Professor
Humanities Matching Final
T2K Run8 MUMON Summary.
Humanities Matching Final
Alignment NOtes.
Performance test of a RICH with time-of-flight information
Presentation transcript:

Recent results Marc & Qian

Outline 3D uniformity scan End cap TOF counter test result Report of moving laser box

3D Uniformity Scan

We used USTC DAQ system to do the 13x13 3D uniformity scan = 171 total files, which covers a 3mm x 3mm square area. The reason for 171 is because we repeated the origin measurement three times (1st time is at initial origin, 2nd time is on the grid, 3rd time is final file.) / X Y (0.180,0.215) Origin (0.240,0.275) (0.300,0.335)

The percent variation over 2.5mm x 2.5mm ~ 13%.

Summary / Conclusion: 1. We did this test before we move the “Moon” Box. 2. We know from our 2 D linear X,Y scans via O-Scope, that we are able to achieve uniformity on the order of ~4%. 3. We now conclude that the USTC/main DAQ interface requires more fine tuning. 4. We know from the ref-PMT data (reading from faster O-Scope) that the laser is quite stable. 5. (To be continued…)

End cap TOF counter test

Hole A Hole B We set the HV of EC and Barrel TOF separately to achieve both gain = 1E+5. The Barrel TOF signal’s PH is mV. EC TOFSignal PH (mV)Wiggle fiber Hole A ~161 mV Hole B ~260 mV Hole A Hole B For Hole B, if we use solenoid 3 with 63% transparency, the PH is 164 mV

Summary / Conclusion: 1.According the EC TOF Fiber installation method, the both holes are easy to achieve. 2.Using Hole A, we don’t need to use solenoid 3 or filter, the EC TOF and Barrel TOF signals’ PH are almost the same, and Hole A is more stable than Hole B when we wiggled the fiber. Marc & Qian 老善 刘倩

Moving Laser Box

Before we moved the Moon Box, we tested the Ref-PMT PH: OriginPMT (mV)PH (mV) CH1(east)(0.305,0.330) CH2(west)(0.240,0.275)

We’ve moved the “Moon Box” into the rack. Then we tested the PH: CH1 (460): mV CH2 (486): mV

Summary / Conclusion: 1.After we moved the moon box, we need to do the alignment again. 2.The PH decreased about 8%. Marc & Qian 老善 刘倩