LHC status 1 20-6-2011 The Large Hadron Collider Mike Lamont for the LHC team.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

LHC Beam Operations Past, Present and Future Maria Kuhn on behalf of the LHC team Moriond QCD 2013.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
(n)QPS LHC status and plans LHC Status and Plans Mike Lamont for the LHC team 1.
(n)QPS LHC status LHC: past, present and future Mike Lamont for the LHC team
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Status of the LHC Mike Lamont for the LHC team. The LHC Very big Very cold Very high energy 2.
LHCC 3rd June 2015 Mike Lamont for the LHC team
(n)QPS LHC status and plans LHC status and plans for 2011 Mike Lamont for the LHC team 1.
Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
LHC beam operation past, present, future Mike Lamont for the LHC team.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
Where did all the protons go? Mike Lamont LBOC 20 th January 2015.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
The LHC and Beyond APS Meeting Anaheim May 2, 2011 Sergio Bertolucci CERN LHC.
Weekly summary Summary Week /19.07 M. Lamont & J. Wenninger for the OP team and for all colleagues from the various groups 8:30 meeting 1.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
LHC Status - SUSY Bonn 1 Drawing by Sergio Cittolin Status of the LHC 6 months of beam operation in 2010 J. Wenninger CERN.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Luminosity expectations for the first years of CLIC operation CTC MJ.
LHC progress Report LHCC Wednesday 23 rd March 2011.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
Evian 2014 historical perspective run 1: 2010: L peak >10 32 cm -2 s -1  2x10 32 cm -2 s : produce >1 fb -1  delivered.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
J.M. Jowett, S. Maury, PANIC05 HI Satellite meeting, 23/11/ LHC as a Heavy-Ion Collider An update John M. Jowett, Stephan Maury I-LHC Project CERN.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
LHC Machine Operational Status and Plans LHCC, 22nd September 2010 Steve Myers (On behalf of the LHC team and international collaborators)
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
LHC Status Report 1 Jan Uythoven For the LHC Team LPCC
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Fabio Follin Delphine Jacquet For the LHC operation team
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
The CERN Physics Programme
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
LHC Machine Status report
Machine Coordinators: G. Arduini, J. Wenninger
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC status Benoit Salvant (Beams department, Accelerator and Beam Physics group) for the LHC complex teams With many thanks for their inputs to J. Boyd,
The Status of the LHC machine
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Intensity Evolution Estimate for LHC
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Summary of Week 11: 14 – 21 March
Summary of Week 16 G. Arduini, J. Wenninger
Scrubbing progress - 10/12/2012
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
LHC Beam Operations Past, Present and Future
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday :15 fill 3523 dumped by BPMs IP6
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Monday 152 bunch operation summary
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

LHC status The Large Hadron Collider Mike Lamont for the LHC team

Introduction Performance in 2010 Progress in 2011 Looking ahead Conclusions Overview LHC status

CERN’s injector complex LHC status

LHC layout and accelerator systems LHC status

Luminosity - reminder LHC status N Number of particles per bunch KbKb Number of bunches f Revolution frequency Beam size at interaction point F Reduction factor due to crossing angle Emittance – area in phase space occupied by beam Energy normalized emittance Beta function at IP – defines beam envelope

Lay the foundations for 2011 and the delivery of 1 fb -1. Peak luminosity target 1x10 32 cm -2 s -1 Gain solid operational experience of injecting, ramping, squeezing and establishing stable beams Steady running at or around 1 MJ for an extended period Perform a safe, phased increase in intensity up to around 30 MJ per beam 2010 – main aims LHC status

2010 parameters LHC status 2010Nominal Energy [TeV]3.57 beta* [m]3.5, 3.5, 3.5, 3.5 m0.55, 10, 0.55, 10 Emittance [mm.mrad]2.0 – 3.5 start of fill3.75 Transverse beam size at IP [microns] ~ Bunch intensity1.2e111.15e11 Number of bunches collisions/IP 2808 Stored energy [MJ]28360 Peak luminosity [cm -2 s -1 ] 2e321e

Luminosity: 3 running periods 8 Bunch trains Nominal bunch commissioning Initial luminosity run Nominal bunch operation (up to 48) Performance ramp-up (368 bunches) Performance ramp-up made possible by a safe, staged commissioning. Meticulous preparation for unsafe beams! LHC status

Luminosity 2010 LHC status CMS

Status LHC Stored Energy 80 kg TNT Stored energy reached at 3.5 TeV: 28.0 MJ 10 LHC status Ralph Assmann

Excellent single beam before collisions - over 300 hours Luminosity lifetime hours, better in 2011  Reasonably well given by emittance growth and intensity decay  Minimal drifts in overlap – beams very stable Intensity lifetime ~90 hours  Luminosity burn, losses on collimators Emittance growth (hor. ~ 30 hours, vert. ~ 20 to 40 hours)  Intra Beam Scattering  and something else – at least sometimes “the hump” Lifetimes LHC status

Aperture looks good LHC status

Optics & magnetic machine Optics stunningly stable Machine magnetically and optically well understood  Excellent agreement with model and machine Magnetically reproducible  Important because set-up remains valid from fill to fill LHC status

Measured Cleaning at 3.5 TeV IR8 IR1 IR2 IR5 Momentum Cleaning Dump Protection Col. (beam1, vertical beam loss, intermediate settings) LHC status Making sure the hierarchy is respected Beam cleaning efficiencies ≥ 99.98% ~ as designed

Excellent single beam lifetime Ramp & squeeze essentially without loss  No quenches with beam above 450 GeV  Excellent performance of Machine Protection Optics close to model (and correctable) Excellent reproducibility Aperture as expected Better than nominal from injectors  Emittances, bunch intensity Beam-beam: can collide nominal bunch currents  With smaller that nominal emittances – surprise! LHC summary 15 And surprisingly good availability… LHC status

Overall LHC efficiency in W. Venturini 65% availability Not bad for the first year of operation! LHC status

Very fast commissioning plan worked:  Collisions within 50 hours of first injection  Profited of the experience of the proton run  Stable beams within 4 days (… and physics)  Rapid progression in number of bunches The LHC worked with Pb beams  No rapidly decaying, invisible beams  No quenches  Some new losses and radiation problems Pb run LHC status

Integrated Luminosity 10  b -1 Peak Stable Luminosity Delivered3.04x10 25 cm -2 s -1 Maximum number of bunches in collision137 Average bunch population1.2x10 8 ions (>60% above nominal) Pb run Achievements 06/06/

Pb run 2010: Collimation Generally according to predictions (i.e. efficiency is a factor worse than p). J. Jowett LHC status

PROBLEMS – TWO OF THEM LHC status

Many sudden local losses have been recorded. No quench, but preventive dumps Rise time around of the order 1 ms. Potential explanation: dust particles falling into beam creating scatter losses and showers propagating downstream Distributed around the ring – arcs, inner triplets, IRs UFOs – unidentified falling objects LHC status

Electron cloud LHC status Schematic of electron cloud build up in LHC arc beam pipe due to photoemission and secondary emission [F. Ruggiero] Reflection Secondary emission yield [SEY] Vacuum pressure rise (background in experiments) Single-bunch instability Multi-bunch instability Incoherent emittance growth Heat load in cold arcs (quenches in the limit)

Vacuum activity started off in regions with common beam pipe at 450 GeV as we pushed up the number of bunches with 150 ns spacing  Test solenoids cured problem – electron cloud Tried 50 ns bunch spacing  Things really kicked off  High vacuum activity in warm regions  Significant heat load in cold regions  Instabilities and beam size growth observed  Surface conditioning (‘scrubbing’) observed Gas desorption rates and SEY drop Time constant < 1 day Situation a lot cleaner with 75 ns  incoherent effects seen – emittance blow-up  800+ bunches injected into both beams Experience in 2010 LHC status

2010 observations are certainly due to ~ 2 < SEY < 2.5, whereas 1.7 was usually the max value studied in the past Scrubbing with large emittance, high intensity 50 ns beam Time around 10 days including preparation and validation Lots of wire wrapped around warm bits during the technical stop (solenoids) Scrubbing strategy for LHC status

Solenoids between DFBX and D1 in IR1R LHC status

Motivation is clear! 1 fb -1 delivered to each of IP1, IP5 and IP8 at 3.5 TeV Challenge to deliver 1 fb -1 to IP8  Maximum luminosity : from 2e32 to 3e32 cm -2 s -1  Luminosity leveling via separation required to get close Alice  pp run: 5e29 < L < 5e30 cm -2 s -1, µ < : main goals LHC status fast, secure and far-reaching Decided on beta* = 1.5 m in Atlas, CMS; 3 m in LHCb; 10 m in Alice

Beam commissioning: 3 weeks  Exit - stable beams with low number of bunches Ramp-up to ~200 bunches (75 ns): 2 weeks  Multi-bunch injection commissioning continued  Stable beams Technical Stop: 4+1 days Scrubbing run: 10 days including 50 ns injection comm. Intermediate energy run – 5 days Resume 75 ns operation and increase no. bunches: 3 weeks  300 – 400 – 600 – 800 – MPS and OP qualification Physics operation 75 ns: ~930 bunches 50 ns remains an option if things look good Baseline scenario for LHC status We are here!

2011 LHC schedule Q1/Q2 28 LHC status

2011 – recommissioning LHC status th FebruaryFirst beam, circulating beams established. 3 rd MarchFirst collisions at 3.5 TeV, beta*=1.5 m with pilot beams 5 th MarchNominal bunches at 3.5 TeV, start collimator set-up, injection and beam dump set-up & validation 13 th MarchFirst stable beams, 3 bunches per beam, initial luminosity 1.6e30 cm-2s-1 18 th March32 bunches per beam, initial luminosity ~3e31 cm -2 s th March64 bunches per beam, initial luminosity ~6e31 cm -2 s th March 1.45e32 cm -2 s -1 with 75 ns Fast re-commissioning, improvements across the board. Operation cycle now well optimized: faster ramp & squeeze, much fewer manual actions required by shift crews

Machine still beautiful Beta beating corrected down to 5- 10%!! Confirmed stability of the optics ‘Final’  * values from K-modulation: Errors around 4-10% Aperture: global > 12  triplet  14.5  Beam/planeIR5IR1 B1H B2H B1V B2V LHC status

Scrubbing run Impressive progression in spite of several technical problems not related to the scrubbing (> 3 days lost). 5 days of scrubbing All solenoid off (experiments and vacuum solenoids at warm sections) DateBunches B1+B2 Tue 5 th April Wed 6 th April Sat 8 th April Sun 9 th April Mon 10 th April Careful increase in intensity (in steps of 200 bunches) monitoring cryogenics, vacuum, machine protection and particularly RF Limited to 72 bunches/train by injection performance Reached 1020 bunches per beam at the end of the scrubbing run  more than protons per ring LHC status

Scrubbing: effect on beam Started like this – 300 bunches LHC status 804 bunches some hours of scrubbing

Scrubbing: Heat-loads in the arcs Impressive reduction of the heat load in few hours: results consistent with SEY reduction from 2.5 to <1.8 L. Tavian LHC status Decision taken to go with 50 ns bunch spacing after encouraging scrubbing run

Running with higher total beam intensity requires much finer control of the beam parameters plus… More UFOs More SEUs RF Power Couplers (present limitation) RF wave-guide flashover (linked to UFOs) HOM heating of Injection kickers, cryo, collimators.. (total intensity and bunch length dependence) Next step – increasing the number of bunches LHC status Issues include:

UFO’s: coming thick and fast ~90 in 90 minutes – happily most below threshold LHC status 35

UFO around injection region LHC status UFOs 9 beam dumps. 679 UFOs around the injection kickers caused 9 beam dumps. Most of the UFOs around the kickers occur before going to stable beams.

Radiation to electronics (SEUs etc.) US LHC status Cryogenics controls implicated (among others)

Collimation loss of hierarchy at 450 GeV  Orbit. Regular loss maps performed 72 (108/144) bunches from SPS  Beam quality from injector very important  144 bunches per injection from SPS > 1 MJ down the lines High temperature superconducting current lead quenched (7th April)  Invoked quench of 11 magnets Injection Kicker Flashover (18th April)  Not pretty, heavy beam loss Increasing intensity – machine protection LHC status However…

Luminosity lifetime > 20 hours Lifetimes during a fill (1092 bunches) Very good lifetime during the whole process Hardly visible when we go in collision c/o ATLAS LHC status

IP8 Luminosity leveling operational LHC status 40 Needed to get to 1 fb -1 in LHCb given the limit in peak luminosity

LHC precision front LHC status VdM scan IP1 H IP1 V absolute luminosity normalization low, well understood backgrounds precision optics for ATLAS-ALFA and TOTEM precise measurement of the luminous region + beam intensity --> absolute luminosity and cross section calibration currently ~ 5 % level,

And we’ve been producing some luminosity LHC status Luminosity x10 33 cm -2 s -1 Back to back fills with 1092 bunches

Peak Luminosity LHC status

LHC status 44

Weekly LHC status

LHCb LHC status

Integrated Luminosity to date (IR1-5/IR8)1.06 fb -1 /0.36 fb -1 Peak Stable Luminosity Delivered1.26x10 33 cm -2 s -1 Maximum number of bunches at 450 GeV/c1308 Maximum number of bunches in collision1092 Maximum intensity in collision1.3x10 14 p/beam Maximum stored energy73 MJ/beam Average bunch population1.2x10 11 p Emittance in collision ~2.5  m Maximum Luminosity Delivered in one day56 pb -1 Maximum Luminosity Delivered in one week239 pb -1 Status LHC status

Week 23 – the week before last! LHC status DateFill number Time in stable beams Int. lumi [pb -1 ] Cause of dump Mon 6 th 18549m.59trip of RQ6.L2 Mon-Tues185514h21m41.3RTQX2.R1 - FGC Tue-Wed185610h50m31.0Alice dipole trip Wed18580Big UFO IP2 Wed-Thu18593h56m13.4Electrical glitch Thu186211h12m32.4Trip RSQSX 400 V PS Thu - Sat18639h4330.8PLC DFB-cryo MS L1 Sat - Sun18646h4823.1D2.L1 bus bar quench Sun - Mon186513h36m42.6Collimator controls Mon186620m1.3RF Total Voltage Intlk B1 Mon 14 th 18678h14m28.8RF module trip 48

Week 23 LHC status

Week 23 LHC status

It is not always easy! A day in June. LHC status Collimator temperatureRF arcQPS noise  quench UFO IR2 Cryo S56 Cryo S34 Injection preparation for 144b 51 And let’s not mention last week.

Outlook for 2011 (protons) 110 more days at >10 33 cm -2 s -1 and an efficiency for physics (Hubner factor) of 0.2 gives another 2 to 3 fb -1 Main known unknowns: UFOs and SEU LHC status ns studies to come during MDs (to sort out injection and beam stability issues) and possibly an operational development period to validate scrubbing and future operation

Outlook for 2011 (Pb) Number of bunches vs. bunch population  Possibility to reach 540 bunches but likely limited to nominal bunch population Optics  Take over ATLAS and CMS β* from protons  Squeeze ALICE to same value β*= 1.5 m - 2 days setup Could reach peak luminosities in the range of 1 to 1.4×10 26 cm -2 s -1 and integrate 30 to 50  b -1 Short run more sensitive to any prolonged machine problems LHC status

Testing p-Pb in 2011 Important to resolve uncertainties regarding feasibility, Pb intensity limit from unequal revolution frequencies at injection, ramp  Modulation of long-range beam-beam, transverse feedback, tune-control … Crucial questions are related to injection and ramping  Effects of protons (say 10% of nominal) on one Pb bunch  Inject few Pb bunches against some convenient p filling scheme  Possible in 2011 (OK in 2012)  Detailed planning of MD being worked out LHC status

Physics data-taking until end of 2012 Following measurements of the copper stabilizers resistances during the Christmas stop, we will re- evaluate the maximum energy for 2012 (Chamonix 2012) Baseline is probably 50 ns  Better emittances from injectors with potential to push lower, better performance for a given total beam intensity  Possible to push up bunch intensity  But first see what 25 ns brings… LHC status Given up making predictions of integrated luminosity!

The LHC is a beautiful machine (although some times temperamental) – a real testament to those that built it. High intensity was known to require more careful control of the machine parameters and to potentially bring a host of other issues into play  Work very much in progress 50 ns has proven to be a good choice - more potential > 1 fb-1 delivered to ATLAS and CMS ~0.36 fb-1 delivered to LHCb How much higher in peak luminosity we can go for ATLAS and CMS will depend on extent of UFOs, SEUs etc.  Aiming for 1380 bunches… Conclusions LHC status