Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.

Slides:



Advertisements
Similar presentations
LOW VOLUME ROAD DESIGN EMPIRICAL APPROACH.
Advertisements

Engineering College Civil Engineering Department Jenin – Tubas Highway Design Transportation Engineering Graduation Project Supervisor : Dr. Khaled Al-Sahili.
Wisconsin DOT Facilities Development Manual (FDM)
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
EXAMINATION OF MODERN SANITARY LANDFILLS W. Gregory Vogt Chair, Sanitary Landfill Working Group, ISWA Vice President, SCS Engineers.
Missouri Department of Transportation US Fish and Wildlife Service Squaw Creek National Wildlife Refuge Habitat Restoration Breakout Session Shannon Kusilek,
Preliminary Design of Galvez Estates Subdivision.
 Narrow roadway, with no shoulders  Poor pavement condition  AADT 405/150 – Low Traffic Volume  Ideal candidate for P.I.P.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
March 2014 Water Resource Permitting Purpose & Need.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Florida Department of Transportation, November 2009
Transportation Study for City of Bluffdale Porter Rockwell Boulevard is a planned, designed and partially built major arterial road that connects Mountain.
Design of Open Channels and Culverts
EXAM 2 REVIEW. 1. Drainage problem (25 pts) Below you see a cross-section of a ditch. It runs parallel to a 200-acre field consisting of permanent pasture.
1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor.
Profile elevations Sometimes the profile is too steep to illustrate on our profile sheet so we have to break the profile. This partial profile illustrates.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
Bridge 2153 Final Report Premier Engineering Rose-Hulman Institute of Technology.
Final Presentation Minerva Engineering. Introduction  John Kats- Project Manager  Ryan Schipper- Project Editor  Matt Lash- Project Engineer/Client.
Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda.
Highways 5/16/99 Intersection Realignment. Project Team Lindsey Thomann- Project Manager Jessica Young- Project Engineer Erik Dolmseth- Project Engineer/Client.
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
Example 3: Determination of M r = 3/8. Example 4: Pavement Thickness Given M r = 10,000 psi (69 MPa) and ESAL = 10 6, design the thickness of a pavement.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Geometric & Pavement Design Example Problems
I-69 Team 3. Introduction History of project Proposed Route Challenges.
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Wes Marshall, P.E. University of Connecticut March 2007
Pavement Analysis and Design
THE WAY FORWARD or WHO SAID RESEARCH WAS EASY ?. Relationship between variables  x Y = (say) roughness after 5 years Poor Good Expectation for acceptable.
Prepared by Hakam J. AarajQadri H. Shaheen Mutaz H. O’deh Under the supervision of Prof. Dr. Sameer A. Abu-Eisheh “ Moh’d Bin Rashid Al-Maktom Road ” Design.
CE303: Introduction to Construction Blueprint Lab.
Highway Route Surveys And Location
Civil Engineering Department Design of Nablus Tulkarm Highway Prepared by Ahmed Mohammed Mustafa Anas Zeyad Belbeasi Under the Supervision of Dr. Khaled.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
U.S. 150 / S.R. 56 Road Reconstruction Project in Paoli, Orange County Thursday, August 25, :00pm Presentation Orange County Community Center 1075.
CE303: Introduction to Construction Blueprint Lab.
بسم الله الرحمن الرحيم AN-NAJAH NATIONAL UNIVERSITY FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Evaluation, Design and Redesign Beit Wazan and.
Project Constraints Maximum Expected Traffic Load: 2 twenty-ton, 2-axle trucks per week Channel Size: app. 6 ft wide x 5.5 ft deep Available Reinforcement.
Evaluation and Redesign of Rojeeb Street. Objectives ▪ Evaluation of existing conditions of Rojeeb Street. ▪ Estimation of future conditions of Rojeeb.
Basic Hydraulics: Culverts – I
Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special.
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
An Introduction to Contracts and Design Guides Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation.
Geometric Design: General Concept CE331 Transportation Engineering.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
May 2010 Photo provided by the Trust for the National Mall U.S. Commission of Fine Arts Concept Review.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Jerry L. Larson IRMCA Indiana LTAP Basics of a Good Road
Port Huron, Michigan Gregg Aukeman Andrew Dobbs Adam Mueller Manuel Torreira.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
The I-465 West Leg Reconstruction Project
Geohazard inventory Training • April 19, 2017
Rehabilitation Project
INDOT Culvert Sizing Policy
Design of Jenin-Tubas Highway
NORTH TRUNK SEWER REPLACEMENT PROJECT
Chapter(16) AASHTO flexible pavement design method
Calculating Dimensions for a Typical Pavement Section using 1993 AASHTO Flexible Pavement Design Guide.
HERO UNIT Training Module
ACEC Designer Training
Presentation transcript:

Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter

Today’s Agenda Project Description & Approach Alternative Solutions Final Design Results –Proposed Roadway –Horizontal & Vertical Alignment –Pavement Design –Hydraulic Design –Construction Plan –Cost Analysis Summary - Q & A

Project Description 13-acres of land Multiple curves in the road, storage buildings, railroad tracks and other outdoor storage 0.6-mile road connects the main access highway to the storage facility Recent changes in ordinance transport have brought up this issue

Project Description Challenges –Railroad crossings must be limited –Crossing can not be over a “frog” –Road must meet Navy, INDOT, and AASHTO codes and regulations

Project Approach Site Assessment - walkthrough, site survey, map overview Existing Subsurface Conditions - Soil assessment - Boring samples from ATC Associates Codes and Regulations - challenges - must comply with Navy, AASHTO and INDOT codes and regulations

Project Approach Assessment of Design Constraints –Wildlife protection, subgrade conditions, hydrological issues Design –Consider possible alternatives –Design appropriate solution based on criteria

Alternative Solutions Five alternative solutions Developed by RH Roadways with suggestions from client & faculty Created Evaluation Matrix Design of best alternative

Alternative 1 – Existing Road

Alternative 2 – Modify Existing Road

Alternative 3 – New Alignment South

Alternative 4 – New Alignment North A

Alternative 5 – New Alignment North B

Evaluation Matrix

Comparison Existing Roadway Roadway conditions fair/poor 7 RR crossings 85-feet radius of curvature 10% maximum vertical grade Little signage Proposed Roadway Excellent roadway conditions 5 RR Crossings 500-feet minimum radius of curvature 3% maximum vertical grade Proper signage (posted 25mph)

Comparison Existing Roadway Lack of pavement markings Width of 16-feet Average thickness of 4-inches Proposed Roadway Adequate markings (centerline, edges, etc.) Width of Road 24-feet with shoulders and ditches Pavement total thickness of 10- inches

Horizontal Alignment Plan View Map

Typical Cross Section

Vertical Alignment Profile View Map

Pavement Design Computed an Equivalent Axel Load (EAL) –Traffic Study – 200 trucks per day each way –Used traffic data and tractor trailer dimensions and weight for EAL design Million EAL –Calculated Stacker EAL – insignificant Pavement Thickness –CBR value from ATC Associates + EAL –Asphalt Institute Manual to design 4 options

Pavement Options Option1: 2” Asphalt Concrete Surface 9” Asphalt Concrete Base Option 3: 2” Asphalt Concrete Surface 8” Asphalt Concrete Base 6” Untreated Aggregate Subbase Option2: 2” Asphalt Concrete Surface 15” Type III Emulsified Asphalt Base Option 4: 2” Asphalt Concrete Surface 13.5” Type III Emulsified Asphalt Base 6” Untreated Aggregate Subbase

Pavement Cost Data collected from INDOT website detailing their project costs for HMA costs include labor and equipment.

Final Pavement Design 2” Asphalt Concrete Surface 8” Asphalt Concrete Base 6” Untreated Aggregate Subbase

Hydraulic Design Place 3 culverts –Corrugated Metal Pipe – 12” Diameter Ditches –Flow of 1.27 cubic feet per second –Depth = 0.5 feet –Slope = 3:1

Culvert Locations

Construction Alternatives Traffic Control - Three Options Method 1: –Complete shutdown of road with a detour to divert traffic during construction Method 2: –Shut down one lane while remaining lane stays open for traffic flow Method 3: –Same as method 2, save an added detour to ease traffic flow through the project area.

Traffic Detour Method Matrix

Traffic Control Method 3

Traffic Detour Route

Erosion & Sediment Control Plan Erosion control points of interest: –Minimum clearing and grading –Minimum erosion due to short project time –Runoff is non-existent – no present streams –After bare soil removed, silt fences will be needed along sloped areas –Upon project completion, areas must be seeded and slopes protected with erosion control blankets in place

Erosion Control Map Insert 11x17 erosion control map

Soil Management Borrow location Location for cut soil to be stored “Phase-construction” Topsoil stockpiles Soil testing required according to AASHTO and INDOT Specifications

Waste Management Large capacity worksite dumpsters Construction fencing Planned stockpiling Pavement removal ~2500 yd^2

Cost Analysis

Summary Project Description & Approach Alternative Solutions Final Design Results –Proposed Roadway –Horizontal & Vertical Alignment –Pavement Design –Hydraulic Design –Construction Plan –Soil & Waste Management –Cost Analysis

Questions???