April 2006Jean-Sébastien GraulichSlide 1 Pmts and Scintillators o Used Material in Geneva - Big Scintillator Slabs + Pmts - XP2972, 1” Pmts + Voltage Divider.

Slides:



Advertisements
Similar presentations
MICE CM January 2009Jean-Sébastien GraulichSlide 1 EMR Issues o Detector o Front end electronics o Funding and Plan Jean-Sebastien Graulich, Geneva.
Advertisements

The Saguaro from MGI, USA The Sonora Series MGI, USA Automated Batch Wafer Handling 1203 West Geneva Drive Tempe, Arizona USA Tel:
The Saguaro from MGI, USA The Sedona Wafer Handling & Cassette Indexer from MGI, USA 1203 West Geneva Drive Tempe, Arizona USA Tel: 800 TEL-SERV
WA105 General Meeting at CERN 21 & 22-January-2014 Enrique Calvo Alamillo.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Inti Lehmann University of Glasgow 27 June 2011 Status of the TOFs.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 DDAQ Hardware Architecture o General Architecture o Tracker Baseline o TOF Baseline & Options o EmCal Baseline.
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ for BTF o BTF Overview o Hardware Overview o DAQ Software Description o What’s next o Summary Jean-Sebastien.
M. Bonesini1 TOF design updates M. Bonesini – INFN Milano.
Downstream transversal sizes Rikard Sandström University of Geneva MICE detector meeting.
CHIPP June 2008Jean-Sébastien Graulich MICE Calorimeter R&D Jean-Sebastien Graulich, Univ. Genève o o Introduction to MICE o o The MICE Calorimeter o o.
CM23 Harbin January 2009TOF Reconstruction1 TOF reconstruction Mark Rayner CM23 Harbin.
M. Bonesini PID Meeting1 M. Bonesini INFN Milano MICE TOF0 construction & planning.
VME readout fro TOF MICE Tracker Meeting 30 March Paul Soler, Kenny Walaron University of Glasgow and Rutherford Appleton Laboratory.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DDAQ Pending Issues o Detector FEE o Software framework o Trigger o Data Storage Jean-Sebastien Graulich,
M. Bonesini - MICE Collaboration Meeting 9/10/061 M. Bonesini INFN Milano TOF status (mainly TOF0/1)
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Report on FEE for PID o Reminder o TOF o EMCAL o Summary Jean-Sebastien Graulich, Geneva.
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
Dec 2005Jean-Sébastien GraulichSlide 1 Improving MuCal Design o Why we need an improved design o Improvement Principle o Quick Simulation, Analysis & Results.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
4th April MICE – Magnetic Shield Configuration H Witte, J Cobb Oxford University University of Oxford, Clarendon Laboratory, Parks Road, Oxford,
DPNC Sept 2007Jean-Sébastien Graulich MICE The international Muon Ionization Cooling Experiment o o Introduction o o Beam Line o o Cooling Channel o o.
Shielding EMCal-KL planes D.Orestano on behalf of L.Tortora MICE CM 8/10/06.
MICE VC March 2009Jean-Sebastien GraulichSlide 1 EMR Status o Introduction o News o Detector Design o Simulations o Responsibilities o Plan Jean-Sebastien.
M. Bonesini - MICE CM CERN 24/2/071 M. Bonesini INFN Milano Updates on TOF project.
Status of CLAS12 PCAL project
MB1 T.O.F. II Precise timing Electron ID Eliminate muons that decay Tracking devices T.O.F. 0 & I Pion /muon ID precise timing 201 MHz RF cavities Liquid.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
M. Bonesini - MICE CM18 RAL 16/06/071 M. Bonesini INFN Milano Updates on TOF project.
1 IBL Integration Activities & Future plans  Overall FEA on Geneva (in convergence with Seattle)  News from IST Composite Design  Integration.
CEDAR Support Structure and PMT Test Peter Sutcliffe 13 th July 2011 CERN via EVO.
DELO-STEP Stair Renovation How to renovate this stair ? Option 1 : varnishing 4 week-ends approximately 150 € varnish + filling Option.
Types of Microscopes Simple Microscope - contains only one lens. ex. magnifying glass Compound Light Microscope - a system of two lens that work together.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich.
Detector Systems For May/June Run MICE Video Meeting April 24, 2008.
27/6/05 Frascati1 M. Bonesini INFN Milano MICE TOF stations updates.
0 The LHCb Hadron Calorimeter Rustem Dzhelyadin, (IHEP, Protvino) INSTR02 Conference, BNPI, Novosibirsk, Russia Contents: Œ Design overview  Trigger with.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
PANDA Anton A. Izotov, Gatchina A.A.Izotov, Gatchina, PANDA Forward TOF Walls. Side TOF walls in dipole Magnet SiPM/PMT187.
V0L Hardware Status ALICE WEEK CERN, MARCH 2003 Ana Delia Becerril IFUNAM, México.
Packaging & Containers To Understand the Reasons for Packaging Designs.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
1/10/2016Collaboration Meeting Feb 2011 Start Counter 1 Start Counter Update W. U. Boeglin L. Guo E. Pooser Measurements on EJ-212 scintillator bars Attenuation.
Instrumentation and Simulations for Target Test MICE Collaboration Meeting 22 October Bill Murray 1, Paul Soler 1,2, Kenny Walaron 1,2 1 Rutherford.
M. Bonesini - MICE PID review 12/10/061 M. Bonesini INFN Milano TOF upstream PID review (TOF0/1)
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
M. Bonesini - MICE RAL M. Bonesini INFN Milano PMTs tests in B field.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
CHIPP Oct 2007Jean-Sébastien Graulich Status of MICE Jean-Sebastien Graulich, Univ. Genève o o Introduction o o Beam Line o o Technical Design o o PID.
PROPOSAL FOR A MUON VETO SYSTEM BEHIND THE HADRONIC CALORIMETER (MUV-3) Problems and requirements:  Expected total rate for 9.25 < R < 120 cm: 12.1 MHz:
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 3, Part 2 Roberta.
Total control software for Breton fabshop equipment.
Faculty of Physics, University of Belgrade Collaboration meeting CERN, 24 th of September 2015 ToF-LR status and future Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration meeting, Dubna 8 th of April, ToF-LR Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
Task: draw a timeline showing the main events from page Turn your book sideways and get a fresh page 2. At the top put the title: 'Rome's rise.
10 mm is the same as... 1 cm. 20 mm is the same as... 2 cm.
How to Measure.
Particle ID Diagnostics in the MICE Beamline
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
To be able to find percentages
Welcome Work: 1. Take out your Act 2 study guide to turn in.
Presentation transcript:

April 2006Jean-Sébastien GraulichSlide 1 Pmts and Scintillators o Used Material in Geneva - Big Scintillator Slabs + Pmts - XP2972, 1” Pmts + Voltage Divider o Quotation for new Scintillator

April 2006Jean-Sébastien GraulichSlide 2 Big scintillator slabs  Scintillator dimension: 130 cm x 20 cm x 8 cm  Equipped with light guides and 4” Pmts (many spare Pmts)  300 cm long when equipped !  ~ 15 years old, not used for 9 years  24 pieces available  Not tested  Not easy to handle

April 2006Jean-Sébastien GraulichSlide 3 4” PMts  I have been told they are XP2041 (labels are gone…)  Base + Iron shield + Mu-metal Shield available  About 50 pieces

April 2006Jean-Sébastien GraulichSlide 4 1” Pmts  XP 2972, 10 stages  Equipped with Voltage Divider  No mounting nor shielding  More than 200 easily available (much more if we dig a bit…)

April 2006Jean-Sébastien GraulichSlide 5 1” Pmts  Example of integration (not usable for MICE)  24 scintillator slabs (4cm x 4cm x 40cm)  Used as TOF stations (~ 1m x 1m total size) Scintillator Light Guide + Pmts

April 2006Jean-Sébastien GraulichSlide 6 Quotation for new Scintillator  BC-408 Plastic Scintillators Bars  Edges diamond tool finish  Prices are Ex Works Newbury Ohio USA.  1000mm x 100mm slabs, various thickness: 10mm thick: USD 340 / piece 20mm thick: USD 460 / piece 30mm thick: USD 630 / piece 40mm thick: USD 760 / piece 60mm thick: USD 820 / piece 80mm thick: USD 900 / piece  Price/thickness decreases continously  Prices valid for at least 10 pieces order  Probably cheaper at CERN (to be checked)