G.Barber Mice Target Stator Field Mapping March 2010 1 Mice Target Stator Field Mapping G Barber, E Longhi, C MacWaters, P Smith, J Tarrant & Many others.

Slides:



Advertisements
Similar presentations
MICE Magnetic Investigation of T2 MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
Advertisements

MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
Field measurements of QEA magnets at KEK Mika Masuzawa May 30, 2006.
G.Barber: Mice Tracker Meeting New York1 Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
Work Holding and Tool Holding
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
MICE target stator: measurements & modelling Ben Shepherd MICE target workshop 13 May 2011.
Magnetic measurements of MICE target stator Ben Shepherd MICE target meeting 11 October 2010.
Magnetic Measurements of MICE Stators & PMs Ben Shepherd MICE Target Workshop RAL, 13 December 2011.
Target: K. Long, 16Nov2009. Schedule for T2 re-instatement: T2#2: – Inspection of T2#2 documented in MICE Note 272 Some issue with Notes site … couldn’t.
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
TARGET WORKSHOP – SHEFFIELD HALLAM UNIVERSITY Monday 2 March 2009 The ISIS – MICE interface Eddie McCarron Contents 1.Target alignment with ISIS beam centre.
1 On MICE Coordinate System Yury Ivanyushenkov RAL MICE Collaboration CERN, 29 March - 2 April 2004.
Solenoid Magnetic Field Measurement. MICE solenoid includes 5 coils First solenoid expected at FNAL for magnetic field measurements in April Measurements.
Target: K. Long, 21Dec2009. Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Continuing delay in material delivery! » Vespel delivery.
G.Barber 28 Oct Construction/Refurbishment Of The Tracker Prototype Contents:- Welcome Back Plans Layout Things to be addressed New Schematic.
1 MICE Magnets Contents: Background Refurbishment Testing Installation & survey Current status Upstream beamline Open issues & concerns MICE Beamline Review,
(FEA) Analysis P J Smith University of Sheffield 27 th November 2008.
Electric Motor By Princess Barcega APG School Powerpoint hosted on Please visit for 100’s more free powerpoints.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Page 1 Christian Grefe, DESY FLC Status of PCMAG fieldmapping analysis Annual EUDET Meeting Paris, Status of PCMAG fieldmapping analysis Christian.
Lesson 9: Electrical Components
G.Barber - Imperial College London - EE Workshop March EE Dee Assembly Contents:- Area Manipulator Future Plans.
TRISHUL Winding Solutions Pvt Ltd ROTOR COILS  It is the moving part of a rotary system.
1 Progress On The Design And Manufacture Of The New Stator Geoff Barber Imperial College.
Symmetry Figures are identical upon an operation Reflection Mirror Line of symmetry.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Some Thoughts on Magnetic Measurements for MICE Michael A. Green Lawrence Berkeley Laboratory Berkeley CA 94720, USA.
Hall A DVCS calorimeter Operation Safety procedure September 18 th 2014 Alexandre Camsonne DVCS Readiness Review.
Magnet Measurement Device for MICE F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No. 29 RAL technical drawings by O.Jamet.
9. What is the measure of angle b? What vocabulary words apply to this Figure? 1) 2) A.1,2,and 3 B.1 and 2 C.1 and 3 D.2 and A point is located at.
MICE Target Development Lara Howlett University of Sheffield.
ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads and Spencer’s Trip to IHEP,
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
UNIT ONE: Science Skills  Chapter 1Measurement  Chapter 2The Scientific Process  Chapter 3Mapping Earth.
AMS-02 Magnetic Field Measurement Prof. Chin E. Lin, NCKU, TNN TIM Jan. 09, 2007.
Magnetic field due to an electric current
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
ELECTROMAGNETS By wilf And Michael.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
Tracker 1. Status 2. Expected delivery date of system to RAL 3. Required support infrastructure needed for setup and initial debug. Things like vacuum,
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Magnet Fiducialization.
G.Barber Mice Tracker Mechanical Progress Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment of Tracker.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Design and Measurement Results for the Permanent Magnet Undulators for the Linac Coherent Light Source Facility II D. Arbelaez BeMa2014, 01/02/2014.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
QXF Coil working group 2/11/16 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Coil Fiducialization Proposal.
G.Barber: Mice Collaboration Meeting 29 March Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Single Stage Design.
TE-MSC. 07/04/2016 Jose Ferradas TE-MSC-MDT Alejandro Carlon TE-MSC-MDT Juan Carlos Perez TE-MSC-MDT On behalf to MSC-MDT section and Coil working group.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Target Installation Plan
Re-mapping the Residual B-Field in NA62
AC and DC motors.
16 T dipole in common coil configuration: mechanical design
CLIC PMQ High-strength prototype
Stator Rotor Rotating Shaft Primary core Rotating Direction Secondary core Primary coil Secondary coil.
Induction Motor. Induction motor Main parts are Stator Rotor.
Alignment of the first two magnet system modules of Wendelstein 7-X
Field Photos
©2009 G Dear – Not to be sold/Free to use
Measurement and Characterization of a 5T Solenoid Field
Fig. 1 Experimental schematic and setup.
Hall probe Location on top or bottom
Presentation transcript:

G.Barber Mice Target Stator Field Mapping March Mice Target Stator Field Mapping G Barber, E Longhi, C MacWaters, P Smith, J Tarrant & Many others

G.Barber Mice Target Stator Field Mapping March Mice Target Stator Field Mapping Contents:- Design of the Rig Services Mapping Procedure Future Work

G.Barber Mice Target Stator Field Mapping March Design of the Rig The Rig we are using is in R79 and belongs to the Diamond Insertion Devices Group. It consists of a large 3 axis stage (the largest is ~5M a little excessive), a 3 axis Hall probe and readout system. The 3D model shows a layout of the system

G.Barber Mice Target Stator Field Mapping March Design of the Rig (cont) The Plan is to bolt a frame onto a granite support block at the end of the existing test rig. This we hope will cause the minimum inconvenience to our hosts. The 3D model and photos show the stator support frame with kinematic mount.

G.Barber Mice Target Stator Field Mapping March Services The setup requires the following services :- Power Supply Water Chiller Electronic Controller

G.Barber Mice Target Stator Field Mapping March Mapping Procedure The mapping procedure will be carried out by Emily Longhi who will determine the method and techniques required. Because of the non symmetry of the hall probe ‘wand’, see below, it may be necessary to rotate the stator, rotate the wand or a combination of both. If it is necessary to rotate the stator the original 4 mounting holes enable measurements to be taken every 90° we have added a second set of mounting holes to the rig which allows measurements every 45°

G.Barber Mice Target Stator Field Mapping March Services The setup requires the following services :- Power Supply Water Chiller Electronic Controller

G.Barber Mice Target Stator Field Mapping March Future Work Any Future work will largely depend on what we find from the initial tests and how we can make the apparatus more user friendly. As we aare relying on the good will of another group it would be preferable to make the procedure as smooth and quick as possible. I can for example envisage a rotary stage to quickly change the angle of the stator. A second line of work will be to devise a method of mapping the individual coils before they are fitted so it is possible to assemble along a common magnetic axis