Hydrogen system status Yury Ivanyushenkov for Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.

Slides:



Advertisements
Similar presentations
1 CM24 – 2 nd June 2009 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Advertisements

Hydrogen R&D system HAZOP
Hydrogen Pre-Operation Safety Review 4 th October 2011 Hydrogen R&D System Operational Procedures and Test Plan M Courthold.
MICE OsC – 22 nd June 2010 Liquid-hydrogen system and absorber M Hills T Bradshaw M Courthold S Ishimoto W Lau I Mullacrane P Warburton.
MICE hydrogen review Commissioning, testing and operations.
1 MICE Hydrogen System Elwyn Baynham, Tom Bradshaw, Iouri Ivaniouchenkov RAL MICE / RAL Safety RAL, 30 October 2003.
Review of Helium Venting Analyses
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
Hydrogen Hazard Summary and Preliminary FMECA and HAZOP Yury Ivanyushenkov Elwyn Baynham Tom Bradshaw.
1 Status of Hydrogen System Development MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov, Tom Bradshaw, Elwyn Baynham, Mike Courthold,
MICE Hazard Overview and Analysis Elwyn Baynham Tom Bradshaw Yury Ivanyushenkov.
MICE Safety Review Process and Schedule Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov Columbia Meeting June 2003.
CM26 – 26 th March 2010 Step IV: Liquid Hydrogen Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
1 Hydrogen Safety System Summary MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Tom Bradshaw, Yury Ivanyushenkov Applied Science Division,
MICE AFCSWG Safety Review Summary Mary Anne Cummings Dec. 17, 2003 MICE Video Conference.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
A presentation at the MICE Video Conference on Wednesday the 5 th of May 2004 Response to the Safety review comments by Wing Lau -- Oxford.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
H2 Safety Review - response paul drumm MICE VC, March 29 th,2006.
Matthew Hills Hydrogen System – Piping and Instrumentation Diagram.
Hydrogen R&D system HAZOP and failure analysis Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
MICE Hydrogen System MICE Collaboration Meeting, CERN, 29 March-2 April 2004 Elwyn Baynham, Tom Bradshaw, Yury Ivanyushenkov Applied Science Division,
MICE hydrogen review Summary of system hardware. System function To provide 22 litres of liquid hydrogen for use as a muon absorber within a superconducting.
Mechanical Safety Systems and DSEAR Compliance
MICE hydrogen review System modifications. Relief circuit repair During leak testing of R&D tests, the insulating vacuum would not go lower than
MICE Hydrogen System Tom Bradshaw Yury Ivanyushenkov Elwyn Baynham Meeting October 2004 – Coseners House.
Patrick Thornton, SNS/FPE June 9, 2008
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
Dr Daniel Colbourne 36th Meeting of the Open-ended Working Group of the Parties to the Montreal Protocol – Side Event UNEP.
Health & Safety at Work Hazards from Aerosols.  To understand the hazards associated with aerosol products.  Understand how to control these hazards.
The MICE Hydrogen System Summary Tom Bradshaw, Yury Ivanyushenkov, Elwyn Baynham, Tony Jones, Mike Courthold and Matthew Hills Rutherford Appleton Laboratory.
MICE CM30 7 th July 2011 Liquid Hydrogen Delivery System M Hills (STFC, RAL) T Bradshaw (STFC, RAL) M Courthold (STFC, RAL) S Ishimoto (KEK) A Muir (STFC,
NATIONAL INSTITUTE OF AEROSPACE TECHNOLOGY Rosa Mª Rengel Gálvez Marina B. Gutiérrez García-Arias 11/09/2007 Rosa Mª Rengel Gálvez Marina B. Gutiérrez.
MICE Hydrogen Safety Functions IEC61508 Compliance & Emergency Procedures MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
1 Liquid Hydrogen R&D test report Video Conference – 23/08/12 S Watson P Warburton M Courthold.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
1 Preparation of the hydrogen test system Yury Ivanyushenkov for Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones CCLRC Technology.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Explosion An explosion is a rapid expansion of gases resulting in a rapid moving pressure or shock wave. The expansion can be mechanical or it can be.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
The MICE Hydrogen System Safety Review Introduction Tom Bradshaw, Yury Ivanyushenkov, Elwyn Baynham, Tony Jones, Mike Courthold and Matthew Hills Rutherford.
MICE Hydrogen System Tom Bradshaw Yury Ivanyushenkov Elwyn Baynham Collaboration Meeting RAL October 2004.
Hydrogen Delivery System Schedule MICE Schedule Review 23 rd -25 th May 2011 M Hills STFC.
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Progress on Hydrogen R&D System
Hydrogen Control System MJD Courthold TW Bradshaw Y Ivanyushenkov D Baynham.
ERT 312 SAFETY & LOSS PREVENTION IN BIOPROCESS HAZARDS IDENTIFICATION
Progress on Hydrogen R&D System Yury Ivanyushenkov on behalf of Elwyn Baynham, Tom Bradshaw, Mike Courthold Matthew Hills, Tony Jones MICE Collaboration.
1 Liquid Hydrogen R&D test report CM34 – 17/10/12 S Watson P Warburton M Courthold.
1 Liquid Hydrogen update CM33 S Watson P Warburton M Courthold.
1 MICE absorbers work package MPB – 27/10/15 Mike Courthold Mark Tucker Phil Warburton Steve Watson.
1 MICE Hydrogen system Working group mtg – 01/09/14.
Replacing hydride bed with bottle Advantages No risk of diminished bed capacity Following jobs no longer necessary – Move pressure gauge – Replace cracked.
Working group meeting 07/05/15. Agenda Overview of review and current action list Relief system – Summary of problem – Details of analysis, testing and.
Hydrogen System Update
MICE Safety Review Meeting 4th Oct 2011 PJ Warburton - Daresbury Lab
Health & Safety at Work Hazards from Aerosols
Status of Hydrogen System Development
Health & Safety at Work Hazards from Aerosols
HAZOP Guidewords Base Set
Presentation transcript:

Hydrogen system status Yury Ivanyushenkov for Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones

2 Scope Implementation of R&D system HAZOP recommendations Hydrogen zones classification in MICE hall R&D facility location Hydride bed test by the manufacturer Hardware procurement Plans

3 MICE Hydrogen system HAZOP MICE R&D Hydrogen system HAZOP R&D Hydrogen delivery system:  Preliminary HAZOP at the Internal Review – November 2005  Draft response to the Internal Review Panel presented at Osaka CM, 1 March Review panel recommended that “A full HAZOP study carried out with the aid of an external specialist, should be completed as a priority”.  R&D system HAZOP study at RAL by SERCO experts – May 2006

4 MICE Hydrogen R&D System

5 HAZOP: Nodes 1. Metal Hydride Storage Unit (Including Heater/Chiller Unit) 2. Hydrogen Bottle and line to Buffer Volume (Including lines through HA-PV05, HA-RV06 & HA-PV07) 3. Purge/Fill Helium Cylinder and line through HA-PV18 4. Buffer Tank (Including lines through HA-PV08, HA-BD09 & HA-RV10 to Vent) 5. Lines from Buffer Tank to Cryostat 6. Absorber Volume and Condensing Pot 7. Test Cryostat and Mass Spectrometer Port to Vent and exhaust Vent (Including coolant lines) 8. Nitrogen System - Jacket and Ventilation Purge (Including nitrogen cylinder and lines through HA-PV11, HA-BD12 & HA- PV13)) 9. Gas Panel

6 Hydrogen R&D System: Nodes for HAZOP Node 1 Node 2 Node 3 Node 4 Node 5 Node 6 Node 7 Node 8 Node 9 Node 6

7 HAZOP Recommendations Node 1 (Metal Hydride Storage Unit): 1. Look at pressure of hydride bed "on a hot day" i.e. high ambient temperatureMC (Failure of heater/chiller pump -> Increase of pressure in system) 2. Consider a chiller pump failure alarm for the hydride bed unit MC (As above) 3. Review consequences of a glycol release (leak) onto plant items from the chiller AJ (Leak in pipework -> Ehylene glycol dripping onto plant/equipment) 4. Review appropriate methods of crane operating areas to reduce risk of damage to plant from impact/dropped loadsAJ (Dropped load from crane -> Damage to plant/equipment e.g. ruptured pipework) 5. Consider linking temperature monitor with heater chiller operation to avoid overheating in the event of thermostat failureMC (Failure of thermostat in heating unit -> Temperature >30C causing rise in pressure) 6. Consider automation of hydride bed hand valve MC (As above) 7. Assess ignition sources around the hydrogen generation unit to reduce possibility of fire in the MICE hallCN (External fire in the MICE hall -> Possible flame impingement on metal hydride unit) 8. Review hydride bed operational sequencing for inappropriate actions MC (Failure of thermostat in cooling unit -> Lower temperature)

8 HAZOP Recommendations (2) Node 2 (Hydrogen Bottle and Line to the Buffer Volume): 9. Review process for filling hydrogen bed for indication that the bed is full (including the location of bottles during storage and filling)MC (Excessive hydrogen delivered to hydride bed -> Higher pressure) 10. Consider back streaming with He during connection to avoid contamination with air during bottle changesMC (Failure to purge hydrogen filling line -> Lower pressure) 11. Review access to roof to avoid exposure to vented hydrogen CN (Emergency venting of hydrogen -> Potential explosive atmosphere at roof level) Node 4 (Buffer Tank): 12. Consider test mechanism to validate (RV10) seal after discharge of cold HydrogenMC/MH ( RV10 operates and discharges cold hydrogen -> Potential to result in failure to reseal) 13. Confirm that control software system conforms with IEC61508 MC (Operator accidentally opens PV08 via control system -> Air ingress to system) Node 5 (Lines from Buffer Tank to Cryostat) 14. Identify appropriate procedure in the event of blockage due to condensation of impurities in buffer tank/cryostat lineMC/TB (Condensation of impurities -> Pressure rise in the absorber volume)

9 HAZOP Recommendations (3) Node 6 (Absorber Volume and Condensing Pot) 15. Ensure hydrogen sensors on UPS in case of loss of power MC (Loss of power -> Inability to monitor state of system) 16. Consider the benefits of having all control system on UPS in the case of loss of power to prove state of system informationMC (As above) 17. Ensure that software intervenes when discrepancies are detected with provision for limited operator interventionMC (Operator makes wrong decision -> Cryostat fills with air if, for example, PV25 opened) 18. Consider installation of mass spectrometer (RGA) on PV25 to monitor potential embrittlement issuesMC (Hydrogen embrittlement issues -> Leak of hydrogen) 19. Assess ignition sources around the cryostat unit (as for Recommendation 7) CN (External fire on the MICE hall -> Possible flame impingement on cryostat and affect internals)

10 HAZOP Recommendations (4) Node 7 (Test Cryostat and Mass Spectrometer Port to Vent and Exhaust Vent) 20. Review capability of bursting disc to withstand scenario of RV10 or RV23 pressure surgeMH (Activation of RV10 (from buffer volume) or RV23 (hydride bed) -> Disc bursts and hydrogen ingress into cryostat) 21. Confirm whether bursting disc would create ignition source on activation MH (As above) 22. Consider the inclusion of a non-return valve downstream of the burst disc to avoid pressure surge from RV10 or RV23 activationMH (As above) Node 8 (Nitrogen System – Jacket and Vent Purge) 23. Consider installation of flow meter(s) / indication device to alert low/ no flow from nitrogen bottle around nitrogen jacket circuitMH (Empty gas bottle -> Air in ventilation line and cryostat jacket) 24. Consider fitting non-return valve to prevent hydrogen flow into nitrogen system on activation of RV10 or RV23MH (Discharge through RV10 or RV23 -> Hydrogen into nitrogen line) 25. Review need for protection/location of gas bottles to prevent vehicle (or other) ImpactsAJ (Vehicle impact with cylinder bottle storage -> Potential rupture of cylinder) Node 9 (Gas Panel) 26. Review methods to minimise condensation on hydrogen pipework AJ (High moisture content -> Condensation on hydrogen pipework leading to pools of water on floor)

11 Hydrogen R&D System: updated PID HAZOP recommended

12 After-HAZOP steps What’s next : - Final report from Serco received - HAZOP recommendations being examined and implemented - Decide whether another session of HAZOP is required: - Not for R&D system

13 Hydrogen Zones in MICE Hall A Safety Officer approach: Follow RAL Safety Code 1(Hydrogen and Deuterium) and BS EN to define hydrogen zones Zones according RAL Safety Code 1: Zone 0 An area or enclosed space within which any flammable or explosive substance, whether gas, vapour, or volatile liquid, is continuously present in concentrations within the lower and upper limits of flammability. Zone 1 An area within which any flammable or explosive substance, whether gas, vapour, or volatile liquid is processed, handled or stored and where during normal operations an explosive or ignitable concentration is likely to occur in sufficient quantity to produce a hazard. Zone 2 An area within which any flammable or explosive substance whether gas, vapour or volatile liquid, although processed or stored, is so well under conditions of control that the production (or release) of an explosive or ignitable concentration in sufficient quantity to constitute a hazard is only likely under abnormal conditions. Area classification procedure is defined in BS EN The procedure calculates the volume and time of persistence of hydrogen cloud for a given hydrogen release rate and then assigns the zone type (0,1,2 or non-hazardous))

14 Hydrogen Zones in MICE Hall (2) MICE approach: - the experiment can not afford MICE hall to be Zone 2 -> Engineering of MICE hydrogen system should be done in a way that MICE hall is not Zone 2 ! - Achieved for the hydrogen R&D system (gas panel is under venting hood, jacketing of the test cryostat and of hydrogen lines is implemented) - Can this approach be reliably extended to MICE hydrogen delivery system and AFC modules ?

15 Hydrogen R&D facility site Hydrogen R&D facility was originally sited in the MICE hall Pros: -The R&D system later becomes the first (out of 3) MICE hydrogen system Cons: -The work on hydrogen R&D interferes with civil work in the MICE hall; - Time schedule is defined by the Phase I preparation time table and puts the hydrogen R&D programme into the background mode (  risk of failure). That is why it has been suggested to search for a dedicated site for hydrogen R&D facility outside MICE hall. Pros: - Eliminates the Cons above, i.e. decouples Phase I programme from the hydrogen programme Cons: - Will require extra work on new facility layout and new safety case preparation, hence extra cost; - Will later require re-location of hydrogen test system into MICE hall, hence extra cost.

16 Hydrogen R&D facility site (2) MICE Hall Cryogenics Group Lab

17 New hydrogen R&D facility: Plan New Hydrogen R&D facility: - Facility layout - Safety case -> should get OK by RAL Safety - Detailed layout - Site modification ( build a partition, install venting system, modify electrics etc.) - Hardware installation Note: limited man power -> delays

18 Hydride Bed Metal hydride storage tank is arrived to RAL. It has been tested by the manufacturer: - Hydride bed was initially charged at 30 bar with NL of hydrogen ; - then discharged NL of hydrogen removed from the tank at a flow rate of 50 NL/min and at the heating temperature of about °C - and then charged at low pressure tank filled with NL of hydrogen at 1.6 bar abs, temperature of about -10 °C with flow rate of 50 NL/min (-> NL/8 hours) Test results: the hydride bed fulfills the spec Test recommendations for a heater/chiller unit: - Heating/ cooling power ≥ 3kW - Temperature range: -30 °C °C.

19 Heating/chilling unit for hydride bed LH50 PRESTO Temperature Control System by JULABO LH50 model – water cooled LH47 model – air cooled (reduced cooling/heating power)

20 Plans What’s next : - Assess Cryogenics Group Lab as a Hydrogen R&D facility site - Continue hardware procurement: heating/chilling unit, test cryostat and gas panel - Finish implementations of HAZOP and Internal Review recommendations - Complete response to the Internal Review and submit it to Technical Board