GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Advertisements

GLAST LAT Project Managers F2F Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test April.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting Online March 9th, 2004.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Safety Overview.
Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 1 GLAST Large Area Telescope: I&T Integration Readiness.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.
GLAST LAT ProjectAll Hands Meeting – May 11, 2005 R. Claus 1 GLAST Large Area Telescope: LAT All Hands Meeting I&T/Online May 11, 2005 Ric Claus I&T/Online.
GLAST LAT ProjectOnline Roadmap Progress Report – April 22, 2004 R. Claus1 Online Roadmap to the July 2004 Freeze Progress report for April 22, 2004 (to.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT ProjectOnline Peer Review – July 21, – Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project Technical/Cost/Schedule Review 03/31/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 1 Gamma-ray Large Area Space.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review April 1 st, 2005 E-Logbook.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST Large Area Telescope:
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project Technical/Cost/Schedule Review 04/26/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT ProjectI&T Face-to-Face Online Presentation – May 30, 2002 R. Claus1 I&T Online Status and Plans Ric Claus.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST LAT Project Integration and Test IFCT Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectGLAST Flight Software, 7 February 2003 FSW Development Plan 1 GLAST Large Area Telescope: Instrument Flight Software Development Plan.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration by File James Swain Stanford.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST Large Area Telescope:
I&T&C Organization Chart
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Electrical Ground Support Equipment Verification Test Support
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope
GLAST Large Area Telescope
Integration and Test Organization Chart
GLAST Large Area Telescope: I&T Test Readiness Review
Introduction and Overview
GLAST Large Area Telescope
Integration & Test Instrument Operations Coordination
Presentation transcript:

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review EGSE/Online Elliott Bloom I&T Manager Gamma-ray Large Area Space Telescope

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 2 EGSE Process; Design to Use Integration and Test (I&T) Subsystem Electrical Ground Support Equipment (EGSE) Plan LAT-MD Just released for review.

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 3 Online Roadmap LAT-TD Document written and agreed to February 2004 Describes work to be done to prepare for flight part arrival All this work is essentially done, including V&V. This will be described latter in the talk.

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR – Building 33 EGSE room 102 set-up

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 5 Flight Software Test Bed TKR and CAL Electronics Simulators –DAQ electronics module (DAQ-EM) –Power-supplies for tower electronics 3 Event-Processor Units (2+1 spare) –Event processing CPU –LAT Communication Board Spacecraft Interface Unit –Spacecraft Interface Board (SIB): Spacecraft interface, control & data –LAT control CPU –LAT Communication Board (LCB): LAT command and data interface Power-Distribution Unit (PDU)* –Spacecraft interface, power –LAT power distribution –LAT health monitoring Global-Trigger/ACD-EM/Signal-Distribution Unit* 12 ACD Electronics Cards Spectrum Astro Simulator LAT EGSE Used in V&V Procedures for EGSE/Online

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 6 LATTE for 1&2 Tower I&T Almost Complete Outstanding items: Hardware monitoring (includes trending) –Power-up sequence Depends of FSW deliverables (ECD 11/19) In progress (ECD 12/3) –Simple event filtering In progress (ECD 11/18) –Subsystem scripts Awaiting deliveries –A month is no longer needed given all scripts are expected to be delivered in LATTE 4.x form. Couple of days is sufficient for check-out and I&T Configuration Control. Working with development versions –System scripts (SVAC & PT/E2E) In progress (ECD 12/15) Security completion Pipeline –Training In progress with development test scripts Final scripts available soon after final subsystem deliveries of scripts –V&V (following pages) Matrix of verification criteria  Online has been and shall continue practicing I&T testing from end to end with SVAC and IFCT involvement to ensure there is no missing critical functionality

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 7 Online logbook Status The Shift Log, Mate/Demate and Component Installation Record are already installed in the clean room for practice. the Material Mix Record and EGSE Log will be installed in the clean room by 1/3/05. The material mix record will be finished in the next two weeks, the EGSE log will be designed and implemented right afterwards. The Configuration Log and Software Installation Log should follow on in that order.

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 8 Component Installation Log Specification Complete Online logbook Specification LAT-MD-LAT-MD In Signoff.

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 9 V&V matrix (1) LATTE baseline ready for use. –Baseline acceptance review will be a LAT Engineering meeting. Present completion of V&V testing of feature functionality on all platforms, EM, Test Bed, and finally subsystem Flight Hardware. Software versioning verification robustness –Done Housekeeping / environmental quantity monitoring –Done Power sequencing –ECD 12/4 (Test Bed & EM) Schema/Configuration reader - Ancillary data handling (e.g., serial numbers) –Done (EM, Test Bed, & Flight Hardware at subsystem level) Script and Suite execution engine (Run Control) robustness –Test robustness against exceptions in each of the various threads –Done (EM, Test Bed, & Flight Hardware at subsystem level) Persistent file export/archive system only applicable to Bldg 33. –Done (EM) Raw science data file conversion to FITS –Done (EM) Online Pipeline processing –Done (EM) Trending –Online data base – MySQL – Done (EM) –DB synchronization offline (ISOC & SVAC use) – ORACLE – ECD 12/23

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 10 V&V matrix (2) Commanding –Test every command Done (EM, Test Bed, & Flight Hardware at subsystem level) –Performance Done (EM & Test Bed) Event stream –Science data format (LDF) Done (EM, Test Bed, & Flight Hardware at subsystem level) –ACD software counters Done (EM, Test Bed, & Flight Hardware at subsystem level) –Prescaling and filtering Done (EM, Test Bed, & Flight Hardware at subsystem level) –Performance Done (EM, Test Bed, & Flight Hardware at subsystem level) –Playback ability Done (EM, Test Bed, & Flight Hardware at subsystem level) Triggering –Functionality Done (EM, Test Bed, & Flight Hardware at subsystem level)

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 11 V&V matrix (3) HippoDraw visualization tool –Practically Done (EM, Test Bed, & Flight Hardware at subsystem level) –New releases sometimes show new bugs. Run and Test Report generators –Done (EM, Test Bed, & Flight Hardware at subsystem level) Test script completion status setting –In progress (ECD 12/1) Run comments handling –In progress (ECD 12/1) E-logbook –Online DB synchronization to mirror MySQL data base (ECD after integration starts) –Online Standalone GUI In Progress (ECD 1/15/05) –SVAC Web GUI Done (EM) Subsystem scripts (ELX, CAL, TKR, ACD, E2E, SVAC, system) – Not delivered yet. ECD - CAL Scripts 12/10; ECD-TKR 1/5/05; ECD-ELX ?; ECD-E2E, SVAC, System 12/23 –Algorithm –Robustness –Performance –Output products

GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 12 Summary EGSE hardware/Online has been extensively used and is currently being used in Flight hardware build for all subsystem. –Acceptance testing by electronics on I&T test stands yet to be done. –LATTE is baseline –Online logs on schedule for Flight Integration Online software V&V is essentially complete and release under configuration control is in place. CCB is operational for Online software