CIC NOC Update 2/04/11 Greg Redder

Slides:



Advertisements
Similar presentations
Install L2 Switch Head End CATV
Advertisements

Agenda Product Overview Hardware Interfaces Software Features
AFCOM Facility Presentation Directlink Technologies Corp. April 8, 2011.
Communications Infrastructure Committee Update for the IAC Friday, April 15, 2011.
1 13-Jun-15 S Ward Abingdon and Witney College LAN design CCNA Exploration Semester 3 Chapter 1.
Designing and Installing a Network Peer to Peer or Server –Number of workstations vs. Cost –Administration, distributed or centralized –Security considerations.
Communications Infrastructure Committee Update for LAN Managers Friday, May 27, 2011.
What is a Computer Network? Two or more computers which are connected together.
James Deaton Chief Technology Officer OneNet Glass, Graphs and Gear.
10/100/1000Base-T to Dual 1000Base-X SFP Media Converter GT-1205A Icon5Icon4Icon3Icon2Icon1.
The Network Works 800_105/c _015/c12 Current LAN Technologies 10/100Mbs to the desktop 100Mbs or 1000Mbs to servers Wireless LAN Gigabit between.
Rack Mounted Network Equipment Patch Panels Network Switch Router Rack Servers HDD Arrays UPS System Provides circuit protection and an uninterruptable.
1 INDIACMS-TIFR TIER-2 Grid Status Report IndiaCMS Meeting, Sep 27-28, 2007 Delhi University, India.
TFN Status 8/2004 Turn-up Targets TFN Optical layer scheduled for completion September 2004, Routing layer scheduled for completion by October, All.
DKTCOMEGA EDFA Product Line Jesper Broszka, Product Manager.
Metropolitan Area Network June 13, 2006 Presented by: Tim Ryan Network Manager
Sarkis Mkoyan *Yerevan Physics Institute. 2 Alikhanyan Brothers St., YerPhI Network Overview.
Computing/Tier 3 Status at Panjab S. Gautam, V. Bhatnagar India-CMS Meeting, Sept 27-28, 2007 Delhi University, Delhi Centre of Advanced Study in Physics,
CIC/VOIP/Construction Update to the IAC 9/7/12 …on behalf of the NOC
Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators.
1 W. Owen – ISECON 2003 – San Diego Designing Labs for Network Courses William Owen Michael Black School of Computer & Information Sciences University.
OSC Networking Engineering Update OSTEER June 13, 2007 Paul Schopis Associate Director OSC Networking.
InfiniSwitch Company Confidential. 2 InfiniSwitch Agenda InfiniBand Overview Company Overview Product Strategy Q&A.
HOPI Update Rick Summerhill Director Network Research, Architecture, and Technologies Jerry Sobieski MAX GigaPoP and TSC Program Manager Mark Johnson MCNC.
$100 $200 $300 $400 $500 Network topologies Client Architecture Physical Transmission Media Uses of Tele communications Misc. Network Misc. Network.
Smart Switches FS526T / FS750T / GS748T / GS724T
The Central Asian Research and Education Network Kyrgyz Research and Education Network Association - KRENA Kadyrkul Karabukaev, KRENA CAREN Meetings, Ashgabat.
OmniPoP: GigaPoP-of-GigaPoPs Design and Future Patrick Christian, OmniPoP TAC (chair) University of Wisconsin - Madison April 25, 2007.
1 LAN design- Chapter 1 CCNA Exploration Semester 3 Modified by Profs. Ward and Cappellino.
CIS CORPORATION CORBIN, KY SUMMER 2007 WALTER WAHLSTEDT CIS Internship.
Copyright 2004 National LambdaRail, Inc N ational L ambda R ail Update 9/28/2004 Debbie Montano Director, Development & Operations
PROP K UPDATE Citizens’ Oversight Committee Meeting October 17, 2013.
SL500 Modular Library System. Objectives Locate needed information. Define the safety and ESD requirements. Identify and locate major components. Unpack,
UNIT 3 SEMINAR Unit 3 Chapter 3 in CompTIA Security + Course Name – IT Introduction to Network Security Instructor – Jan McDanolds, MS Contact Information:
Cisco 3 - Switch Perrine. J Page 111/6/2015 Chapter 5 At which layer of the 3-layer design component would users with common interests be grouped? 1.Access.
Summer 2012 A Brief Review of Technology Upgrades at Mead Hall Technology Committee Meeting.
Data Sharing. Data Sharing in a Sysplex Connecting a large number of systems together brings with it special considerations, such as how the large number.
Beowulf – Cluster Nodes & Networking Hardware Garrison Vaughan.
-Network topology is the layout of the connection between the computers. -It is also known as the pattern in which computers.
Where we are... Public Interconnects: Number of peers on switch ~60 Aggregate bandwidth through switching fabric ~530mb/s average - ~680mb/s peak.
Back End FPGA Front End FPGA HV control & monitoring DACs and ADCs DCS server 6 * (pmt, 3in1, ADC) Trigger, DAQ Arrow thickness indicates bandwidth HV.
Status of the NA62 network R. Fantechi 23/5/2012.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Copyright © 2015 Rockwell Automation, Inc. All Rights Reserved. PUBLIC PUBLIC CO900H L02 - Applying Basic EtherNet/IP Features in Converged Plantwide.
This courseware is copyrighted © 2016 gtslearning. No part of this courseware or any training material supplied by gtslearning International Limited to.
WiFi Open Forum Pat Burns, VPIT; Greg Redder, ACNS & Lance Li Puma, Chair UTFAB Monday, Feb. 23, 2014 Morgan Library Events Hall 5-6:30 PM WiFi.
Enterprise Vitrualization by Ernest de León. Brief Overview.
© 2009 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. HP ProCurve 8206zl Switch and HP.
© 2009 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. HP ProCurve 2910 Series Switches.
Wireless Expansion Update and Three Year Plan Considerations
Target Network ISP Internal Network
Ethernet Switch Replacement
Chapter Objectives In this chapter, you will learn:
Technology Fee Presentation
High Speed Optical Interconnect Project May08-06
Media Conversion Solution
OpenLab Enterasys Meeting
Communications Infrastructure Committee
Media Conversion Solution
Classroom Technology Proposal 2009/2010
Making an Ethernet Cable
Wireless Expansion Update and Three Year Plan Considerations
SMART SCHOOLS BOND PHASE 1
Wireless Expansion Update
Network Design Jack TSAI Cisco Academy Instructor FAMU-FSU College of Engineering February 2003.
NTUA Broadband project
··,--.,.,. ·.._. ·.., ' t... ' ' ;'I.1!; " ·( '·( ' ·), '+ "."
UTFAB Wireless Briefing Spring 2018
Space groups Start w/ 2s and 21s 222.
AKSUM UNIVERSITY ICT Directorate Oct 10, 2018 Axum, Tigray, Ethiopia
Presentation transcript:

CIC NOC Update 2/04/11 Greg Redder

Phase 1 buildings OT Clark C Shepardson ARBL Engineering A/Z VTH Atmos NESB

Budget Status Part numberDescriptionNumber For ProjectCostExtended PriceReceived First 9 CIC buildings + 3 extra sets J9642AHP E5406 zl Switch with Premium Software12$1,302$15,6241/28/11 J8705AHP ProCurve Switch 5400zl 20 Gig-T + 4 GBIC12$1,853$22,2421/28/11 J8713A#ABAHP ProCurve Switch 5400zl 1500W Power Supply24$669$16,0562/2/11 J4858CHP ProCurve Gigabit-SX-LC Mini-GBIC3$216$6471/28/11 J4859CHP ProCurve Gigabit-LX-LC Mini-GBIC18$463$8,3341/28/11 J4860CHP ProCurve Gigabit LH-LC Mini-GBIC3$2,950$8,8501/28/11 GLC-ZX-SM-NHRZX optics for Cisco3$550$1,650on order GLC-LH-SM-NHRLH optics for Cisco12$995$11,940on order GLC-SX-MM-NHRSX optics for Cisco3$500$1,500on order Misc fiber needsPatch cords, etc1$1000 Pending UPS needsPossibly 2 MDF UPS2$1500$3000Pending Misc switch cards5300 or 5400 parts1$4000 Pending Total$86,843 Remaining of $143,620$56,777

Pending budgetary needs Fiber UPS 1 Gig cards for existing MDF switches.

Timeframe Start work immediately on fiber infrastructure Start configuration of switches week of 2/7 Start switch installs first week of March Complete 9 buildings by end of Spring semester

Concerns that can affect order/timeframe Fiber infrastructure Power/UPS Cooling Rack space

Process Bring dual gig links in from core gear at Engineering and NESB. Attach these connections to new CIC switch. Connect CIC switch in front of current MDF switch and provide two gig links into existing building switch. Attach environmental controls, life-safety, video, alarms, cardkey to switch. Designate new CIC switch as “demark”

Phase 2 Research concerns, 10G needs, other…? Consider buildings connected at only 100M? Consider buildings not affiliated with a College or a specific “hub” (don’t have a “see xyz…” in bandwidth utilization column)? Consider buildings with bandwidth issues/concerns?