XMM 1 EPIC MOS Monitoring. XMM-Newton 2 Martin Stuhlinger, ESAC MOS Bad Pixel Monitoring.

Slides:



Advertisements
Similar presentations
XMM-Newton 1 M.Stuhlinger, ESAC MOS1 Timing Mode noise echo of the meteorite column Madrid, 23. March 2009.
Advertisements

XMM XMM-NEWTON TTD Meeting: 8 April OPS-OAX (J. Martin) Autocommanding J.Martin, XMM-Newton SOE.
EPIC Calibration Meeting, Mallorca Update of EPIC pn long-term monitoring K. Dennerl, 2009 March 31 Update of EPIC pn long-term monitoring Mallorca, Spain,
Astrometry and EPIC flux cross-calibration in 2XMMp/2XMM Silvia Mateos R. Saxton, S. Sembay and the XMM-Newton Survey Science Centre.
XMM EPIC MOS Andy Read EPIC Calibration Meeting Mallorca, Spain 01/02/05 What can we do with Pattern 31s? - Central pixel (red) has.
Bruno Altieri EPIC Calibration meeting, Feb. 1-3, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
EPIC flux comparison from 2XMM sources S. Mateos, R. Saxton, S. Sembay & A. Read.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn Long-term behaviour of the CTI.. for EPIC pn.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting MPE
EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn Long-term behaviour of the CTI.. for EPIC pn.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring MPE, May 2006.
MPE, 4th of May 2006 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 4th of May 2006.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Palermo, April 2007.
European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain Andy Pollock XMM-Newton SOC RGS calibration Calibration of the XMM-Newton RGS Andy.
XMM-Newton 1 M.Stuhlinger/M.Smith, ESAC PN Monitoring Mallorca, November 2007.
Experience with combined Fe55/Vela SNR calibration - MOS Andrea Tiengo INAF, IASF-Milano In collaboration with: Mariachiara Rossetti (IASF-Milano) Martin.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Marcus G. F. Kirsch Mallorca, Summary status of the EPIC calibration.
XMM-Newton 1 M.Stuhlinger, March 2010 Status of XMM-Newton cross-calibration using SASv10.0 Madrid, 24. March 2010.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton MOS Timing Mode calibration Marcus.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Calibration of the EPIC MOS Timing.
XMM-Newton 1SCI-SA Populating the CCF Immediate needs are driven by the requirement to test the SAS over the summer before public release. (A release called.
EPIC Calibration Meeting, K. Dennerl Saclay/France, 2003 Sept offset map correction Spatial variation of the energy scale Energy correction for pixels.
XMM-Newton 1 M.Stuhlinger/P.Calderon, ESAC Re-appearance of the MOS1 CCD1 meteorite column during revs Madrid, 23. March 2010.
EPIC Calibration Meeting, ESAC K. Dennerl, 2005 October 04 CTI.. update for EPIC pn Long-term behaviour of the CTI.. for EPIC pn.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC A time jump analysis on EPIC-pn with some side results Marcus G. F. Kirsch M.J.
XMM EPIC MOS Steve Sembay EPIC Calibration Meeting Tuebingen 03/02/03-06/02/03 MOS Cooling Results and Current Response Both MOS Cameras.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting April 8, 2008, Mallorca María Santos-Lleó (XMM-Newton Science Support Manager)
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 EPIC pn: Jumps in the energy scale Sudden jumps in the absolute energy scale and their origin.
XMM 1 MOS2 CCD5 anomaly Status of the investigations.
I. de la Calle Astronomy Science Operations Division Science Operations Department Background Working Group Meeting, Mallorca – 30/03/2009 XMM-Newton ESAC.
Mallorca EPIC Cal Meeting - February 2005 Darren Baskill: XMM project: MOS monitoring.
EPIC TTD#16 SCIENCE OPERATIONS MPE, 04 May 2006 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager 1 Science Operations & Data Systems Division Research.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Cross calibration PKS
XMM-Newton 1 A.Garcia, ESAC Spectral effects of PSF core excisting Madrid, 24. March 2009.
EPIC Calibration Meeting, ESAC K. Dennerl, 2005 October 04 Adjustment of spatial gain variations Adjustment of spatial gain variations of EPIC pn.
Darren Baskill 1/10 Gain, CTI, & CTI by column.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 CTI.. update for EPIC pn EPIC pn: Update on the CTI, the absolute energy scale and the energy.
MPE EPIC Cal Meeting – May 2006 Darren Baskill: XMM project: MOS gain monitoring MOS.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, October 2006.
Martin Stuhlinger Mallorca, European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with SASv7.1 CAL Meeting.
Tony Abbey XMM Cal/Ops meeting – MPE, Garching – 5 May 2006 Tony Abbey – University of Leicester Reducing MOS data rate.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC XMM-Newton Instrument Anomaly Tool & Cross-Calibration Tool Marcus G. F. Kirsch.
XMM 1Michael Smith, ESAC EPIC PN Monitoring Provided by Michael Smith.
Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Correct treatment of fast mode ARFs Marcus G. F. Kirsch, G. Schoenherr, E. Kendziorra,
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting Mallorca
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Energy calibration refinement of the EPIC-pn Burst mode M.G.F. Kirsch 1, E.
XMM Bruno Altieri -- SCI-SDX EPIC astrometry update EPIC CAL/OPS meeting Vilspa, March 2003 B. Altieri.
1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Ops. AGENDA Operations status and.
Martin Stuhlinger X-Ray Universe 2005, Sep.26-30, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
Column rejection in the MOS  The core of soft sources is removed by the standard emchain.  Due to very large fluctuations in count rate from one column.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha PALERMO 11/04/07.
XMM EPIC MOS Andy Read EPIC CAL/OPS Meeting MPE, Germany 04-05/05/06 EPIC BGWG XMM-Newton EPIC BackGround Working Group founded (~1.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Long term EPIC in-orbit calibration plan Marcus G. F. Kirsch.
RGS/MOS-cooling Results February 03, 2003 L. Metcalfe 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton.
XMM EPIC MOS Steve Sembay Mallorca 06/11/07 Report on three NRCO calibration observations On axis observation of absorbed Seyfert.
XIS FM sensors cal. report Hiroshi Nakajima XIS
Cross-Calibration between XMM-Newton and Chandra Herman L. Marshall Chandra X-ray Center, MIT Kavli Institute.
Development of CCDs for the SXI We have developed 2 different types of CCDs for the SXI in parallel.. *Advantage =>They are successfully employed for current.
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Status of the EPIC calibration Presentation for XMM Newton UG 18 May 2006 Marcus.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, April 2008.
Date of download: 6/2/2016 Copyright © 2016 SPIE. All rights reserved. View of the XMM-Newton spacecraft subsystems, with external shrouds and structure.
X-Ray Binary Light-Curve Analysis in optical and x-ray or “the ‘crazy’ LMXB (low mass x-ray binary) EXO “ Trainee: Alexander Kolodzig Origin:
EVALUATION OF THE XMM NEWTON CROSS CALIBRATION ARCHIVE
Health and cleanliness of the XMM-Newton science payload since launch
EPIC Calibration & Operations Meeting
Tony Abbey – University of Leicester
Update of EPIC pn long-term monitoring
Long-term trends in EPIC pn energy response
Presentation transcript:

XMM 1 EPIC MOS Monitoring

XMM-Newton 2 Martin Stuhlinger, ESAC MOS Bad Pixel Monitoring

XMM-Newton 3 Martin Stuhlinger, ESAC MOS Background Monitoring

XMM-Newton 4 Martin Stuhlinger, ESAC MOS Serial CTI (Al)

XMM-Newton 5 Martin Stuhlinger, ESAC MOS Parallel CTI (Al)

XMM-Newton 6 Martin Stuhlinger, ESAC MOS1 Parallel CTI CCD1

XMM-Newton 7 Martin Stuhlinger, ESAC MOS2 Parallel CTI CCD1

XMM-Newton 8 Martin Stuhlinger, ESAC Conclusions Bad pixel situation is still stable on low level. Possible adjustment of background: decrease fixed-offset table of several CCDs by 1 ADU to compensate long-term drift. Serial CTI stable since cooling except MOS2 CCD7. Parallel CTI stable since cooling. Science ~rev. 700 parallel CTI nearly constant. Current CTI model still valid.