GLAST LAT Project LAT Monthly Apr 14 2004 - SAS 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope WBS 4.1.D SAS LAT Monthly Managerfest.

Slides:



Advertisements
Similar presentations
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
Advertisements

GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.
GLAST LAT ProjectLAT Face to Face, July 17-18, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
GLAST LAT ProjectLAT Operations Planning, 23 March GLAST Large Area Telescope LAT Operations Planning 23 March 2005 Rob Cameron
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 4.3 Pipeline, Data Storage and Networking Issues1 Gamma-ray Large.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Section Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review 7.2.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project Technical/Cost/Schedule Review 09/01/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
GLAST LAT Project ISOC Subsystem1 Response to Peer Review RFA 6  Request: –Need to provide more information on the planned and actual staffing profiles.
R.Dubois Sim/Recon Overview 1/10 GLAST LAT ProjectSoftware Workshop July, SLAC Sim/Recon Overview Elements of Simulation/Reconstruction Development,
Continuous Delivery Ajey Gore Head of Technology ThoughtWorks India.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
GLAST LAT ProjectMonthly Status Review - ISOC, 1 September GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status.
1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Overview of activities of the first six months and of the.
GLAST Large Area Telescope:
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
LAT HSK Data Handling from B33 Cleanroom. ISOC Software Architecture.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST Science Support CenterJuly, 2003 LAT Ground Software Workshop Status of the D1 (Event) and D2 (Spacecraft Data) Database Prototypes for DC1 Robert.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
DEPLOYMENT AUTOMATION & CONTINUOUS DEPLOYMENT Szymon Pobiega.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review.
GLAST LAT Project Technical/Cost/Schedule Review 04/26/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project 1S. Ritz Data Challenge Planning Overview Purpose Boundary conditions Plan: –scope and progression of data challenges –schedule summary.
GLAST Mission - LAT ProjectDOE/NASA Review March 31, 2004 Section ISOC 1 GLAST Large Area Telescope: ISOC Subsystems WBS: 4.1.B David Lung Stanford Linear.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
Mission Status - S. Ritz 1 GLAST The Gamma-ray Large Area Space Telescope Mission Status DC2 Kickoff 1 March 2006 S. Ritz Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois1 Schedule Balloon Science Tools, Analysis Platforms Calibrations Performance Tuning, Tracking Data Production.
GLAST LAT Project CAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT Project SLAC-NRL Data Connection for GLAST Environmental Test 3/15/05 1 GLAST Large Area Telescope: SLAC – NRL Data Connection for the GLAST.
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
GLAST Science Support Center May 8, 2006 GUC Meeting AI#28. SAE Release Schedule David Band (GSSC/JCA-UMBC) Julie McEnery (GSFC)
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope:
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope
March ’05 Face to Face Meeting Introduction
GLAST Large Area Telescope
GLAST Large Area Telescope Instrument Science Operations Center
Presentation transcript:

GLAST LAT Project LAT Monthly Apr SAS 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope WBS 4.1.D SAS LAT Monthly Managerfest Richard Dubois LAT SAS Subsystem Manager

GLAST LAT Project LAT Monthly Apr SAS 2 March - April Accomplishments Flight Integration Support front and center –Current version of GlastRelease under test by I&T –System tests under construction; unit tests on LDFreader –Investigating bug/issues tracker to have in time to support config control of SAS tools –Working with Eduardo on delivery of calibration algorithms (end May) –Agreement from subsystems on update of geometry doc. –Calibration update user interface on track OPUS pipeline –Database updating code done –Now working on batch interface/monitoring –One week slip expected to 1st week May Refocused SciTools architecture design post DC1 –First iteration of architecture done –Developer walkthrough held last week Starting HEASARC Network Monitoring with SLAC Computing Center –Now identified machine inside HEASARC to do file transfer tests Thanks to Al Vernacchio for intervention! –Will provide long term understanding of file transfer speeds and reliability –Ground Systems proposing FastCopy as commercial tool for transfer We offered SLAC’s bbcp as an alternative to consider

GLAST LAT Project LAT Monthly Apr SAS 3 Getting to End of May I&T stuff ready to try –Sim/recon, calib algs and infrastructure, pipeline Investigating new technology for next iterations of major infrastructure products –Application servers; web services; Java; Enterprise Java Beans etc –In widespread commercial use; passed us by SLAC data server OPUS pipeline Release Manager System Tests –System tests are being used as proof of principle “traditional” implementations of the others will be supported for I&T with transitions when sensible/transparent Get bug/issues tracker in place Initiate users windows server at SLAC

GLAST LAT Project LAT Monthly Apr SAS 4 Key Milestones  End May – first delivery of SAS tool to I&T  Early June – kickoff I&T Analysis Workshop  Mid (?) July – 2 nd Analysis workshop  Aug 4 – ISOC CDR  Aug GSDR  September - first hardware data analysis  Early 2005 – DC2 (depends on Flight Int work load)

GLAST LAT Project LAT Monthly Apr SAS 5 Issues & Concerns  Delivery of calibration algorithms  Working with subsystems to make sure an adequate set happens  OPUS operating (have 3 weeks float to end May deadline)  Should be plenty of float for actual hardware  ScienceTools taking back seat; prep for DC2 will be harder if Flight Int takes significantly more resources  Need to know what support is needed from SAS for NRL env testing; Spectrum Astro, KSFC. “Porta-farm”?  Need to start ramping up compute resources at SLAC next FY  Is there money?