14 July 2003M. Oreglia1 This will be a very brief report on the various scope activities US Scope paper European Scope draft International Parameters Committee.

Slides:



Advertisements
Similar presentations
ILCSC Report KILC12 / Daegu Jonathan Bagger Chair, ILCSC Johns Hopkins University 4/23/12.
Advertisements

After ISS Where Do We Go From Here?. 21 August 2006P Dornan - After ISS2 Next - until the end of 2006  Produce the ISS Report - with the present team.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
1 14. Project closure n An information system project must be administratively closed once its product is successfully delivered to the customer. n A failed.
Paris 22/4 UED Albert De Roeck (CERN) 1 Identifying Universal Extra Dimensions at CLIC  Minimal UED model  CLIC experimentation  UED signals & Measurements.
Machine-Detector Interface MDI Panel Report MDI Panel is one of several World-Wide Study (WWS) panels (R&D, Detector costing, MDI, 2 IRs) Interim panel.
International collaboration in high energy physics experiments  All large high energy physics experiments today are strongly international.  A necessary.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
Energy and Luminosity reach Our charge asks for evaluation of a baseline machine of 500 GeV with energy upgrade to about 1 TeV. (the “about” came about.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Report from ILCSC Shin-ichi Kurokawa KEK ICFA Seminar Daegu, Korea September 29, 2005.
ICFA Report to KILC12 January 2011 to April 2012 Pier Oddone – ICFA Chair Pier Oddone; 23 April 2012ICFA Report to KILC121.
ILCSC Review of ILCSC Parameters Subcommittee Report Parameters subcommittee of the ILCSC Dongchul Son Center for High Energy Physics Kyungpook National.
Opening Remarks: ICFA and Governments Presented at Special Evening Forum By Jonathan Dorfan.
Message from ACFA Chair C.Zhang IHEP CCAST ILC Accelerator Workshop and First Asian ILC R&D Seminar under JSPS Core University November 5, 2007.
FZÚ, J. Cvach, LCWS051 LCWS 05 1.LHC a ILC 2.Top 3.Higgs 4.Polarizace.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
The time line Autumn 2011CERN Council initiated an update exercise to the European Strategy for Particle Physics which was approved by a special Council.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
Parameters 2003 mandate questions to working groups summary of answers preliminary conclusions R.-D. Heuer for the members of the ‘parameter group’ : S.
Understanding Matter, Energy, Space and Time: The Case for the e  e  Linear Collider  Document produced at the instigation of the World Wide Study of.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
1 Tunnel implementations (laser straight) Central Injector complex.
Trilinear Gauge Couplings at TESLA Photon Collider Ivanka Božović - Jelisavčić & Klaus Mönig DESY/Zeuthen.
THE INTERNATIONAL COMMITTEE FOR FUTURE ACCELERATORS (ICFA) Roy Rubinstein2nd International Conference on New Frontiers in Physics - 4 September
Report from ILCSC Shin-ichi Kurokawa ILCSC Chair LCWS06 at IISc Bangalore March 9, 2006.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
Recent news from CLIC C&S WG and CLIC-ILC WG on General Issues Ph. Lebrun CLIC Project Meeting 1 June 2011.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
David Miller; charge to the Prague ECFA/DESY workshop 15/11/ Charge to the Workshop.
1 GUTs and Branes DESY Theory Workshop 2003 A brief introduction to the future of particle physics at DESY Albrecht Wagner Hamburg, 23 September 2003.
1 Physics Input for the CLIC Re-baselining D. Schulte for the CLIC collaboration.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
1J. Brau - ILCSC Meeting - Beijing - August 19, 2004 Organizing the Global Experimental Program The ILCSC has asked the Worldwide Study, as its Physics.
CLIC Energy Stages Meeting D. Schulte1 D. Schulte for the CLIC team.
Nick Walker AD&I WebEx Meeting TeV Upgrade Study AD&I WebEx Meeting Nick Walker 1 Brief summary of ALCPG’11 discussions.
Status and plans for role of Japan in HL-LHC Katsuo Tokushuku Institute of Particle Nuclear Studies (IPNS) High Energy Accelerator Research Organization.
IWLC10, Geneva, 20/10/10 Gudrid Moortgat-Pick 1 Impact of polarized positrons for top/QCD and electroweak physics Gudrid Moortgat-Pick Hamburg University.
9/17/041 The International Linear Collider Michael Witherell Presentation to The Funding Agencies for a Linear Collider September 17, 2004.
A Linear Collider Run Scenario Choose a physics scenario that is CONSERVATIVE in the sense that it has many particles and thresholds to explore. Assume.
LC Scope: European View 1- Scope document should define a parameter set for a Linear Collider to be used as the European input to the world wide scope.
Physics Questions Committee Status Report Brian Foster (Oxford & GDE) SB2009 Meeting DESY 2/12/09.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
Questions from the CLIC accelerator team (D. Schulte, LCD “monthly” 25 Feb. 2013) -> a first attempt to answers 1 25 March 2013.
On the possibility of stop mass determination in photon-photon and e + e - collisions at ILC A.Bartl (Univ. of Vienna) W.Majerotto HEPHY (Vienna) K.Moenig.
Calibration of energies at the photon collider Valery Telnov Budker INP, Novosibirsk TILC09, Tsukuba April 18, 2009.
ICFA Report to New Frontiers in Physics January 2011 to April 2012 Pier Oddone – ICFA Chair Pier Oddone; June 15, 2012New Frontiers in Physics1.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
LumiCal background and systematics at CLIC energy I. Smiljanić, Vinča Institute of Nuclear Sciences.
1 ILC Physics DCR Yasuhiro Okada (KEK) on behalf of the editors for DCR Physics Part, Abdelhak Djouadi, Joe Lykken, Klaus Moenig,Yasuhiro Okada, Mark Oreglia,
Backup slides Z 0 Z 0 production Once  s > 2M Z ~ GeV ÞPair production of Z 0 Z 0 via t-channel electron exchange. e+e+ e-e- e Z0Z0 Z0Z0 Other.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Please check out: K. Ohmi et al., IPAC2014, THPRI003 & THPRI004 A. Bogomyagkov, E. Levichev, P. Piminov, IPAC2014, THPRI008 Work in progress FCC-ee accelerator.
1 Gamma Gamma Collider Physics Report Tim Barklow SLAC Apr 18, 2009.
11/18/2008 Global Design Effort 1 Summary for Gamma-Gamma Mayda M. Velasco Northwestern University November 20, 2008 LCWS08 -- UIC, Chicago.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
WG1: Overall Design personal highlights report by Nick Walker First project meeting 2/12/2004 conveners: Kiyoshi Kubo (KEK) Tor Raubenheimer (SLAC)
Effect of changes for running at lower energies following the Physics Questions Committee’s Status Report provided to the SB2009 Working Group of Detector.
ILC - Upgrades Nick Walker – 100th meeting
Input to Strategy currently planned
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Snowmass on the Mississippi
Yasuhiro Okada, Executive Director, KEK
Presentation transcript:

14 July 2003M. Oreglia1 This will be a very brief report on the various scope activities US Scope paper European Scope draft International Parameters Committee … very recent progress! The LC Machine Scope Documents: Mark Oreglia The University of Chicago

14 July 2003M. Oreglia2 Brau’s Alphabet Soup To facilitate basic actions, 3 regions generate inputs: –America (HEPAP), Asia (ACFA), Europe (ECFA) Regional groups each decide what LC parameters they each want Then the International Steering Ctte takes this regional input, makes choices and takes political actions Organizations: –International Linear Collider Steering Committee (ILCSC) WW parameters committee Worldwide Study of Physics & Detectors … 3 regional ctte’s LHC/LC Physics study group (G. Weiglein) –US LC Steering Group (USLCSG) Led by lab directors (Dorfan currently chairing) American Linear Collider Physics & Detector Group (ALCPG) –Executive Ctte

14 July 2003M. Oreglia3 Machine Scope Documents The “scope papers” are the requisite white papers needed to justify a new machine –The American and European papers have been issued –An ILC committee has been established to unify them Asian input via this ILC Committee Our precursor: –“Item 2 of the ILCSC Mandate calls for an early consensus on the scope of the facility in terms of physics capability. Thus it seemed natural to think about a subcommittee that would aid this function…. –This is the “consensus document” you were asked to consider signing to show community support for LC

14 July 2003M. Oreglia4 Intent of the US Scope Paper In June the USLCSG asked that the ALCPG write a white paper describing the physics-motivated machine parameters … –A document the machine planners can start using now –A document to define the goals before funding agencies The Executive Committee used the “Orange book” and input from the working groups to: –define the minimal acceptable parameters –prioritize options –not an instrument to choose technology “Design Considerations for an Int’l LC” (

14 July 2003M. Oreglia5 Document Structure Brief (12 pgs) and to the point Summarizes the physics driving the parameters Does not suggest a technology choice –… and no parameters suggest one Authored by the ALCPG Executive Ctte + some key WG leaders Drafts were reviewed by the USLCSG and all the WG leaders; penultimate draft was presented at Arlington After final approval by the USLCSG, the US scope paper was released and will be considered the US input to the International Scope Ctte Physics IntroMachine-Detector Issues Initial Energy and Luminosity Z Running Beam PolarizationEnergy upgradeability IP ConfigurationsCollision Options

14 July 2003M. Oreglia6 Initial Energy and Luminosity Initial Energy: GeV at 2×10 34 cm -2 s actually, we also state this in integrated lumi –Higgs: Precision EW Higgs range m h = GeV –peak  energy suggests E ~ 400 GeV H self-coupling: need ~ 500 GeV WW fusion production requires 500 GeV 5% Statistics for precision measurements threshold scan requires longer run –SUSY: pair production grounds for emphasizing 500 GeV and higher –Extended Models Same luminosity serves well in large class of models –Polarization: 80% on e - initially. Positron polarization later???

14 July 2003M. Oreglia7 Ultimate Energy A difficult item to justify; 800 GeV? 1000 GeV? 1300 GeV? I think all of us are convinced ≥1 TeV is required –SUSY spectra in many benchmarks –Current views on SSB from lattice calculations –Higgs self coupling is a must-do! –MSSM Higgs spectra –Dynamical SB scenarios are high-energy scale The LC will be the frontier machine after LHC –we make a strong case for E upgrades/longevity –table of physics-return versus E and integrated lumi Thus, a case is made for > 1 TeV upgrades –Perhaps energy – luminosity tradeoff is the answer here

14 July 2003M. Oreglia8 Interaction Regions We make the case for 2 interaction halls (but not 2 detectors!) –The obvious benefits from 2 detectors cross checking; competition; broader physics; specialization –Efficient staging area for repair or specialized function –Necessary for , e - e - options

14 July 2003M. Oreglia9 Z Running Calibration: This is STILL one of the debated points! –How much calibration running is necessary at the Z? –Good calibration essential for precision EW –Is this an absolute requirement? How much? Can’t we use Z,W production at higher energies? –Working Groups: now is STILL the time for more work! Giga-Z remains an upgrade option –Depends on what new physics is discovered –Requires positron polarization, extreme E resolution –Not discussed at length Despite uncertainties, a scenario for Z-pole, WW running must be there!

14 July 2003M. Oreglia10 Collision Options We discuss the highly desirable options , e - e - –Strongly endorsed and impacts IP design –Physics: Production cross sections H  coupling Measure CP assignments Rare decays Sensitivity to extended models

14 July 2003M. Oreglia11 How Machine Parameters Affect the Detector Crossing angle: –Beam instrumentation possible or greatly enhanced Better average energy measurement Polarization measurement Beam halo and stay-clear affect detector Beamstrahlung: –Warm/cold really pretty similar here –argument of larger e + e - background not compelling Bunch structure and timing: –Warm/cold have major difference in duty cycles, readout time. –Pros and cons for both technologies; probably no showstoppers

14 July 2003M. Oreglia12 The ECFA Scope Document Physics arguments for the parameter values may be found in the TESLA TDR, in the contributions to the ECFA/DESY Extended Study and in the document from the World Wide Study Group ("Understanding Matter, Energy, Space and Time: The Case for the e+e- Linear Collider" Phase 1 –A cms-energy range of 91 to 500 GeV –At 500 GeV instantaneous luminosity and reliability sufficient to deliver a total of some 500 fb-1 in the first 4 years of running –tunnel and floorspace available for two interaction regions, at least one of them with finite crossing angle, and at least one fully functional detector –both interaction regions allowing the same energy range and luminosity for e+e- collisions –80% electron polarisation –capability to run e-e- experiments –possibility to get to higher energies (some 750 GeV cms) without increasing cooling and RF power, i.e., with reduced luminosity at increased gradient Priorities on the options listed below will depend on the results obtained from LHC and the first phase LC. Options –positron polarisation of some 60% –high luminosity 'low energy' running (i.e. running at the Z-pole and WW threshold) with at least 50 fb-1/year and with e- and e+ polarisation at the Z-pole –cms-energy upgradeable to approximately 1 TeV, but at least 800 GeV –integrated luminosity approximately 500 fb-1/year at the high energy –γγ, eγ laser facility with Lumi(γγ) = Lumi(e+e-)/2

14 July 2003M. Oreglia13 1.Engage in outreach, explaining the intrinsic scientific and technological importance of the project to the scientific community at large, to industry, to government officials and politicians and to the general public. 2.Engage in defining the scientific roadmap, the scope and primary parameters for machine and detector. It is particularly important that the initial energy, the initial operations scenario and the goals for upgradability be properly assessed. 3.Monitor the machine R&D activities and make recommendations on the coordination and sharing of R&D tasks as appropriate. Although the accelerator technology choice may well be determined by the host country, the ILCSC should help facilitate this choice to the largest degree possible. 4.Identify models of the organizational structure, based on international partnerships, adequate for constructing the LC facility. In addition, the ILCSC should make recommendations regarding the role of the host country in the construction and operation of the facility. 5.Carry out such other tasks as may be approved or directed by ICFA. Mandate of the ILCSC (Chair: Tigner)

14 July 2003M. Oreglia14 The ILC Parameters Ctte Rolf Heuer, Chair; Paul Grannis, Sachio Komamiya, Mark Oreglia, Francois Richard, Dongchul Son Charge: The Parameters Subcommittee has been set up by the ILCSC and will report to it, the first report being expected at the meeting in August during the 2003 Lepton Photon Conference. The group comprises two members each from Asia, Europe and North America. It shall produce a set of parameters for the future Linear Collider and their corresponding values needed to achieve the anticipated physics program. This list and the values have to be specific enough to form the basis of an eventual cost estimate and a design for the collider and to serve as a standard of comparison in the technology recommendation process. The parameters should be derived on the basis of the world consensus document “Understanding Matter, Energy, Space and Time: The case for the e+e- Linear Collider” using additional input from the regional studies. The final report will be forwarded to the ILCSC for its acceptance or modification by mm/yyyy (month and year). The parameter set should describe the desired baseline (phase 1) collider as well as possible subsequent phases that introduce new options and/or upgrades. For all phases and options/upgrades priorities should be discussed wherever possible and appropriate, and the description should include at least the following parameters: Operational energy range Minimum top energy Integrated luminosity and desired time spent to accumulate it, for selected energy values (e.g. at the top energy, at the Z-pole, at various energy thresholds … ) Polarisation and particle type for each beam Number and type of interaction regions The committee may include any other parameter that it considers important for reaching the physics goals of a particular phase, or useful for the comparison of technologies, subject to the approval of the ILCSC.

14 July 2003M. Oreglia15 Our First Meeting Was Today First thoughts on parameters –should be as specific as possible –We should not repeat physics justification where we can refer to world wide accepted documents or statements. –For all other cases we have to justify our choices. Disclaimer: not appropriate to release all the details of our discussion We will describe 3 categories: –Baseline: the initial 4-6 year program –Upgrade: the energy upgrade (a given!) –Options: running and modifications we might want to do Schedule: next meeting at LP03; draft document a month later

14 July 2003M. Oreglia16 Baseline This discussion converged quickly top energy 500 GeV; polarized electrons energy range for physics (i.e. high lumi running) GeV Questions –Discuss Z, WW scan as baseline? Probably will be an option. Linked to positron polarization, energy resolution –specify ∫Ldt at 500 GeV equivalent? –how to treat commissioning time? –specify ∫dt and/or L? Justification ? –4 years to get 500 fb -1 ; another 500 in next 2 years –E scan capability and requirements –Number of interaction regions, number of detectors ??? –Statement of crossing angle tradeoffs and need for more study –Running at higher E at reduced luminosity … part of baseline? –Z calibration…statement about changeover time Open question: statement about energy spread???

14 July 2003M. Oreglia17 The Energy Upgrade It is inconceivable we would not want to run at maximum energy, so this upgrade is a given in the timeline The big question: what energy to state? –Vicinity of 1 TeV? At least 800 GeV??? Conservative integrated lumi specified over 3 year period Capability to do E scans Capability to go back down to lower energy at good luminosity

14 July 2003M. Oreglia18 Options Positron polarization –Minimum level (60%?) –State maximum tolerable lumi loss –For all energies –Case for Transverse polarization GigaZ; WW scan –State conditions for useful running Positron polarization Beam energy resolution Physics need  /e  /e - e - –all energies above 200 GeV

14 July 2003M. Oreglia19 Timeline We want to proceed swiftly on this –Few controversies Aiming for draft document by late August –We should be in good shape during LP03 What happens next? –Comments solicited from WG leaders and regional Steering Groups –ILCSC decides how to implement the document