October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 1 Quality Assurance Test Stand University of Rochester oQTC at Rochester,

Slides:



Advertisements
Similar presentations
Measurement of Light Transmission in Radiation Damaged Glued Quartz Bars for Q weak KATIE KINSLEY (Department of Physics, Ohio University, Athens, OH 45701)
Advertisements

Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
Probestation 1: 6“ (200mm * 300mm + 360° rotation + 15mm Z) QTC Instruments: HP4274A (LCR), K6517 (electrometer), HP6614C (voltage supply), K595 (quasistatic.
128 September, 2005 Silicon Sensor for the CMS Tracker The Silicon Sensors for the Inner Tracker of CMS CMS Tracker and it‘s Silicon Strip Sensors Radiation.
Chapter 15 Design, Coding, and Testing. Copyright © 2005 Pearson Addison-Wesley. All rights reserved Design Document The next step in the Software.
Sensor meetingF. Hartmann 1 Status report St & HPK plus add. Scratch tests. IEKP – University of Karlsruhe Frank Hartmann.
CMS week – December 8-12, TOB sensor quality Regina Demina University of Rochester.
Workshop on CMS irradiation sensor Qualification&Assurance 1 Final set of measurement for the irradiation quality assurance. What test do we need? EFFICIENT.
PowerPoint Presentation for Dennis, Wixom & Tegarden Systems Analysis and Design Copyright 2001 © John Wiley & Sons, Inc. All rights reserved. Slide 1.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
6/22/2015Tracker Week April 2002IEKP 1 Summary of IQC-workshop IEKP - Universität Karlsruhe (TH)
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
1/13/2004USCMS Tracker Meeting Sergey Korjenevski U of R Status Report IV curve and “second kink” QA stand status - R poly measurement has been debugged.
CMS Tracker Week – L3 Meeting – April 2003 – Patrick Gartung 1 UC Riverside Testing Facilities Patrick Gartung University of California, Riverside.
Implementation. We we came from… Planning Analysis Design Implementation Identify Problem/Value. Feasibility Analysis. Project Management. Understand.
Advanced Digital Circuits ECET 146 Week 3 Professor Iskandar Hack ET 221B,
October 2001General Tracker Meeting IEKP - Universität Karlsruhe (TH) 1 Results on proton irradiation tests in Karlsruhe F. Hartmann IEKP - Universität.
Institute of Physics ASCR, Prague Strip Sensors R&D for SCT and ITk Marcela Mikeštíková.
Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, out of 23 Status update and Test results for Run2b Si sensors at KSU Sergey.
Therac 25 Nancy Leveson: Medical Devices: The Therac-25 (updated version of IEEE Computer article)
FCS - AAO - DM COMPE/SE/ISE 492 Senior Project 2 System/Software Test Documentation (STD) System/Software Test Documentation (STD)
WP3 10 July 2014 QMUL/GAB 1 Status of Sensor Testing Setup at QMUL Re-structuring of QMUL Physics & Astronomy June/July 2013: Evacuated Physics building.
February, 2004CMS Tracker Week1 Sensor Stability Measurements Objective: find simple method of observing sensor stability -> measure fluctuations in overall.
Temperature dependence of sensor leakage current Contents Introduction Measurement Result Summary Junkichi Asai (RIKEN BNL Research Center) (Hiroki kanoh.
1 Plans of Vienna SLHC Proposal Workshop 20. February 2008.
Characterization Lab Policy M. A. Alam April 24, 2012.
4 May 2010 Thomas Bergauer (HEPHY Vienna) Testing of Test Structures in Vienna CMS Sensor-TUPO.
Slide 1 Construction (Testing) Chapter 15 Alan Dennis, Barbara Wixom, and David Tegarden John Wiley & Sons, Inc. Slides by Fred Niederman Edited by Solomon.
Sergey Korjenevski KSU DØ Run2b Silicon meeting, Oct 10, Preliminary testing results of Elma and HPK sensors Sergey Korjenevski Kansas State University.
Quality Test of L1 sensors HPK 10 sensors –Tested all, 6 sent to Fermilab – Test structures, HPK 133 L00 CDF ELMA 9 sensors –Tested 6 of 9.
Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 Status of Process Qualification Centers Florence, Strasbourg, Vienna.
CMS Sensormeeting : Probestation 1: 6“ (200mm * 300mm + 360° rotation + 15mm Z) Mechanical Assembly ready Instruments: LCR, Electrometer, PS, Quasistatic.
2004/09/07 Junkichi Asai (RBRC) (Kieran Boyle (SBU))
Panja Luukka1 Silicon beam telescope for CMS SLHC detector studies (SiBT Panja Luukka, Sandor Czellar, Jaakko Härkönen, Eija Tuominen, Jorma.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
Examples and disciptions for measurements On pixel and strip sensors.
Matthias Bergholz DESY Zeuthen 1 Mpix Sensors.
PLATE CHANGER for OIL microscopes Gabriele Sirri INFN Bologna for INFN Bologna and LNGS.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Summary of Si Strip Group QA Preparation & Schedule and Costs Abhay Deshpande Stony Brook University PHENIX VTX Detector Readiness Review Brookhaven National.
Testing Site Qualification Purpose: –Perform detailed scans of the silicon microstrips to make sure they all work. –Check HPK. Candidates for Certification:
Biology 11 – Mr. Penton LAB WRITING.
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
DOE Rev of Run IIb Sep 24-26, Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University Frank Lehner University.
Panja Luukka1 Silicon beam telescope (SiBT) and MCz detectors: status and plans for 2008 Erkki Anttila, Sandor Czellar, Jaakko Härkönen, Matti.
8. February 2012 Thomas Bergauer (HEPHY Vienna) SVD Construction Database SVD-PXD meeting.
1 Silicon Testing at KSU Sergey Korjenevski Kansas State University 06/18/2002 (11 slides total)
Update of CMS Process Quality Control Sensor Meeting, CMS TK Week, , CERN Florence Anna Macchiolo Carlo Civinini Mirko Brianzi Strasbourg Jean-Charles.
1 Device Simulations & Hardware Developments for CBM STS Sudeep Chatterji CBM Group GSI Helmholtz Centre for Heavy Ion Research CBM Collaboration Meeting,
A Clustering Algorithm for LumiCal Halina Abramowicz, Ronen Ingbir, Sergey Kananov, Aharon Levy, Iftach Sadeh Tel Aviv University DESY Collaboration High.
Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 1 DØ Inner Layer Sensor Production Readiness Review August 08, 2003 M. Demarteau for the.
Paul Dolejschi Progress of Interstrip Measurements on DSSDs SVD.
Run Iib Workshop Dec 12-13, 2002 Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University.
Phase 2 Production Discussion We would like to review the conclusions reached at Caltech on US involvement in the phase 2 outer tracker This will be presented.
Production Readiness Review of L0/L1 sensors for DØ Run IIb R. Demina, August, 2003 Irradiation studies of L1 sensors for DØ 2b Regina Demina University.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
Prospects for Integrating Veloroot into GAUDI D. Steele - 24/11/1999.
10 October 2003, FCM, Krakow Michal Tomášek, Institute of Physics AS CR 1 Michal Tomášek, Václav Vrba Institute of Physics, AS CR, Prague Measurements.
Paul Dolejschi Characterisation of DSSD interstrip parameters BELLE II SVD-PXD Meeting.
EUDET FP7 brainstorm EUDET-JRA2 Jan Timmermans. My personal opinion…. I would be in favour of waiting till next call Because “grand” particle physics.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Karlsruhe probe equipment and QA proposals/expertise
Status of PQC Florence, Strasbourg, Vienna
Results from module testing
IEKP - Universität Karlsruhe (TH)
Module production in Italy
CORRELATION BETWEEN LEAKAGE CURRENT AND NOISE
IEKP - Universität Karlsruhe (TH)
Presentation transcript:

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 1 Quality Assurance Test Stand University of Rochester oQTC at Rochester, NY What’s new compared to KSU  Vacuum Base Chuck Positioner  Extra switch to decouple guard box oTest crosscheck 5 Test Structures  Tested by Vienna, Karlsruhe QTC 2 OB2 sensors  Tested by Perugia QTC oHandling the results Data Base oConclusion, plans

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 2 Setup is completed Hardware is in place and operational. Software is working as well, - test results are consistent with other testing centers (more details later). Clean room is to be completed by 20 th of October.

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 3 Personnel Regina Demina (585) Thomas Ferbel (585) Elizabeth A. Groves (585) Sergey Korjenevski (585) David R. Martell (585) Daniel Schwaab (585)

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 4 List of the Equipment Probe Station Alessi REL in. guarded chuck, Semi-Auto Microscope Mitutoyo 2x 10x 20x, 10x Vacuum base positioners with 4 coax probes Needles diameter 5  m LCR HP 4284A V-source/Ammeter Keithley 237 and Keithley 487 Switching Matrix Agilent 34970A with two 8x4 switch 34904A Vibration-free table Kinetics 1201 Custom made dark box

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 5 New Features Solid stable location of the chuck positioner. Significant to ensure safety and helps to minimize noise

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 6 New Features New switch is added to discharge decoupling capacitors. Significant to ensure safety and helps to minimize noise.

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 7 Cross Check, - Full strip tests Two OB2 sensors, ST, tested by Perugia – – Test Structures, HPK – from Karlsruhe – from Karlsruhe – from Vienna – from Vienna – from Vienna

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 8 IV Test

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 9 IV Test

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 10 CV Test

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 11 CV Test

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 12 Strip tests - Leakage

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 13 Strip tests - Leakage

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 14 Strip tests - Rpoly

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 15 Strip tests - Rpoly

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 16 Strip tests - Cac at 100Hz

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 17 Strip tests - Cac at 100Hz

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 18 Strip tests - Idiel

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 19 Strip tests - Idiel

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 20 Data Base We were not able to simulate data handling with fictitious names though we believe our.xml format is correct. The problem may disappear as we proceed with real actions. Error: –“DB: ERROR: fatal error: 0RA-02291: integrity constraint (CMSTRKDB.REF_INPUT14) violated – parent key not found –ORA-06512: at “CMSTRKDB.STORED_FUNCTIONS”, line 788 –ORA-06512: at line 1 –…error goes on to list the text in the file. It is not just IV_TEST in particular. If this test is deleted and it goes straight to CV, the problem basically is repeated.

October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 21 Conclusions and Plans QTC at University of Rochester complies with CMS requirements to test Si detectors. Rate of the testing is estimated to be 2 OB2 sensors per day. Data Base remains an issue. The problem may disappear if everything is done in proper order using appropriate bar codes and all.