GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.

Slides:



Advertisements
Similar presentations
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Advertisements

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.
GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST Large Area Telescope - OperationsDOE Review, 15 June GLAST Large Area Telescope Operations Review Rob Cameron Instrument Science Operations.
SVAC/PVOC&A Meeting, February 6, 2006 Anders W. Borgland 1 Instrument Analysis Activities Anders W. Borgland Science Verification, Analysis and Calibrations.
SVACInstrument Analysis Meeting, August 5, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project Integration and Test SVAC Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review SVAC Peer Review July 21,
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
GLAST LAT ProjectSVAC Peer Review July 21, 2004 E. do Couto e Silva 1/100 GLAST Large Area Telescope: Overview I&T Science Verification Analysis and Calibration.
GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 1/19 Summary and Future Plans Eduardo do Couto e Silva Instrument Analysis.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 1/19 Introduction to the Workshop Series Eduardo do Couto e Silva Instrument.
GLAST LAT ProjectOnline Peer Review – July 21, – Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project Managers F2F 6/15/ Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
GLAST LAT ProjectIA Meeting – June 17,2005 E. do Couto e Silva 1 New additions to the main page.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 E. do Couto e Silva 1 Final Data Taking with SLAC (Data for Instrument Analysis Workshop 7) Eduardo do.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
The CU Beam Test at CERN Status Report and highlights from workshop II Luca Latronico LAT C&A Meeting May
GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 1 Gamma-ray Large Area Space.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project LAT Monthly Apr SAS 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope WBS 4.1.D SAS LAT Monthly Managerfest.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
R.Dubois Sim/Recon Overview 1/10 GLAST LAT ProjectSoftware Workshop July, SLAC Sim/Recon Overview Elements of Simulation/Reconstruction Development,
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectTracking Software Week – Pisa – 20 May 2002 R.Dubois1 SAS Overview Overall Data Flow Sim/Recon –Gleam –Recon rewrites –Calibrations Level.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project Technical/Cost/Schedule Review 04/26/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project 1S. Ritz Data Challenge Planning Overview Purpose Boundary conditions Plan: –scope and progression of data challenges –schedule summary.
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 1 GLAST Large Area Telescope: TKR.
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
X. Chen 1 GLAST LAT Project EM data analyses meeting X. Chen 1 Software infrastructure used in EM data analyses Xin Chen November 19, 2003.
GLAST LAT Project Instrument Analysis Workshop September 27, 2004 E. do Couto e Silva 1/11 Overview of the Instrument Analysis Workshop Series Eduardo.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
LAT Instrument Test Data Analysis in Context
I&T&C Organization Chart
Integration, Test, and Calibration
GLAST Large Area Telescope:
GLAST Large Area Telescope Instrument Science Operations Center
Overview of Instrument Analysis Effort
Instrument Analysis Workshop Series
GLAST Large Area Telescope
Overview Goal Study GEM variables in SVAC ntuple
08:00 Meeting Schedule TEM-PS test completed on Friday Sept. 26; baseline, test, and post-test data are burned to CD-ROM CAL cosmic data taking started.
Calibration and Analysis Methods Group Report
SAS Overview The Big Picture
Mini Tower Preliminary Results
Integration and Test Organization Chart
Introduction and Overview
Status Report and highlights from workshop II
GLAST Large Area Telescope
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope: Deputy for Systems Engineering
Presentation transcript:

GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004

GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 2/5 Software Workshop at NRL Discussions and presentations on several tasks related to CAL reconstruction. Priorities and group responsibilities are being re-assigned. Presentations on data analysis and calibrations from GSI and SLAC EM data Discussions on inflight calibrations with GCR Preliminary report of failure mode analysis (impact on CAL performance) Flight Integration (4 hour discussions) –Following algorithms from SVAC-Plan LAT-MD will be delivered by NRL to I&T by the end of May: C14, C15, C18, C19/20 –Another version will follow using TKR information for CAL Calibrations –CAL requests a couple of days (TBR) of muon data taken for calibrations when LAT is assembled. Productive meeting. Strong support from Neil Johnson and Richard Dubois

GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 3/5 Science Verification, Analysis, and Calibration (SVAC) - Roadmap Integration Readiness Review 7/8/04 SVAC Database and Calibration trending (March - July) SVAC Acceptance and Test of SAS Algorithms (May - July) 1 & 2 Tower Geometry (April – May) SAS Calibration Algorithms (May) SAS Database (May) SAS Pipeline Infrastructure (March - April) MC Datasets 1 & 2 tower (May) SAS Geometry Review (April) SVAC Data Pipeline (May-June) EM 1 data analysis (March - May) EM 2 data analysis (April - June) SVAC Workshop (June) Instrument Test Analysis (March – July)

GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 4/5 SVAC external dependencies SAS Algorithms –in progress by TKR and CAL, Xin working with ACD/SAS groups to bring ACD to the same level as TKR and CAL SAS Database –SAS is implementing some changes requested by I&T. SVAC has not spent sufficient time on this item yet. SAS OPUS Pipeline –SAS will be available for discussions with I&T 2 weeks from now (on schedule) SAS Geometry Review –Started discussions with NRL ONLINE/LDF –SAS reads ACD “data” from version V version and now starting to work with new release (V )

GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 5/5 Current work MC simulations –Generating MC for 2 towers –Studying variables and reconstruction code SVAC Database –Implementing library changes –Preparing for discussions with ISOC/SAS/Online –Discussed with CAL NRL –Will discuss with TKR when Hiro is back SVAC SLAC (June 7 and 8) –See next slide EM Data Analysis –Need to discuss with TKR possible charge sharing issues –Getting ready for ACD calibrations with 2 tiles –Expect Tune’s group to lead EM2 analysis Focus is on the SVAC workshop (feeling the pressure…) EM activities were bumped to lower priority

GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 6/5 LAT Contributed Effort Core and support people –Bordeaux –Benoit –GAM –Agnieszka? –GSFC –Julie –Luis –LLR –Pol? –SLAC –Anders –Dan –Eduardo –Heather –Leon –Mizuno –Tracy –Tune –Warren –Xin –UCSC –Bill People who expressed interest and should define how much of their time can be allocated for this effort –GSFC –Steve –LLR –Berrie –Pisa –Michael –Gary –SLAC –Johann –Hiro –Larry –Mutsumi –Richard –UCSC –Marcus