Proposal Presentation February 16, 2004 Justin Akagi EE 396 Marcus Suzuki EE 496 Brent Uyehara EE 496.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

EXTERNAL COMMUNICATIONS DESIGNING AN EXTERNAL 3 BYTE INTERFACE Mark Neil - Microprocessor Course 1 External Memory & I/O.
Final Year Project Progress January 2007 By Daire O’Neill 4EE.
Doc.: IEEE /0604r1 Submission May 2014 Slide 1 Modeling and Evaluating Variable Bit rate Video Steaming for ax Date: Authors:
NPSS Field of Interest History and Discussion. 2 The fields of interest of the Society are the nuclear and plasma sciences. The Society shall devote itself.
Critical Design Review March 13, 2004 Justin Akagi EE 396 Marcus Suzuki EE 496 Brent Uyehara EE 496.
Experimental Method Experimental Method Kihyeon Cho Kyungpook National University Spring Semester 2005 Experimental Method and Data Process.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
8th February 2011Electronics for Commissioning1 Signal characteristics. Readout & electronics overview. Plan.
Motion Tracking Recorder 360 (MTR-360) Group #1 Lee Estep Philip Robertson Andy Schiestl Robert Tate.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
Introduction We propose a design of Level-1 trigger and readout chain for the upcoming J-Parc experiment that supports trigger rates in excess of 100 KHz.
HiMax: Characterization of the CogniMem Device EE x96 Preliminary Design Review Advisor: Tep Dobry Sub Advisor: Neil Scott Members: Raymundo Flores EE.
CRAnE: A JAS-based Data Acquisition System for Cosmic Rays Jennifer Docktor & Manuel Reyes Mentors Tom Glanzman & Willy Langeveld August 13, 2003 Department.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
1 Project supervised by: Dr Michael Gandelsman Project performed by: Roman Paleria, Avi Yona 12/5/2003 Multi-channel Data Acquisition System Mid-Term Presentation.
Curry Mouse EE 296 Project Proposal Presentation February 11, 2006.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Remote Activation of Appliances Using USB Interfaces Vanessa Cox Chris Hydak Kaori Wada.
Final Presentation May 6, 2004 Justin Akagi - EE 396 Marcus Suzuki - EE 496 Brent Uyehara - EE 496 TURFPro.
ECE 353 Lab B (part 1 – Overview)
By Drudeisha Madhub Data Protection Commissioner Date:
High-Intensity Focused Ultrasound Therapy Array May1005 Alex Apel Stephen Rashid Justin Robinson.
PERSPECTIVES OF THE RADIO ASTRONOMICAL DETECTION OF EXTREMELY HIGH ENERGY NEUTRINOS BOMBARDING THE MOON R.D. Dagkesamanskii 1), I.M. Zheleznykh 2) and.
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
Reporter: PCLee. Assertions in silicon help post-silicon debug by providing observability of internal properties within a system which are.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
WaveSurfer 3000 Oscilloscopes Public Release – July 1 st, 2014.
Exploring the Cosmos with Neutrinos Aart Heijboer …all of them. nm
Amorphous Wire Localization Checkpoint Presentation April 18, 2001 Matthew Foy Richard Kao Matthias Ziegler.
Visual Basic for Applications The Datapump Board Jamieson Olsen.
Department of Electrical and Computer Engineering The Tektronix MSO4000 series of oscilloscopes are mixed-signal oscilloscopes that contain both digital.
Lab IV Lecture 1 Course Overview Introduce Step 1 Course Web Page:
1 Workshop 4 (A): Telemetry and Data Acquisition Mahidol University June 13, 2008 Paul Evenson University of Delaware Bartol Research Institute.
Understanding Data Acquisition System for N- XYTER.
1 A ROOT Tool for 3D Event Visualization in ATLAS Calorimeters Luciano Andrade José de Seixas Federal University of Rio de Janeiro/COPPE.
James Westover Dan Linford.  Background  Production and Lifetime  The Apparatus  Discussion of our procedure and results  Questions.
Universal Measurement System with Web Interface Maciej Lipiński Ph.D. Krzysztof Poźniak, MSc Grzegorz Kasprowicz Wilga r.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Cosmic Rays Cosmic Rays at Sea-Level - Extensive Air Showers and the detection of cosmic rays.
Time over Threshold electronics for an underwater neutrino telescope G. Bourlis, A.G.Tsirigotis, S.E.Tzamarias Physics Laboratory, School of Science and.
QuarkNet and Cosmic Ray Muon Flux Experiments Florida Academy of Sciences Spring Conference 2009 Alfred Menendez and Michael Abercrombie with Dr. Marcus.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Sampling chip psTDC_02 Jean-Francois Genat – Herve Grabas Mary Heinz – Eric Oberla 1/27/ psTDC_02 presentation.
P08311: FPGA Based multi-purpose driver / data acquisition system Sponsor: Dr. Marcin Lukowiak Team MemberDisciplineRole Andrew FitzgeraldCEProject Manager/FPGA.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
16 February 2011Ian Brawn1 The High Speed Demonstrator and Slice Demonstrator Programme The Proposed High-Speed Demonstrator –Overview –Design Methodology.
Notes on visit to Rome 28/04/2014 Christian Joram Szymon Kulis Samir Arfaoui.
Simple Circuits 1 st year physics laboratories University of Ottawa
Common Stages of Digital Debug Discover Your probes will affect your ability to accurately visualize your signal. You need the right probes to maintain.
ILab Proposal Presentation Nana Kim EE 496 September 22, 2007.
Getting Ready for the NOCTI test April 30, Study checklist #1 Analyze Programming Problems and Flowchart Solutions Study Checklist.
ELECTRICAL MEASUREMENT AND INSTRUMENTATION (3EX05 ELECTRICAL MEASUREMENT AND INSTRUMENTATION (3EX05) - Prof. R. V. Thakur 1.
14.4. Readout systems for innovative calorimeters
Advanced Higher Computing Science
Muon Lab Theory Muons (standard model) Cosmic rays Life time
WBS 1.03 Readout Systems Scope, Cost and Schedule
Tracker TriP-t Test Stand
Planning the Experiment
Speed Sensor Calibration
Comprehensive Design Review
Special edition: Farewell for Valerie Halyo
Hellenic Open University
Special edition: Farewell for Stephen Bailey
University of California Los Angeles
Special edition: Farewell for Eunil Won
Trigger issues for the CALICE beam test
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
Jean-Francois Genat – Herve Grabas Mary Heinz – Eric Oberla
ECE 477 DESIGN REVIEW TEAM 14  SPRING 2010
Presentation transcript:

Proposal Presentation February 16, 2004 Justin Akagi EE 396 Marcus Suzuki EE 496 Brent Uyehara EE 496

Overview Project Objective Background Information Problem Details Approach Potential Problems Things We Might Learn Possible Deliverables

Project Objective To evaluate the triggering capability of the STRAW3 chip used in the ANITA project and develop a servo-loop for dynamically adjusting the trigger threshold.

Background Information

“[ANITA] will examine the ultimate limits of energy in the universe by measurements of completely new kinds of energetic particles: neutrinos.” “Neutrinos are the only known ultra-high-energy particles that are able to reach the earth unabsorbed cosmological distances.” “[It will] probe the nature and origin of the highest energy cosmic rays, via the most sensitive observation to date of their characteristic neutrino by-products.”

Background Information

Problem Details To record high-energy neutrino events the minimum sampling rate is the Nyquist rate. We must also sample data over 256 channels. It is impractical to record this data continuously because it would result in data rates on the order of terabytes/second. To achieve manageable data rates, we should only record sample data during actual neutrino events. To do this, we must be able to adjust the trigger threshold to recognize events.

Approach Debug STRAW3 trigger interface on the RFCeval board Complete Firmware schematics Load and successfully trigger with a parallel to serial readout Documentation RFCeval trigger operation Measurement of trigger threshold curves Put together a servo-loop (feedback loop) Understand scalar feedback variable Specification of the testing protocol Coding/evaluation of control loop

Potential Problems Software Gremlins Hardware Gremlins Xilinx demons Not enough time Only 24 hours in a day Only 7 days in a week Only 15 weeks in the semester Logical flaws Unforeseen problems

Things We Might Learn Better understanding of computer hardware/firmware IC design, fabrication Reading complicated schematics Debugging hardware/firmware problems Testing principles Equipment: logic analyzer, signal oscilloscope, pulse generator Software: Linux, Xilinx Projects don’t always go as well as we hope

Possible Deliverables Triggering capability for the STRAW3 chip IEEE or Nuclear Instr. and Methods paper

Thank You! Questions? No? Thank You!