Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.

Slides:



Advertisements
Similar presentations
Spectrometer Solenoid Update Steve Virostek - LBNL MICE VC 150 August 23, 2012.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Testing Update S. Virostek and M. Zisman Lawrence Berkeley National Laboratory MICO Meeting—RAL May 17, 2010.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Spectrometer Solenoid Lead Testing Update S. Virostek and Mike Zisman Lawrence Berkeley National Lab MICO Meeting January 19, 2010.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.
Spectrometer Solenoid Testing Update S. Virostek and M. Zisman Lawrence Berkeley National Laboratory MICO Meeting—RAL June 7, 2010.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Tech Board Schedule Discussion
MICE Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
MICE Magnets - Virostek 11 MICE Magnets Steve Virostek Engineering Division Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Update Steve Gourlay Steve Virostek Lawrence Berkeley National Lab Steve Gourlay Steve Virostek Lawrence Berkeley National Lab MICE.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
RF Cavity / Coupling Coil Module
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
MICE Spectrometer Solenoid Review Some inputs for the in person meeting to be discussed at the November 13, 2009 phone meeting P.Fabbricatore on behalf.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
LBNL Test Cryostat Preliminary Design Review Tuning – Field Correction Soren Prestemon, Diego Arbelaez, Heng Pan, Scott Myers, Taekyung Ki.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
Spectrometer Solenoid Fabrication & Testing Update S. Virostek and Mike Zisman Lawrence Berkeley National Lab NFMCC 2010 Collaboration Meeting University.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Spectrometer Solenoids MICO 197 Steve Virostek LBNL August 15, 2012.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Abstract: The Muon Ionization Cooling Experiment (MICE) is an international effort sited at Rutherford Appleton Laboratory, which will demonstrate ionization.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
CM-26 Cooler and Lead Test1 Tests of a PT415 Cooler with HTS Leads in the Drop-in Mode Michael A. Green Lawrence Berkeley Laboratory, Berkeley CA 94720,
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
MICE Spectrometer Solenoid Review A summary of P.Fabbricatore on behalf the review board Amalia Ballarino, Elwyn Baynham, Tom Bradshaw, Mike Courthold,
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Background Info Steve Virostek Lawrence Berkeley National Lab MICE Spectrometer Solenoid Review: Phone Meeting October 5, 2009.
Spectrometer Solenoids MICO 194 Steve Virostek LBNL July 25, 2012.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Spectrometer Solenoid Documents and Review Plans Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National.
Spectrometer Solenoid Fabrication & Testing Update S. Virostek and M. Zisman Lawrence Berkeley National Laboratory MICE Funding Agency Committee Meeting—RAL.
Spectrometer Solenoid Update
Spectrometer Solenoid Fabrication Status and Schedule
MICE Coupling Coil Update
Presentation transcript:

Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California at Riverside

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 2 MICE Cooling Channel Layout Spectrometer Solenoid #1 (ready for reassembly) Spectrometer Solenoid #2 (testing in progress)

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 3 Topics Technical review Magnet 2 modifications Magnet 2 cool down and training Coil connection failure Magnet leads testing Magnet 1 update Upcoming task schedule

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 4 Magnet Status Summary Modifications to Magnet 2 including adding of a single stage cryocooler were completed at the end of Feb. ‘10 Several delays in reassembly were caused by vacuum leaks in lead test apparatus, vendor extended illness, redesign of the warm leads, and leaks in the magnet vacuum vessel Six coil training runs were completed last week An open-circuit was found in the internal connection of one of the leads for the M2 coil late last week Magnet will remain cold through next week in order to complete additional power supply and thermal tests Minimal disassembly will be required to assess M2 issue

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 5 MICE Internal Technical Review Spectrometer Solenoid technical review was held on November 18-19, 2009 at LBNL Review committee: Pasquale Fabbricatore (chair), Amalia Ballarino, Elwyn Baynham, Tom Bradshaw, Mike Courthold, and Chris White; Alain Blondel and Andy Nichols (ex officio) The committee came up with several recommendations including the following: - Approved the adding of a single stage cooler to Magnet 2 - Recommended additional thermal modeling of the system - Advised installing additional magnet instrumentation - Suggested Magnet 2 test results be used to determine the final modifications to Magnet 1

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 6 Magnet 2 Modification Summary A modification to Magnet 2 has been carried out which adds a single stage cryocooler to provide additional cooling to the HTS leads and didn’t require full magnet disassembly The single-stage Cryomech AL330 cooler provides 170 W at 55 K and required modifications only in the “turret” area The added cooling power lowered the HTS lead temperature sufficiently to prevent lead burnout Based on results of the lead tests, the design of the warm leads was modified to reduce the I 2 R heat load to the 1 st stage of the cryocoolers Additional instrumentation has also been incorporated

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 7 Original Magnet 2 Configuration HTS leads Cold head 1 st stage Radiation shield Fill & vent lines Cold mass

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 8 Magnet 2 with Added Cryocooler Single-stage cooler Thermal link HTS leads

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 9 Modification Details Added turret space Access port

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 10 Magnet 2 Single Stage Cooler Single stage cooler and flexible copper thermal link installed in Magnet 2

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 11 Installed Leads in Magnet 2

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 12 Vacuum Feedthrough for Magnet Leads Area of vacuum leak

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 13 Vacuum Guard for Leaking Feedthrough Lead vacuum guard

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 14 Vacuum Pumping of the Magnet Reassembled turret (single stage cooler on right) Mechanical pump with cold trap and increased diameter connection

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 15 The magnet was successfully cooled down after the vacuum leak in the lead feedthrough was corrected The single stage cooler resulted in 30-35K lower temperatures at the upper end of the HTS leads The shield temperatures reached levels that are 20-25K lower than the previous cooldown Overall, the addition of the single stage cooler has had the desired effect With all 5 coils connected in series, the following current levels were reached during training: 165 A, 219 A, 238 A, 253 A and 257 A (165 A result likely a power supply issue) Magnet 2 Training and Testing Results

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 16 After the last training run, it was found that one of the connections to the M2 coil was open circuit Based on the voltage taps, the failure occurred between the HTS lead lower end and the internal connection to the coil With the magnet cold, testing has continued on other fronts An additional training run on coils E1, C and E2 (in series) reached a current of 270 A With E1, C and E2 at 150 A, the currents in E1 and E2 were successfully trimmed by ±50A using the 60 A supplies The PS ramp down circuits were successfully tested Assessment of the LHe boil off rate will be made on Monday Magnet 2 Training and Testing Results

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 17 Failed connection to M2 to be assessed within 1 to 2 weeks by grinding off an access window on the magnet turret If the failure is accessible, repairs will be made and the magnet reassembled for cooldown and training completion If the repair requires removal of the cold mass (more likely), then efforts will move to complete Magnet 1 first Subsequent reassembly of Magnet 2 would include all of the modifications incorporated on Magnet 1 Final assessment of Magnet 2 thermal performance not yet complete – should have more information next week (addition of a 4 th 2-stage cooler may be required) Magnet 2 Repair Scenarios

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 18 Magnet Quench during Training

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 19 Magnet Thermal Modeling FEA model of thermal shield, 1 st stage plate and HTS leads Proposed Magnet 1 modifications are also being modeled

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 20 Magnet Thermal Modeling Parametric studies are being conducted to calculate the temperature profile in the 1 st stage copper plate Modeling is being used to help determine the optimum configuration of coolers for Magnet 1 1 st stage Cu plate model

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 21 Magnet Leads Testing A series of off line lead tests were conducted in order to characterize the warm leads and verify the performance of the HTS leads at up to 275 A The temperature drops across the cooler drop-in joint, the intercepts for the room temperature leads and the copper between the leads and the cooler were measured The voltage drops along the leads were also measured The resistive heating in the warm leads was found to be higher than originally predicted; a modified design has been incorporated into Magnet 2

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 22 Cryocooler Setup for Lead Test 1st Stage heater and Tapered Plate 2nd Stage heater and Condenser PT-415 Drop in Cooler

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 23 Magnet Lead Test HTS lead 1 st stage plate Thermal connection

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 24 Cooler Performance with Two IL/A Leads 24 Not in Equilibrium

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 25 Observations from the Cooler Tests The I 2 R heating for the original copper leads used in Magnet 2 was found to be too high (IL/A=5.3x10 6 A/m) The leads were redesigned with an IL/A of 3.0x10 6 A/m The new design reduces the I 2 R heating from 27 watts/lead to 11 watts/lead (at 275 A) The ΔT in the cooler drop-in joint was 1 to 2 K, and the ΔT from the leads to the 1 st stage copper plate was ~1 K The 1 st stage copper plate used in the leads test was likely too thin; the copper plate in the spectrometer solenoid is sufficiently thick with the addition of the single stage cooler

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 26 Magnet 1 Modification Summary implement ideas to improve thermal connection between coolers and shield and lower cold mass support intercept temperature use copper sheets rather than Al cylinders and straps use 1100Al strips outside of shield to improve heat conduction make preparations for using a 4 th 2-stage cooler augment the single-stage cooler to solve both thermal problems decision to add 5 th cooler depends on outcome of Magnet 2 tests modify cold mass fill pipe to facilitate clearing a blockage should one occur

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 27 Magnet 1 Cold Mass Added port for possible 4 th 2-stage cooler

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 28 Magnet 1 Shield Corresponding hole for 4 th 2- stage cooler added to shield shield is also being “beefed up” locally to improve heat transfer to edges – this is where cold-mass support intermediate temperature point is connected – extra heat load from higher temperature at this point is burden for stage 2 of coolers probably more of an issue than bulk radiation load Attachment point for LN 2 reservoir New connection for cooler added Area where cold- mass support intercept attached

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 29 Heat Shield Thermal Connections Previous attempt to improve thermal connection between stage 1 of coolers and shield was a failure – aluminum bands were even worse than original copper strips – next iteration will make connections between 1 st stage copper plates and shield with thick copper sheets

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 30 2-Stage Cooler Modification Top view: A fourth 2-stage cooler could be added as shown below – still leaves room for the single-stage cooler Side view: Single stage cooler 4 th 2-stage cooler

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 31 Schedule Overview (Path 1)

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 32 Schedule Overview (Path 2)

Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 33 Lead tests resulted in a new warm lead design Fixes to Magnet 2 were implemented, and magnet training continued The added single-stage cooler solved the HTS lead problem and lowered the shield temperature A failure occurred in the connection to the M2 coil Assessment of the problem should be completed in the next 2 weeks If the problem is serious, efforts will move to the completion of Magnet 1 Summary