Opportunities in Linear Collider R&D Enabled by GAN Don Hartill Cornell April 19, 2002.

Slides:



Advertisements
Similar presentations
The 4 s of Problem Solving [ open HD video ]open HD video.
Advertisements

Information Technology (IT) activities and careers. Source:
Telecommunications and Electric Power Interdependency Task Force (TEPITF) The President’s National Security Telecommunications Advisory Committee 2008.
Educate to Innovate A SusChem programme for building skills capacity for a sustainable European chemical sector Susan Fleet - Britest Limited Professor.
September 30, 2011 OASIS Open Smart Grid Reference Model: Standards Landscape Analysis.
CERN Summary Ian Bird eInfrastructure Workshop 9 December, 2003.
Nick Walker KEK-DESY meeting 7 th March 2005.
REMOTE TROUBLE SCHOOTING WITH GANMVL Petra Schütt GSI WAO 2007, Trieste September 24, 2007.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Recent Activities toward Worldwide Remote Operations of Accelerators N. Yamamoto, KEK ICALEPCS2003,Korea.
1 Independent Verification and Validation Current Status, Challenges, and Research Opportunities Dan McCaugherty IV&V Program Manager Titan Systems Corporation.
The IGERT Program Preliminary Proposals June 2008 Carol Van Hartesveldt IGERT Program Director IGERT Program Director.
1 PEN-International Deafness Workshops Planning Meeting March 27, 2002.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
View from the NSF: Later Years J. Whitmore (EPP-PNA) M. Pripstein (LHC) M. Goldberg, J. Reidy (EPP) LEPP – CLEO CESR Symposium at Cornell, May 31, 2008.
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
IEEE JOINT TASK FORCE ON QUADRENNIAL ENERGY REVIEW Skilled Work Force Issues Presentation to the U.S. Department of Energy by the IEEE Joint Task Force.
7 February 2007 Global Design Effort 1 Communicating the Machine for the Future Barbara Warmbein ILC Communications.
Review of last year: Global Design Effort Barry Barish ILC Consultations URA, Washington DC 12-May-05.
September 9, 2002David Rubin/ Cornell 1 UCLC Briefing UCLC Briefing to the US LC SG Accelerator Review Committee September 9, 2002 David Rubin Cornell.
Update on the NASA/NOAA/DOE Collaboration on the Utilization of ROA/UAV/UAS for Global Climate Change and Weather Research Will Bolton Sandia National.
Board on Career Development: Strategic Planning David E. Lee Chair Board on Career Development 25 February 2013.
Northwest Center for Public Health Practice Preparing for the Future: Public Health Leadership & Management Preparedness Series The Future of Leadership.
Global accelerator TTF Raimund Kammering DESY MVP TTF2 Review Meeting at Salzau, January 2003.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Linear Collider Common Fund Report M. Hronek1 19.JUN.15 CERN.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
September 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2006.
Infrasound Consortium for Applied Research 2002 Infrasound Technology Workshop, Netherlands Milton Garces Infrasound Laboratory, University of Hawaii,
F R&D on Monolithic and Vertically Integrated Pixel Detectors Special Focus Meeting Marcel Demarteau LCWS08 November 17, 2008 Chicago.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
W. Namkung, 3 nd ILC Workshop, April 1, ILCSC Update 3rd ILC-Korea Workshop April 1, 2005 Kunkook University Seoul, Korea Won Namkung PAL/POSTECH,
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Operations, Test facilities, CF&S Tom Himel SLAC.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Working Smart for the Customer’s Benefit Pam Hutton AASHTO SHRP2 Implementation Manager June 11, 2013.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 1 Update to FARDOG: Technical Division Xband Activities Fermilab NLC Activities.
Human Factors in Telecommunications, Raila Ollikainen Learning relationships - user centred approach to the development of a learning environment.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
J. Mnich GDN Status and Plans Global DetectorNetwork Status and Plans Joachim Mnich DESY March 21 st, 2005 What is the Global Detector Network? Summary.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
IntegratedCorridorManagement 1 Integrated Corridor Management Overview and Activities Jeff Lindley Director, Office of Transportation Management FHWA February.
What’s Happening at Internet2 Renee Woodten Frost Associate Director Middleware and Security 8 March 2005.
Name of presentation Integrating ICT: Part 1. Learning Objectives  increase our understanding of ICT integration  increase our ability to use ICT in.
Randall Sobie University of Victoria IHEPCCC - HEPiX April International HEP Computing Coordination Committee Randall Sobie.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
April 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE Paris April 2006.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
Senior European Volunteers Exchange Network 3rd Network Meeting Vienna November 30 – December 3, 2009 Charlotte Strümpel Status quo of the on-going evaluation.
Accelerator Safety Order Revision Process Frank Kornegay, ORNL SNS Dennie Parzyck, DOE FSO.
Viewpoint Modeling and Model-Based Media Generation for Systems Engineers Automatic View and Document Generation for Scalable Model- Based Engineering.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
SOFTWARE LIFECYCLE. What functions would ISEES perform?
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Goal of the workshop To define an international roadmap towards colliders based on advanced accelerator concepts, including intermediate milestones, and.
ICFA Report to ICHEP 2016 August 2015 to August 2016 J. Mnich (DESY)
Presentation transcript:

Opportunities in Linear Collider R&D Enabled by GAN Don Hartill Cornell April 19, 2002

What is the “Global Accelerator Network” ? There are a number of points of view Remote operation of accelerators Enables several laboratories to participate in the construction and operation of the next large accelerator project - e.g. Linear Collider Leverages scarce accelerator physics and engineering talent Most importantly, helps educate students so there is a next generation of accelerator builders

Some History Concept proposed by A. Wagner, Director of DESY Two ICFA Task Forces formed to assess the problem - one on policy issues and one on technical issues Both reports available at First Workshop on Remote Operation of Accelerator Facilities held at Cornell March 21-23, Summary report available around May 1, 2002 Second Workshop with focus on possible experiments at Shelter Island September 17-20, 2002

Remote Operation Already many examples from NASA, Ground based Astronomy Systems have to be designed with enough hooks to enable remote diagnostics of problems (N. Toge - elected not to use remote operation of ATF facility at KEK because not included in design) We already remotely operate accelerators - just a question of how far away you are No technical show stoppers

Remote Operation Policy This is the interesting question Safety issues and government rules are key Needs to be addressed very early in the internationalization of the Linear Collider project

Communication Probably the most difficult problem R&D is being done by industry High price of business travel is a strong motivator Already a number of products that use the web - Netmeeting from Microsoft, conferencing from Worldcom Most collaborations already depend heavily on conventional video conferencing It will only get better

An Example of a Web Video Conference

A Video RelayService Provides translation from voice to ASL Performance is like a normal telephone conversation This example is from

Next Steps Continue efforts in remote operation of CLEO and other detectors Begin to use available conferencing tools to assess their effectiveness Shelter Island Workshop to outline possible experiments on remote operation of accelerator systems. TTF at DESY, NICADD (A0 test facility at Fermilab) are possibilities

Opportunities for University Groups Use the tools to get involved in accelerator physics research to provide the horsepower to actually construct the Linear Collider As the test facilities develop there will be many opportunities to confront simulations with experiment We can use the help in getting the most out of CESR C by developing “smart” tuning software as an example