Alarms and Events - Processing and Logging Project Mentors Suneel Kumar Venugopal Vanga.

Slides:



Advertisements
Similar presentations
Support.ebsco.com EBSCOadmin Reports & Statistics Tutorial.
Advertisements

Welcome to eDMR This PowerPoint presentation is designed to show eDMR users how to login and begin using the eDMR system.
Module 3: Business Information Systems
Micro Control Solutions Stability System II rev. 6.4
Training Course: Task List. Agenda Overview of the Task List Screen Icons across the top Making Appointments Viewing Appointments & Filters Working Your.
Stability Lab Information Manager Software by Stability Professionals, for Stability Professionals.
20&27 May Agenda 1.Highlight the difference between system flow of e- Invoice and paper invoice – 15 minutes 2.Demonstrate the operation procedure.
Enabling the Next Wave of Connectivity ™ Pronto OSS Release 4.0 PRODUCT OPERATIONS Pronto UniFi OSS Release R4.0 January 2006.
Easy DCR Development Control Regulation Online Building Permission System.
SEEM 3430 – Tutorial 2 Two Examples on Requirement Definition and Use Cases.
Multi-DNC Data Collection/Monitoring
Web Pricing User Manual
UNESCO ICTLIP Module 4. Lesson 3 Database Design, and Information Storage and Retrieval Lesson 3. Information storage and retrieval using WinISIS.
25 July Standard and Searchable Reports. 25 July Report Types Standard Reports –“Canned” reports for the most common types of data inquiries.
Mobile Device must be registered with web application for authentication If date/time of device is changed it requires online authentication Internet.
SWIM WEB PORTAL by Dipti Aswath SWIM Meeting ORNL Oct 15-17, 2007.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 1 GLAST Large Area Telescope: I&T Integration Readiness.
Background Background Problem domain Current situation Proposed solution System architecture Functional requirements Non-functional requirements Major.
Alarms and Events Processing Group No. 2 Project Guide: Prof. N.D.R.Sarma.
Alarms and Events Logging Project Mentors: Suneel Kumar Venugopal Vanga.
New Student Orientation Registration System Stephen Nakamura EE496 Final Presentation Fall 2008.
Prepared by ASM Research, Inc. 1 INTRODUCING the New AITAS for Non-DOD DAU Students Available for FY02 Acquisition Training Application System.
Bonrix Track & Trace System A GPS Based Vehicle Tracing System (SMS, GPRS/3G, Offline) Bonrix Software Systems Ahmedabad (INDIA) Website:
Check Disk. Disk Defragmenter Using Disk Defragmenter Effectively Run Disk Defragmenter when the computer will receive the least usage. Educate users.
1 Action Automated Security Breach Reporting and Corrections.
PROACTIS: Supplier User Guide Contract Management.
Presented By: Shashank Bhadauriya Varun Singh Shakti Suman.
Structure Commander Technical Presentation. Copyright (C) MCS 2013, All rights reserved. 2 STRUCTURE COMMANDER Introduction Product Overview.
DEMONSTRATION FOR SIGMA DATA ACQUISITION MODULES Tempatron Ltd Data Measurements Division Darwin Close Reading RG2 0TB UK T : +44 (0) F :
Main Log-In Page For Any Application, Type your User Name and Password Main Log-In Page For Any Application, Type your User Name and Password.
TRANSACTION PROCESSING SYSTEM (TPS)
This presentation will guide you though the initial stages of installation, through to producing your first report Click your mouse to advance the presentation.
Provider Refresher August Send requests for login credentials and questions to:
Connected Vehicle Design Review Southwest Research Institute
Passive Monitoring with Nagios Jim Prins
PRIOS ARA Limited Agent User Instructions PRIOS ARA Limited Agent User Instructions Professional Repossessors Interactive Operating System.
Web Interface for Health Care Database Priyanka Walke.
Weeding in ALEPH Library Staff Training © South Dakota Library Network, 2013 ©Ex Libris (USA), 2011 Modified for SDLN Version
Using the Georgia Online Assessment System(OAS) We will lead the nation in improving student achievement. Kathy Cox, State Superintendent of Schools.
 Maintains the Instrument Database  Generates the Calibration Schedules  Maintains Calibration Records  Provides Facility to enter All types of.
SSE OPC and DATABASES. Overview… Setup the SSE OPC to save data to a MS Access database file (mdb) Setup the SSE OPC to save data to MS SQL database THE.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Network Management Tool Amy Auburger. 2 Product Overview Made by Ipswitch Affordable alternative to expensive & complicated Network Management Systems.
PD-Online.ca How to use the online administration of Personality Dimensions®
Eurotrace Hands-On The Eurotrace File System. 2 The Eurotrace file system Under MS ACCESS EUROTRACE generates several different files when you create.
Module 10: Monitoring ISA Server Overview Monitoring Overview Configuring Alerts Configuring Session Monitoring Configuring Logging Configuring.
TEAM Basic TotalElectrostatic ManagementAwareness&
Virtual Interaction Manager
1 Action Automated Security Breach Reporting and Corrections.
WELCOME TO SEMINAR ON SCADA WELCOME TO SEMINAR ON SCADA Presented by: ANIL KUMAR RAUT Adm No:33IE/2k.
Local Alarm Station Data Acquisition, Storage and Visualization for Radiation Portal Monitor (RPM).
Reports and Learning Resources Module 5 1. SLMS Primary Administrator Training Module 5: Reports and Learning Resources 2.
Manage Attendance. C1-AT Manage Attendance by Class and Subject Teacher Description: –This function allows Class Teacher to; Manage Attendance Roster.
Department of Tourism Computerization Project Phase I Accreditation JULY 2009.
Module 10: Preparing to Monitor Server Performance.
C-Cure Training Training For Student Staff. What C-Cure Does: Administration Client  Look up resident information  Give resident access  Change card.
T EST T OOLS U NIT VI This unit contains the overview of the test tools. Also prerequisites for applying these tools, tools selection and implementation.
Chavez, Melesan Karen De Luna, Lin Detera, Patrick Kevin Martinez, Jellene Joy Dental Clinic Database System Functional Requirements.
Day in the Life (DITL) Production Operations with Energy Builder Copyright © 2015 EDataViz LLC.
QC – User Interface QUALITY CENTER. QC – Testing Process QC testing process includes four phases: Specifying Requirements Specifying Requirements Planning.
FHA Training Module 1 This document reflects current policy related to this topic. Its content is approved for use in all external and internal FHA-related.
Bureau of Workers’ Compensation. Moving from the IAIABC EDI Release 1 to Release 3 Standard for First Reports of Injury (FROI) claim filings. Implementing.
1 A Look at the Application Authorized users can access Communicator! NXT from any Internet-capable computer via the Web.
Customer Care & Help Desk. Content  What is Help Desk?  Who should use these?  Features of Help Desk  Hierarchy of Help Desk (Level of User)  Flow.
By Hello Team Awesome World™.  To avoid strangers using others’ keys, cards, and passwords to enter the buildings, our team will develop a face recognition-based.
Local Alarm Station Data Acquisition, Storage and Visualization for Radiation Portal Monitor (RPM).
Architecture Review 10/11/2004
CCS Engineering Tools The tools are used help development and debugging of VLT SW control applications This presentation will provide a general view of.
Presentation transcript:

Alarms and Events - Processing and Logging Project Mentors Suneel Kumar Venugopal Vanga

Components of Alarm and Event Detection System  Value Generation (Simulation of field values)  Alarm and Event Monitoring  Alarm and Event Limit Check (Control)  Alarm and Event Reporting  GUI or Interface  Database and Data Logging

Field Values Simulation Values are generated by a random generator program (a simulator for the RTU). It generates random values according to the following format.  V_055_IIIT_001_24/02/2004_11:50 V,ICan be V/I etc V → Voltage I → Current 055Voltage level (55 KV here) IIITSubstation name 001Unique identifier 24/02/2004Date 11:50Time

Categorization of alarms/events: Depending on the value we can prioritize the alarm. Alarm levels of severity or Priority Level 0 Alarms → Audible + Onscreen Display in Red Level 1 Alarms → Onscreen Display in Blue Level 2 Alarms → Onscreen Display in Green Red Very Very High Alarm Very Very Low Alarm Blue Very High Alarm Very Low Alarm Green High Alarm Low Alarm

Display of alarms

Storage structure of Alarms in database Alarm Date and Time Acknowledgement Date and Time Message Value Alarm Type Alarm Id Device Name or ID Alarm status (Acknowledge / Unacknowledged) Name of the acceptor

Storage structure of Alarms in database Alarm Date and Time Acknowledgement Date and Time Message Value Alarm Type Alarm Id Device Name or ID Alarm status (Acknowledge / Unacknowledged) Name of the acceptor

Storage structure of Events in database Event Date Event Time Message Value Event Type Device Name or ID Event Id

Format of the file storing limits The file will have several lines of data. Each line would be of the form Scada Point Name Voltage/ Current etc. Alarm/EventLimitPriority of substation Priority for the alarm

Alarm/Event Monitoring The monitor program checks for alarms/events after every 2 seconds. It transfers the value to the Limit Check module.

Alarm/Event Limit Checks Checks for the limits associated with alarms/events. Depending on weather and other parameters limit checks are performed. If it is an alarm/event message is given to the GUI to display it

Alarm/Event Reporting Automatically report alarms/events in the interface. Automatically updates the interface. Maintaining the log report or record of the Events and Alarms of past days or weeks. The name of the operator who accepted the alarm along with date and time of clearance.

Alarm and Event Control System Functionalities or conditions for occurrences of Alarms and Events are defined, to detect the Alarm The alarm may be enabled or disabled for a particular time period or scheduled.

GUI: Display alarms/events according to priority and time as and when they arrive with their values. Allow user to acknowledge specific or all alarms. Allow user to attach messages or comment with each alarm/event he acknowledges or the alarms/events previously present into the database. Allow users to display the events for various time periods, by a particular SCADA point, priority etc. Allow users to sort alarms/events according to a category. Allow users to update the limits and store it in a file. Online help will be provided. User can search for alarms and events depending on their type.

Example of Sample Interfaces for Displaying Alarm

Database and Data Logging The database acts as a repository of each generated values and timestamp is fixed to each entry in database and these values are later analyzed and displayed for decision making mechanisms. The data coming from field is analog and stored in the database as both analog and digital with their type defined. Storage of Events related data in user defined format in database in minute, hourly, daily, weekly basis with its status The common practice for record keeping is to capture the Pre selected datasets at periodic intervals

PROCESSING: Login and Password Authentication Accept the username and password and validate it. Start the alarm/event simulator. Alarm/Event monitoring system collects the data from the Alarm/Event generator system after every 2 seconds. Limit Check module then checks the values and send it to GUI and logged into the database depending upon the range. GUI shows current alarms and events by getting values every two seconds. User acknowledges alarms and attaches messages to events and alarms. The following things can be done after the above steps  User edits limits and stores them back to the file  User searches for alarms and events.  User can update information already present

Tools Used: GUI: VC++ 6 Programming: C++ Database: MS Access

Thank you Group 16 Arvind Tiwary Ashutosh Parida L. Jagannathan Nitin Gupta