April, 3-5, 2006 J.L. Halbwachs : VIM0 1 The VIMO software : What are VIMOs ? VIMO: “Variability-Induced Mover with Orbit” = astrometric binary with a.

Slides:



Advertisements
Similar presentations
Gage R&R Estimating measurement components
Advertisements

Chapter 6 Confidence Intervals.
Linear Regression.
Structural reliability analysis with probability- boxes Hao Zhang School of Civil Engineering, University of Sydney, NSW 2006, Australia Michael Beer Institute.
Objectives 10.1 Simple linear regression
GENIUS kick-off - November 2013 GENIUS kick-off meeting The Gaia context: DPAC & CU9 X. Luri.
Fundamentals of Data Analysis Lecture 12 Methods of parametric estimation.
Chapter 2: Second-Order Differential Equations
Faint coronal structures and the possibilities of visualization Marcel Bělík (1) Miloslav Druckmuller (2) Eva Marková (1) Ladislav Křivský (1) (1) Observatory.
Inferential Statistics & Hypothesis Testing
1 BINARY CHOICE MODELS: LOGIT ANALYSIS The linear probability model may make the nonsense predictions that an event will occur with probability greater.
MIT and James Orlin © Nonlinear Programming Theory.
Maximum likelihood (ML) and likelihood ratio (LR) test
Point estimation, interval estimation
Maximum likelihood Conditional distribution and likelihood Maximum likelihood estimations Information in the data and likelihood Observed and Fisher’s.
Maximum likelihood (ML) and likelihood ratio (LR) test
Linear and generalised linear models
BCOR 1020 Business Statistics Lecture 18 – March 20, 2008.
Linear and generalised linear models
Properties of Random Numbers
BCOR 1020 Business Statistics Lecture 24 – April 17, 2008.
Maximum likelihood (ML)
Statistics for Managers Using Microsoft® Excel 7th Edition
Chapter 12 Section 1 Inference for Linear Regression.
Principles of the Global Positioning System Lecture 10 Prof. Thomas Herring Room A;
Confidence Intervals W&W, Chapter 8. Confidence Intervals Although on average, M (the sample mean) is on target (or unbiased), the specific sample mean.
Statistics for Managers Using Microsoft® Excel 7th Edition
Review of normal distribution. Exercise Solution.
Objectives of Multiple Regression
Review of Statistical Inference Prepared by Vera Tabakova, East Carolina University ECON 4550 Econometrics Memorial University of Newfoundland.
Computer Implementation of Genetic Algorithm
Efficient Model Selection for Support Vector Machines
Chapter 6 Confidence Intervals 1 Larson/Farber 4th ed.
Chapter 15 Modeling of Data. Statistics of Data Mean (or average): Variance: Median: a value x j such that half of the data are bigger than it, and half.
Understanding Inferential Statistics—Estimation
6 Chapter Confidence Intervals © 2012 Pearson Education, Inc.
Confidence Intervals Chapter 6. § 6.1 Confidence Intervals for the Mean (Large Samples)
Random Sampling, Point Estimation and Maximum Likelihood.
R. Kass/W03P416/Lecture 7 1 Lecture 7 Some Advanced Topics using Propagation of Errors and Least Squares Fitting Error on the mean (review from Lecture.
1 LAVAL UNIVERSITY DEPARTMENT OF GEOMATICS Mohammed Boukhecha (Laval University) Marc Cocard (Laval University) René Landry (École technique supérieure.
1 Video Camera for Photometry: It can be done.. ….but… IOTA July 12, 2014 John Menke x x x
Module 1: Statistical Issues in Micro simulation Paul Sousa.
Modern Navigation Thomas Herring
Valuation of Asian Option Qi An Jingjing Guo. CONTENT Asian option Pricing Monte Carlo simulation Conclusion.
5th DMS/PS meeting October 8 Welcome! DMS - Paris meeting 5 Meeting agenda  Halbwachs J-L.Astro. binaries with a variable component  Pourbaix.
Brian Macpherson Ph.D, Professor of Statistics, University of Manitoba Tom Bingham Statistician, The Boeing Company.
The Group Lasso for Logistic Regression Lukas Meier, Sara van de Geer and Peter Bühlmann Presenter: Lu Ren ECE Dept., Duke University Sept. 19, 2008.
Time series Decomposition Farideh Dehkordi-Vakil.
A Process Control Screen for Multiple Stream Processes An Operator Friendly Approach Richard E. Clark Process & Product Analysis.
CSC 211 Data Structures Lecture 13
Chapter 5 Parameter estimation. What is sample inference? Distinguish between managerial & financial accounting. Understand how managers can use accounting.
Unit 6 Confidence Intervals If you arrive late (or leave early) please do not announce it to everyone as we get side tracked, instead send me an .
Asteroids Rotation Period Study the photometric curve Rotation period Shape Is it binary? Surface composition spectroscopy.
Review 1 Arrays & Strings Array Array Elements Accessing array elements Declaring an array Initializing an array Two-dimensional Array Array of Structure.
Sampling and estimation Petter Mostad
Review of Statistical Inference Prepared by Vera Tabakova, East Carolina University ECON 4550 Econometrics Memorial University of Newfoundland.
Brief Review Probability and Statistics. Probability distributions Continuous distributions.
Louisiana Department of Transportation and Development Forecasting Construction Cost Index Values Using Auto Regression Modeling Charles Nickel, P.E. Cost.
Dynamics of Binary Search Trees under batch insertions and deletions with duplicates ╛ BACKGROUND The complexity of many operations on Binary Search Trees.
Review of Statistical Inference Prepared by Vera Tabakova, East Carolina University.
Hypothesis Testing. Statistical Inference – dealing with parameter and model uncertainty  Confidence Intervals (credible intervals)  Hypothesis Tests.
Fundamentals of Data Analysis Lecture 4 Testing of statistical hypotheses pt.1.
Fundamentals of Data Analysis Lecture 11 Methods of parametric estimation.
STAT 312 Chapter 7 - Statistical Intervals Based on a Single Sample
Generalized Linear Models
Statistical Methods For Engineers
Modelling data and curve fitting
Today’s class Multiple Variable Linear Regression
Where did we stop? The Bayes decision rule guarantees an optimal classification… … But it requires the knowledge of P(ci|x) (or p(x|ci) and P(ci)) We.
Presentation transcript:

April, 3-5, 2006 J.L. Halbwachs : VIM0 1 The VIMO software : What are VIMOs ? VIMO: “Variability-Induced Mover with Orbit” = astrometric binary with a component with variable brightness. Parameters: 5 or 6 for the single-star astrometric solution: , , ,  ,  , [   ]. 4 Thiele-Innes parameters: A, B, F, G. 3 non-linear “normal binary” terms: P, e, T 0 1 VIMO term: g = m 2  (1 + q) / q  a 0 = a 1 (1 - g m T )

April, 3-5, 2006 J.L. Halbwachs : VIM0 2 The VIMO strategy: search of g (1) g = m 2  (1 + q) / q  a 0 = a 1 (1 - g m T ) Minimum g : comes from the minimum variation of a 0 for a VIM effect;  a 0 > c   X, a 1 = a  q / (1+q)  g min = c   X m min / [ a Max (1 –  m ) ] with  m = m min -m Max >0 Maximum g : m 2 > m T  g Max = m min (1 + q min ) / q min  assuming a Max = 50 mas,  X = 40  as, c  = 1,  m = 1 mag, q min = 0.5, g m min ranges from up to 3. For security, a Max = 100 mas, c  =1/4 and q min =0.01 are assumed, leading to g Max /g min = when  m=1 mag.

April, 3-5, 2006 J.L. Halbwachs : VIM0 3 The VIMO strategy: search of g (2) Fortunately, the interval of g may be restricted assuming fixed P (ie 100 d), and e (ie 0) and trial values of g, all the other parameters are derived (linear system). When the star is a VIMO,  2 (g) is usually varying for g around its actual value  new interval : g 0 /10 – 10 g 0 (100 trial values) Having  g, we adapt the method of Pourbaix & Jancart (2003)

April, 3-5, 2006 J.L. Halbwachs : VIM0 4 The VIMO strategy: search of P Assuming e =0 and using trial P and g, we have a system of linear equations. P is then generally corresponding to the minimum of  2 (P,g) (Pourbaix & Jancart, DMS-PJ-01, 2003). Otherwise, up to 5 minima of  2 (P,g;e=0) are tested. If an acceptable P is still not found, other eccentricities are tried: e=0.7 (6 trial T 0 ) and e=0.9 (8 trial T 0 )  Time-consuming !!

April, 3-5, 2006 J.L. Halbwachs : VIM0 5 The VIMO strategy: the solution For a minimum of  2 (P, e=0), preliminary values of e and T 0 are still obtained trying e=0.1 and e=0.5 in place of e=0; having starting values for P (  log P ), g (  log g), e (  -log(-log e)), T 0 and for the “linear” parameters, a solution is calculated using the Levenberg-Marquardt method of  2 minimisation. Other minima of  2 are tried until a solution with GOF < 3 is obtained (  risk to keep a local minimum when the orbit is small !)

April, 3-5, 2006 J.L. Halbwachs : VIM0 6 VIMO simulation: hypotheses VIMO with large orbits : a = 50 mas,  X = 40  as, f(log P ;10days < P < 10 years) = Cst, f(e < 0.9) = Cst, f(q ; 0.1 < q < 1.2) = Cst ( q = M 2 / M 1, where “1” refers to the variable) m 2 -m 1 = 6.6 log q +  m ; f(  m ) = N (0,1) photometric variations  a 0 varying   a 0  2.5  X

April, 3-5, 2006 J.L. Halbwachs : VIM0 7 VIMO simulation: results Solutions for 93 systems/100 = = 0.16  E/I = 1.03  E/I = 1.11

April, 3-5, 2006 J.L. Halbwachs : VIM0 8 The Goodness-Of-Fit problem F2 (Hipparcos, vol 1, 112) : inadequate since the model is not linear. Degrees of freedom derived by Fourier transform (Pourbaix DMS-DP-02, 2005) : e and T 0 exchanged with (many) linear terms. With large VIMO orbits : = 0.12,  = 1.4 = 2.2,  = 1.7 both  N (0,1)

April, 3-5, 2006 J.L. Halbwachs : VIM0 9 Still to be done.. -Adaptation of the software to small orbits (trying other minima of  2 ). -To compute faster ! current rate : 10 stars/hour (PC). The number of trial values could be reduced. - False candidates must be discarded : acceleration+VIM solutions must be searched (3 VIM acc parameters).

April, 3-5, 2006 J.L. Halbwachs : VIM0 10 Searching VIMO in Hipparcos.. Hipparcos published archive: Stochastic solutions. Epoch Photometry Annex: H-mag for each transit Intermediate Astrometric Data: Average abscissae for 1 orbit of the satellite (10 h) !!!  no short period variable, no variable with fast variation (WW UMa, BY Dra, flare stars..)  no nearby stars  no astrometric orbit with P  3 years,.. but an opportunity to see the difficulties with real data

April, 3-5, 2006 J.L. Halbwachs : VIM0 11 Is HIP a VIMO (1) ? single star model:  2 =280, F2=17.8 (NDAC) 1st VIMO solution :  2 = 26.5, F2=-0.17 P = (1595  1574) d g = (4.3  2.1) A SB+AB (Feckel,..,Jancart & Pourbaix 2005) : P = 2092 days

April, 3-5, 2006 J.L. Halbwachs : VIM0 12 HIP assuming SB elements With NDAC data:  2 = 26.4, F2=-0.18, GOF F =1.02 P = (2147  3855) d g = (3.7  2.7) a 1 = 91 mas (instead of 48..) New VIMO solution starting from the SB elements: NOT a VIMO !!!

April, 3-5, 2006 J.L. Halbwachs : VIM0 13 Searching g in stochastic stars “Stochastic stars” = single stars generated with  X much larger than assumed in the VIMO calculation.

April, 3-5, 2006 J.L. Halbwachs : VIM0 14 Conclusion A prototype software providing reliable solutions when variability induces important astrometric effects, but inept results otherwise...  The software must still be adapted to small orbits VIMO solutions must be searched only when no “normal” solution can be found must be kept only when the estimated errors are reasonable

April, 3-5, 2006 J.L. Halbwachs : VIM0 15 Searching VIMO in Hipparcos..